AMPERIF PREVENTATIVE MAINTENANCE
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP94T00858R000600890001-6
Release Decision:
RIPPUB
Original Classification:
U
Document Page Count:
8
Document Creation Date:
December 28, 2016
Document Release Date:
February 12, 2008
Sequence Number:
1
Case Number:
Publication Date:
April 13, 1983
Content Type:
REPORT
File:
| Attachment | Size |
|---|---|
| 289.81 KB |
Body:
i
Approved For Release 2008/02/12 : CIA-RDP94T00858R000600890001-6
DMINISThATIVE? 1. WS ONLY
DATA CENTER OPERATIONS BRANCH
NDS OPERATIONS PROCEDURE MANUAL SYSTEMS SW & HW
NO. P-A004 13 April 1983
AMPERIF PREVENTATIVE MAINTENANCE
SYMBOLIC TIT
ORIGINATOR: STAT
1" OMIY
Approved For Release 2008/02/12 : CIA-RDP94T00858R000600890001-6
Approved For Release 2008/02/12 : CIA-RDP94T00858R000600890001-6
Aft
DATA CENTER OPERATIONS BRANCH
DCOB PROCEDURE OPERATIONS-GENERAL
No. PD-A-0005/83 26 January 1983
AMPERIF PREVENTIVE MAINTENANCE
PURPOSE
1. The purpose of this Procedure is to formalize a Preventive Maintenance
(PM) schedule on Amperif equipment. This equipment includes Amperif Solid State
Drum (SSD) and controllers, cache disc subsystem controllers, data copy,
uninterrupted power source (UPS), and individual disc drives. This Procedure
should be used as a reference in scheduling, performing, and tracking
preventive maintenance on Amperif equipment.
REFERENCES
2. The following documents are applicable to the implementation of this
Procedure:
a. CSD Plan CSD-81-0001 CSD Management Plan
b. CSD Instruction No. 50-0008 NDS Schedule of Operations
APPLICABILITY
3. All personnel responsible for the stability of the Amperif equipment.
All Amperif engineers performing maintenance on Amperif equipment.
POLICY
4. The Data Center Operations Branch (DCOB) is required to maintain all
NDS computers, peripheral equipment, and communications hardware as described in
the CSD Management Plan (CSD-81-0001).
BACKGROUND
5. This Procedure evolved from a TEM, on 23 September 1982, attended by
DCOB and Amperif maintenance personnel. All maintenance and scheduling items
were agreed to by both parties.
ADMINISTRATIVE-INTERNAL USE ONLY
Approved For Release 2008/02/12 : CIA-RDP94T00858R000600890001-6 j
Approved For Release 2008/02/12 : CIA-RDP94T00858R000600890001-6
DCOB PROCEDURE OPERATIONS-GENERAL
No. PD-A-0005/83 26 January 1983
PROCEDURE
6. Amperif equipment PM is to be conducted as an on-going effort. To
accomplish that effort PM will be performed in three phases: weekly, monthly,
and semi-annually.
WEEKLY PM
7. Amperif will perform weekly PM every Wednesday from 1600 to 1700 hours
except on.the first Wednesday of the month. This PM will not require an outage
to the NDS operational system. If the Amperif engineers discover a potential
fatal problem within the Amperif hardware, they will notify the on-duty Operations
Control Officer (OCO). The OCO should insure an operational system outage is
scheduled as soon as possible for corrective maintenance.
MONTHLY PM
8. Amperif will perform monthly PM on the first Wednesday of the month
from 1900 to 2200 hours. The Operations Support Section (OSS) is required to
schedule a operational system outage for this period. Prior to Amperif PM,
Data Center Operations Section (DCOS) personnel will copy the SSDs to tape. This
tape will be used to verify the data copy feature of the SSDs. SSD data is to be
restored from tape if the data copy does not verify correctly. Amperif will
check the UPS for proper charge, check and log air flows for each disc drive, and
insure proper operation of data copy feature for the SSDs and cache.
SEMI-ANNUAL PM
9. Amperif will perform semi-annual PM on individual disc drives, assuring
all drives have,been checked, voltages adjusted, cleaned, and inspected during
the six-month period. This PM can be performed on-line with no operational
system outage. At opportune times the DCOS will substitute a spare drive for an
operational drive, on advice from the OCOs, to insure that Amperif will always
have a drive to PM. The OCOs are responsible for tracking which drives have
or have not had semi-annual PM.
10. The Operations Support Section (OSS) will notify Amperif maintenance of
extended NDS computer system outages if these outages do not require use of
Amperif equipment. Amperif will be scheduled to use this time to perform any
maintenance they feel necessary.
ADMIRalpATIVE-INITL RNAAL USE ONLY
Approved For Release 2008/02/12 : CIA-RDP94T00858R000600890001-6
Approved For Release 2008/02/12 : CIA-RDP94T00858R000600890001-6
DCOB PROCEDURE OPERATIONS-GENERAL
No. PD-A-0005/83 26 January 1983
11. To further assist Amperif in fault isolation and error detection, the
OCOs are responsible for logging recoverable errors. Attached are forms which will
be.completed by the OCOs and Amperif to assist all interested parties in further
tracking of errors and PM items.
STAT
Attachment: a/s
Distribution: D
3
A MINTISTRATNE-INTERNAL USE ONLY
Approved For Release 2008/02/12 : CIA-RDP94T00858R000600890001-6
Approved For Release 2008/02/12 : CIA-RDP94T00858R000600890001-6
Record readings in box, if filter is replaced initial box.
JAN FEB.
MAR. APR.
MAY JUN.
JUL. AUG. SEP.
CCT.
NOV. DEC.
DAA
DAB
DAC
DAD
l
i
DAE
L
E
DBA
`DBB
DBD
DBF
DBH I
DBI I
DCA
DCB
DCE
D
DDA
DDB
DDD
DDE
DDF
DDG.
DDJ
y
Approved For Release 2008/02/12 : CIA-RDP94T00858R000600890001-6 ,
Approved For Release 2008/02/12 : CIA-RDP94T00858R000600890001-6
-poi uiuc.R wnen rri_.i5 p,--ijWmea.
B. Re.ei to M requirement sheet for meai-ing
of letters.
DCA
EDCB DCC J DCD SSD
A B I C
Approved For Release 2008/02/12 : CIA-RDP94T00858R000600890001-6
Approved For Release 2008/02/12 : CIA-RDP94T00858R000600890001-6
II. MONTHLY PM
A. Insert date in block when PM is performed.
B. Refer to PM requirement sheet for meaning
of letters.
DCA
DCB
DCC
DCD
SSD
A
lT
l7
rT
B
C
A
B
C
A
B
C
A
B T C
JANUARY
FEBRUARY
MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
NOVEMBER
i
DECEMBER
Approved For Release 2008/02/12 : CIA-RDP94T00858R000600890001-6
Approved For Release 2008/02/12 : CIA-RDP94T00858R000600890001-6
A. In =date in block when PM is Pr -used.
B. Refer to PM requirement sheet for i--eaning of letters.
DAA
DAB
DAC
DAD
DAE
DBA
DBB
DBC
DBD
DBE
DBF
DBG
DBH
DBI
DCA
DCB
DCC
DCD
DCE
DCF
DCG
DCH
DCI
DDA
DDB
DDC
DDD
DDE
DDF
DDG
DDH
DDI
DDJ
C D E F
E F G
DAA
DAB
DAC
DAD
DAE
DBA
DBB
DBC
DBD
DBE
DBF
DBG
DBH
DBI
DCA
DCB
DCC
DCD
DCE
DCF
DCG
DCH
DCI
DDA
DDB
DDC
DDD
DDE
DDF
DDG
DDH
DDI
DDJ
A B
I~
I
T:~
Approved For Release 2008/02/12 : CIA-RDP94T00858R000600890001-6
Date due . Date due
II
L-1
1 it