CABLE TO AIG 7840 FROM NPIC
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B03824A000200020062-5
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
5
Document Creation Date:
December 28, 2016
Document Release Date:
November 12, 2008
Sequence Number:
62
Case Number:
Publication Date:
February 19, 1970
Content Type:
CABLE
File:
Attachment | Size |
---|---|
![]() | 159.79 KB |
Body:
Approved For Release 2008/11/12 CIA-RDP78BO3824A000200020062-5
? (8 October 1969)
CLASSIFIED .MESSAGE (-' ROUTING
ORIG
UNIT
EXT
DATE : , 9 21o
TO AIG 781+0; NFOIO, FT MEADE, MD;
INFO
1970
PRIORITY
OP RATIONAL
IMMEDIATE
IUT69379
TO INFO
SEE ABOVE
25X1
25X1
REPRODUCTION BY OTHER THAN THE ISSUING OFFICE IS PROHIBITED. Copy No.
Signal Center Transmission Copy - DO NOT DETACH - Forward with Master
GIANT SCALE (SEA)', (SEE #20B FOR N. KOREA)
LB 19 18 52Z
Approved For Release 2008/11/12 : CIA-RDP78BO3824A000200020062-5
Approved For Release 2008/11/12 : CIA-RDP78BO3824A000200020062-5
UNIT
EXT
DATE Feb 70
1
SEC R E T
i
.L-f 20 34
SECTION OF SECTIONS
1 14 25 32 43
SUPIR:CA SER: 000340 PRJ: GS MSN: S00224 DTZ: 700203H
K
PAGE 1 OF 4
DAY PHOTO. C CAMERA ON 04562, OFF o6452. CAMERA TYPES ARE
A-HR308B MOD (TEOC) AND C-9085/64 (ooc). E::::::-] SER.
KLoo16, DTG 050015Z FEB 70. REF (B) NPIC, SER. 000355, DTG
122112Z FEB 70. PACOM NVN CPFL, ICOD 29 DEC 69. THIS MESSAGE
SUPPLEMENTS INFORMATION CONTAINED IN REFS.
PART I.
NONE
PART II. SIGNIFICANT RESULTS
am
RELEASING OFFICER AUTHENTICATING OFFICER
Approved For Release 2008/11/12 : CIA-RDP78BO3824A000200020062-5
Approved For Release 2008/11/12 : CIA-RDP78BO3824A000200020062-5
14 27 39
URG: SIR:
: UTM: 48QTJ064122
STA: UCO
DES:AN ADDITIONAL 12 NM OF INTERMITTENT ROAD IN EARLY STAGES OF
CONSTRUCTION ARE OBSERVED EXTENDING NE ALONG THE WESTERN BANKS
OF THE NAM PHAK (RIVER) FROM ITS PREVIOUS TERMINUS AT 20-52-18N
102-08-20E (UTM TJ0231o4) TO ITS PRESENT TERMINUS AT 21-01-OON
102-14-21E (TJ128263). CONSTRUCTION ACTIVITIES ON THE BRIDGE
SPANNING THE NAM 'PHAK (RIVER) NEAR THE VILLAGE OF MUONG LA AT
TJO11097 APPEAR TO BE NEARING A MID-STAGE.
GFW:3 POSS TRUCKS
MPR:AMS SERIES L7015, SHEETS 5450-IV AND 5451-III
Approved For Release 2008/11/12 : CIA-RDP78BO3824A000200020062-5
URG:
STA: UKN
PAGE 2 OF 4
NEW POL PIPELINE SEGMENT
31 44 52 54
CTY:VN 183950N1053950E INT:FCV SC
27 39
IFR:Ulm: 48QwF'699638
DES:A NEW SEGMENT OF POL PIPELINE EXTENDS FROM UTM WF699638 TO
WF7o1620. THE PIPELINE ORIGINATES AT THE VINH NW PIPELINE DEPOT
AND EXTENDS SW APPROXIMATELY 1.9 NM. WHEN COMPLETED THE SEGMENT
WILL PROBABLY CONNECT WITH THE LINE EXTENDING NORTH TOWARD VINE
FROM THE MAIN NORTH-SOUTH LINE NEAR LANG LUYEN PPS.
MPR:AMS SERIES L7014, SHEET 6146-III
1
ITMOO
ROAD CONSTRUCTION (NEW) ROUTE 45
31 44 52 54
CTY:LA 20532ON102lo43E ~:GCO CL W
Approved For Release 2008/11/12 : CIA-RDP78BO3824A000200020062-5
PAGE 3 OF 4
1
ITMOO3
0
10 31 44 52 54
REQ: CTY:VN 183948N1053900E INT:FCV Sc B
URG: SLR: IFR: UTM:48QWF699623
STA: UCO
DES: APPROXIMATELY 400 METERS OF NEW ROADBED CONSTRUCTION IS
OBSERVED 1.3 NM SOUTH OF VINH. THIS NEW CONSTRUCTION EXTENDING
FROM UTM WF699623 TO WF699618 IS NOT ON AN EXISTING ROADBED;
HOWEVER, WHEN COMPLETED IT WILL CONNECT TWO SEGMENTS OF THE
PREVIOUSLY ABANDONED RAIL LINE RUNNING SOUTH FROM VINH. WITH
COMPLETION OF THIS NEW CONSTRUCTION AND WITH THE WORK BEING
DONE ON EXISTING RAIL SECTIONS, THE LINE SOUTH OF VINH WILL
POSSIBLY BE MADE SERVICEABLE.
MPR:AMS SERIES L7014, SHEET 6146-III
QUANG KHE COASTAL TRNSHP pT PPS
31 44 52 54
CTY:VN 174200N1062900E INT:FCS CL W
39
UTM:48Q575574
RMK:THE FACILITY CONSISTS OF FIFTY-TWO 25-METRIC TON (MT) PUG POL
TANKS WITH AN ESTIMATED CAPACITY OF 1,300 MT. RIGID METAL PIPE
HAS REPLACED THE FLEXIBLE HOSING WHICH WAS BEING USED IN THE
ORIGINAL STORAGE AREA. A SECOND POL PIER WHICH WAS UNDER
CONSTRUCTION ON 15 OCT 69 HAS BEEN COMPLETED AND IS OPERATIONAL.
AN ABOVEGROUND PIPELINE EXTENDS TO WITHIN A FEW FEET OF ROUTE 1A.
1
URG: SLR:
STA?OPR
MPR:AMS SERIES L7014, SHEET 6244-II
Approved For Release 2008/11/12 : CIA-RDP78BO3824A000200020062-5
Approved For Release 2008/11/12 : CIA-RDP78BO3824A000200020062-5
9
ITMO05; BYPASS LOOP UNDER CONSTRUCTION
16 31 44 52 54
REQ: CTY:LA 171635N1o6o941E INT:GCV CL w
1 27 39
URG: SIR: IFR: UTM:48QXE234103
STA: UCO
RMK:AN ADDITIONAL LOOP IS UNDER CONSTRUCTION ON THE PREVIOUSLY
REPORTED (REF B) ROUTE 912137 BYPASS NETWORK UNDER CONSTRUCTION.
THE NEW LOOP EXTENDS NW FROM THE BYPASS AT 17-16-35N 106-o9-41E
(UPM XE234103) FOLLOWING THE BASE OF THE KARST HILLS TO XE220129
WHERE IT TURNS EAST AND THEN SE AS FAR AS XE230123. THE
ADDITIONAL LOOP WILL EXPAND THE BYPASS NETWORK BY APPROXIMATELY
2.8 NM. MUCH OF THE PREVIOUSLY REPORTED BYPASS NETWORK IS NOW
SUPPORTING TRAFFIC.
MPR:AMS SERIES L7014, SHEET 6243-Iv
EOM
GP-1
S IC I N
Approved For Release 2008/11/12 : CIA-RDP78BO3824A000200020062-5