CABLE TO AIG 7840 FROM NPIC

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B03824A000200020062-5
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
5
Document Creation Date: 
December 28, 2016
Document Release Date: 
November 12, 2008
Sequence Number: 
62
Case Number: 
Publication Date: 
February 19, 1970
Content Type: 
CABLE
File: 
AttachmentSize
PDF icon CIA-RDP78B03824A000200020062-5.pdf159.79 KB
Body: 
Approved For Release 2008/11/12 CIA-RDP78BO3824A000200020062-5 ? (8 October 1969) CLASSIFIED .MESSAGE (-' ROUTING ORIG UNIT EXT DATE : , 9 21o TO AIG 781+0; NFOIO, FT MEADE, MD; INFO 1970 PRIORITY OP RATIONAL IMMEDIATE IUT69379 TO INFO SEE ABOVE 25X1 25X1 REPRODUCTION BY OTHER THAN THE ISSUING OFFICE IS PROHIBITED. Copy No. Signal Center Transmission Copy - DO NOT DETACH - Forward with Master GIANT SCALE (SEA)', (SEE #20B FOR N. KOREA) LB 19 18 52Z Approved For Release 2008/11/12 : CIA-RDP78BO3824A000200020062-5 Approved For Release 2008/11/12 : CIA-RDP78BO3824A000200020062-5 UNIT EXT DATE Feb 70 1 SEC R E T i .L-f 20 34 SECTION OF SECTIONS 1 14 25 32 43 SUPIR:CA SER: 000340 PRJ: GS MSN: S00224 DTZ: 700203H K PAGE 1 OF 4 DAY PHOTO. C CAMERA ON 04562, OFF o6452. CAMERA TYPES ARE A-HR308B MOD (TEOC) AND C-9085/64 (ooc). E::::::-] SER. KLoo16, DTG 050015Z FEB 70. REF (B) NPIC, SER. 000355, DTG 122112Z FEB 70. PACOM NVN CPFL, ICOD 29 DEC 69. THIS MESSAGE SUPPLEMENTS INFORMATION CONTAINED IN REFS. PART I. NONE PART II. SIGNIFICANT RESULTS am RELEASING OFFICER AUTHENTICATING OFFICER Approved For Release 2008/11/12 : CIA-RDP78BO3824A000200020062-5 Approved For Release 2008/11/12 : CIA-RDP78BO3824A000200020062-5 14 27 39 URG: SIR: : UTM: 48QTJ064122 STA: UCO DES:AN ADDITIONAL 12 NM OF INTERMITTENT ROAD IN EARLY STAGES OF CONSTRUCTION ARE OBSERVED EXTENDING NE ALONG THE WESTERN BANKS OF THE NAM PHAK (RIVER) FROM ITS PREVIOUS TERMINUS AT 20-52-18N 102-08-20E (UTM TJ0231o4) TO ITS PRESENT TERMINUS AT 21-01-OON 102-14-21E (TJ128263). CONSTRUCTION ACTIVITIES ON THE BRIDGE SPANNING THE NAM 'PHAK (RIVER) NEAR THE VILLAGE OF MUONG LA AT TJO11097 APPEAR TO BE NEARING A MID-STAGE. GFW:3 POSS TRUCKS MPR:AMS SERIES L7015, SHEETS 5450-IV AND 5451-III Approved For Release 2008/11/12 : CIA-RDP78BO3824A000200020062-5 URG: STA: UKN PAGE 2 OF 4 NEW POL PIPELINE SEGMENT 31 44 52 54 CTY:VN 183950N1053950E INT:FCV SC 27 39 IFR:Ulm: 48QwF'699638 DES:A NEW SEGMENT OF POL PIPELINE EXTENDS FROM UTM WF699638 TO WF7o1620. THE PIPELINE ORIGINATES AT THE VINH NW PIPELINE DEPOT AND EXTENDS SW APPROXIMATELY 1.9 NM. WHEN COMPLETED THE SEGMENT WILL PROBABLY CONNECT WITH THE LINE EXTENDING NORTH TOWARD VINE FROM THE MAIN NORTH-SOUTH LINE NEAR LANG LUYEN PPS. MPR:AMS SERIES L7014, SHEET 6146-III 1 ITMOO ROAD CONSTRUCTION (NEW) ROUTE 45 31 44 52 54 CTY:LA 20532ON102lo43E ~:GCO CL W Approved For Release 2008/11/12 : CIA-RDP78BO3824A000200020062-5 PAGE 3 OF 4 1 ITMOO3 0 10 31 44 52 54 REQ: CTY:VN 183948N1053900E INT:FCV Sc B URG: SLR: IFR: UTM:48QWF699623 STA: UCO DES: APPROXIMATELY 400 METERS OF NEW ROADBED CONSTRUCTION IS OBSERVED 1.3 NM SOUTH OF VINH. THIS NEW CONSTRUCTION EXTENDING FROM UTM WF699623 TO WF699618 IS NOT ON AN EXISTING ROADBED; HOWEVER, WHEN COMPLETED IT WILL CONNECT TWO SEGMENTS OF THE PREVIOUSLY ABANDONED RAIL LINE RUNNING SOUTH FROM VINH. WITH COMPLETION OF THIS NEW CONSTRUCTION AND WITH THE WORK BEING DONE ON EXISTING RAIL SECTIONS, THE LINE SOUTH OF VINH WILL POSSIBLY BE MADE SERVICEABLE. MPR:AMS SERIES L7014, SHEET 6146-III QUANG KHE COASTAL TRNSHP pT PPS 31 44 52 54 CTY:VN 174200N1062900E INT:FCS CL W 39 UTM:48Q575574 RMK:THE FACILITY CONSISTS OF FIFTY-TWO 25-METRIC TON (MT) PUG POL TANKS WITH AN ESTIMATED CAPACITY OF 1,300 MT. RIGID METAL PIPE HAS REPLACED THE FLEXIBLE HOSING WHICH WAS BEING USED IN THE ORIGINAL STORAGE AREA. A SECOND POL PIER WHICH WAS UNDER CONSTRUCTION ON 15 OCT 69 HAS BEEN COMPLETED AND IS OPERATIONAL. AN ABOVEGROUND PIPELINE EXTENDS TO WITHIN A FEW FEET OF ROUTE 1A. 1 URG: SLR: STA?OPR MPR:AMS SERIES L7014, SHEET 6244-II Approved For Release 2008/11/12 : CIA-RDP78BO3824A000200020062-5 Approved For Release 2008/11/12 : CIA-RDP78BO3824A000200020062-5 9 ITMO05; BYPASS LOOP UNDER CONSTRUCTION 16 31 44 52 54 REQ: CTY:LA 171635N1o6o941E INT:GCV CL w 1 27 39 URG: SIR: IFR: UTM:48QXE234103 STA: UCO RMK:AN ADDITIONAL LOOP IS UNDER CONSTRUCTION ON THE PREVIOUSLY REPORTED (REF B) ROUTE 912137 BYPASS NETWORK UNDER CONSTRUCTION. THE NEW LOOP EXTENDS NW FROM THE BYPASS AT 17-16-35N 106-o9-41E (UPM XE234103) FOLLOWING THE BASE OF THE KARST HILLS TO XE220129 WHERE IT TURNS EAST AND THEN SE AS FAR AS XE230123. THE ADDITIONAL LOOP WILL EXPAND THE BYPASS NETWORK BY APPROXIMATELY 2.8 NM. MUCH OF THE PREVIOUSLY REPORTED BYPASS NETWORK IS NOW SUPPORTING TRAFFIC. MPR:AMS SERIES L7014, SHEET 6243-Iv EOM GP-1 S IC I N Approved For Release 2008/11/12 : CIA-RDP78BO3824A000200020062-5