STATUS OF MIL SPEC 25524A FUEL

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP63-00313A000600100138-3
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
5
Document Creation Date: 
December 15, 2016
Document Release Date: 
August 27, 2003
Sequence Number: 
138
Case Number: 
Publication Date: 
May 1, 1962
Content Type: 
MFR
File: 
AttachmentSize
PDF icon CIA-RDP63-00313A000600100138-3.pdf307.85 KB
Body: 
Approved For Release 2003/0 2 =. -RDP63-00313A000600100138-3 is X18 THE RECORD Status of Nil Spec 28524A Fuel 25X1A 25X1A the frig arson 115 that the fuel sample (Socong) from Detachment ''R" failed to meet the epee for thermal stability. The "part indicated a pressure drop of ton Inches Eg in 120 minutes. Detachment ~B;. was notified of this 26 Anril, received a confirming report from 2,1 made final arrangements to airlift avu barrels o Ashland fuel from Wright Patterson A:FB to Detachment "B''. An analysis of this fuel at Wright Patterson lab indicated okay on thermal stability. Pressure drop was 1/10 inch Hg in 300 minutes (Sample number 62-F-103, Ashland, Batch 1, Lot 1). Your MATS flights were scheduled: AIR __ FLi+II` No l LTA 124 609 28/22009 3/1e00a 0-124 610* 0-97 611 28/11009 2/19309 97 612 98/14008 2/29309 25X1A c ad no information on Flight 610 Apparently it was grounded maintenance Be will follow up and advise later ' f 1 2 f e cue aauMp a re arre & GO in Farm 1 AS the same fuel (Socony) which in on board the previously 25X1A due to arrive at Detachment `'B?' on 23 April This 50.000 gallon shipment is now expected to arrive on 5 May. In view of the report in Pars 1, was 25X1A requested to take Immediate action to ship additional fuel by surface means to Detachment .YE' Be reported that Ashland had 546 barrels of fuel available and had been requested to ship it ABAP. I requested to advise us o f the 25X1A departure data and ETA when kn t . USAF review(s) completed '-RDP63-00313A000600100138-3 Approved d. Release 2003/0 9!D x Approved For Release 2003 fl lA-RDP63-00313A000600100138-3 IONA-0737 Page Two 25X1 A 4. lity Control Branch, *AAA, 25X1 A was informed hf of the corrected report received from t Rienzi* erg lab on the sample of Dowell fuel submitted for analysis by Detachment "G"` on 23 April. The corrected report indicated the fuel color was okay-color 2 instead of 4 which had been reported initially. The Wright Patterson lab had reported this fuel okay on 26 April-color 2 and pressure drop 1.73 inches in 300 a , because of the initial conflicting 25X1A reports rec+ Mended t fuel not be used. 25X 'A 2g Apr of the corrected Bichfisl repo on '747 Yl-wi 1 till 25X 'A recommended the fuel not be used became + pram s difficulties experienced with Rowell fuel. Al Raffy, VBAF POL Division, concurred although he approved using the fuel for training flights in view of the satisfactory lab reports. Only 7,,000 gallons is i volved. 25X1A sod by telecom to use or ZI ferry flights only. Deputy for Special Projects Materiel Staff, D 25X1A C I - ./GpD 2- AC/TWO 3 - A38T CH/tom 4 - 3PB/ PO 3 - 60/D PD 6 RI /DPD Approved For Release 2003/09/29 : ;fA-RDP63-00313A000600100138-3 I 25X1A Approved For Release 2003/09/2h I DP63-00313A000600100138-3 I1 A -0740 Copy of $ 25 April 1962 R REcoRD UBJE"f: Status of Nil Spec 23324A 1 1 1. a. Fuel, on hand as of It Apr ocony Oil Co. Howell oil Co. b. Fuel analyses were ma" of each fuel at three different laboratories: TRRRMAL STABILITY ROD COMM ocony owe ocony AF Petroleum and Chem Lab, Wright Patterson AID 1011-42#8 R/R R!R Petroleum and C2 lab, Everett, Washington lO"WIW* 1O"-222K* 0 0 Richfield Refinery* Long Beach, Calif. .13"-300 .20.1_300 0 4 *( der auspices AP Field petrol office, Maywood, Calif.) C. 7,000 gallons of now fuel was received on 23 April fros the Rowell Oil Company. A message was received by Detachment 0 from RAAMA receding that a thermal stability check be lade prior to using. A sample was Immediately sent to the Richfield Refinery at Long Illeach. The analysis was as folly: Thermal Stability 0.32" Color 4* *(Ibis fuel Is below spec for color) **(This fuel is below spec for thermal stability) Approved For Release 20Sf `: CIA-RDP63-00313A000600100138-3 RDP63-00313A000600100138-3 Approved For Release 2003/0 Off Patterson. It should arrive in Dayton at 1753* 24 April. No flying will be done until this sample is analyzed. An additional sample was shipped to the Al Lab at d. An additional 7.000 gallons was shipped to _ _ Patterson fuel lab prior to using. .- MAA called Detachment 0 on 24 April to 25k1A inform them that all additional fuel would be supplied from Ashland Oil Co. They recommended this fuel not be mixed with any ' other fuel. 2. Detachment H a. Fuel on hand an of 21 April was 7,1:45 gallons. This fuel was part of a shipment of 16,830 gallons from Socony Oil Co. which had been airlifted to them during the period 20-26 Bch. This replaced 38,017 gallons which was disposed of after it had been determined to be contam- inated. A 55 gallon drum of the now fuel was shipped to the Wright Patterson lab on 18 April. It arrived at Travis AFB on 23 April and should arrive at Wright Patterson by 2 April. A report is expected by 28 April. b. An additional 50,000 gallons of Socony fuel is enroute to Detachment g by ship. It should arrive on or amt A sample will be shipped to Wright Patterson or aura y-sis. This will be done before fuel to cleared for use. LAC, Burbank, California K. Approximately 7,000 gallons of Socony fuel E of 1g April. An analysis of this fuel by b In Los Angeles indicated the fuel was okay. the AF Field Petroleum Office- r yzrood, ttl3fornia. b. A second sample of this fuel was sent to the Patterson lab on 21 April. It arrived at 1000 23 April. A report was r ceI ed froatt !CI-5 at 1480, 24 April that the fuel failed to meet acs. Thermal stability was 101" in 272 minutes; rod color was 3. liver, it was approved f for use. Y Approved For Release 200 /0 :: CIA-RDP63-00313A000600100138-3 Detachment 0 from How 11 Oil Co. on April. This should 23 Approved For Release 20( RET CIA-RDP63-00313A000600100138-3 4C has been authorized to continue flying 4. SEA is arranging to resupply all activ Ashland Oil Co. and Shell Oil Co. as of SOP is being written in coordination with analyze every shient of fuel received by Los and to analyze fuel in storage anproziaately every sixty days.. 25X1:A Deputy for Serial Projects Materiel Staff, IWD /!WD Met** ME/DWG} 2 AC/. 3 MST CH/EPD 4 -^ Sns/ D 5 Sl/DwD Approved For Release 2003105 4 1A-RDP63-00313A000600100138-3