THE BYDGOSZCZ/JACHCICE THERMAL POWER PLANT
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP82-00046R000300080014-5
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
5
Document Creation Date:
December 27, 2016
Document Release Date:
June 3, 2013
Sequence Number:
14
Case Number:
Publication Date:
December 18, 1953
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 286.37 KB |
Body:
Declassified in Part- Sanitized Copy Approved for Release @ 50-Yr 2013/07/12 : CIA-RDP82-00046R000300080014-5
50X1
50X1
(1(ThTTTPT?NTTAT
REPORT NO.
50X1
50X1
COUNTRY
Poland
DATE DISTR. 18 Dec. 1953
SUBJECT
The Bydgoszoz/Jachoice Thermal Power Plant NO. OF PAGES 5
DATE OF INFORMATION
PLACE ACQUIRED
THIS IS UNEVALUATED INFORMATION
REFERENCES:
I. Woritifica/ion Data:
9a0ference to Encl. 1, Overlay of GSGS 4416, Sheet M-12, Bydgoszcz/
ahoice Thermal Power Plant and Points of Interest47
Pt, # 1, ydgoszoz/Jaohoice ThernV _power plant At 53-09, E 18-007.
# 2. 4trda River.
#3.
R racks: double track; European standard _gauge. Leading
outh 40 km. to Inowroclaw ZR 52-48, E te.igy and north
200 Ian. to Gdansk.
# 1, vt Tracks: four track, European standard gauge. Leading
viest 23 Ian. to Naklo 5 53-09, g 17-3g.
?0110 Liqout,
perence to Encl. 2, Memory Sketch of Bidgoszcz/Jpichcice Thermal
Ivor Plant7t7
Pt, # 1. Irda River.
# 2. Iridges: two brick RR bridgea over Brda 'liver.
# 3. Itft Tracks: ffefer to Pt, 4, Inca. g.
Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/12 : CIA-RDP82-00046R000300080014-5
Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/12: CIA-RDP82-00046R000300080014-5
# 4. RR Tracks:
CONFIDENTIAL
-2-
27Fefer to Pt. 3, Encl, 27.
50X1
# 5. Buildin : wood, 15 x 8 x 5 m., with tar paper covered gable
roof, This building was used by a kayak club.
# 6. Canal: concrete, two meters wide. This canal was used for
the disposal of water used for the cooling of power plant
50X1 condensers. / there was another canal,
(exact location unknown) located underground and it supplied
installation with water from the Brda River.
50X1
# 7. Dirt Road: five meters wide.
#8.
Fence: woods 25 m. high, surrounding entire installation.
unable to accurately locate area enclosed by
emcee
# 9. Building: brick, 15 x 8 x 15 m,
building to be the transformer eta on.
# 10. guard Shack: brick, 5 x 3 x 24 m., with tar paper covered
gable roof. One armed installation guard was posted at
shack.
this 50%0
# 11. Main Thermal Power Plant Buildin : concrete, 55 x 25 x 20 m.
The alpk a e on s e o show exact location and
position of equipment in building. There were exactly
seven boilers in building lettered A to G; these boilers
were actually marked in this manner. Boilers A to F inolu-
sive were German Babcock Wilcox type. The pressure in
kg.'s of steam per square centimeter or atmospheres for
these boilers was about 25 and temperature 3000 C. Boiler
G was a German Steinmuler type and its pressure in kg.'s
of stem per square centimeter was about 32 and temperature
of 320' C. I, J and K were turbines; turbines I and J were
supplied steam by boilers A to F inclusive. Turbine K was
supplied steam by boiler G. Turbine K and boiler G were
installed by the Germans during World War II by the A.E.G.
(Allgemeine :kicz-izitsGesellechaft) firm. The M section
.of building was the pumping room. The ground floor of
north section of building contained the chemical softening
of water; other floors of this section were believed to be
switching and relay rooms.
# 12.Building: attached to building ost. 11, abovi7, contained
administrative offices.
50X1
# 13. ldin concrete, 20 x 15 x 20 m This building was
ittache to building 27t. 11, above and its construction
was corn leted in the spring of 1953.
a new boiler (Babcock Wilcox type) was peIng
nst?edin this building and its actual lettering was
going to be H. The product/v*185s of this boiler was going
to be 50 tn, per hour and its pressure in kg.'s of steam
per square centimeter or atm2spheres was to be about 40
and temperature of about 355v C. The letter L in building
ff.t. 11, abov27 was reserved for a turbine which was to be
purchased from Sweden (Stal type); this turbine was to be
mf.00.16:1 i2r.b7.,7' boiler H and its power was to be 10 mega-
watts. The installing of this new boiler and turbine was
expected to be completed by the end of 1954.
# 14. New Construction: a new chimney was to be built at this
ireirrn-7731=H and turbine L. It was to be of iron, its
exact height 40 m.; and completed by the end of 1954.
CONFIDENTIAL
Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/12 : CIA-RDP82-00046R000?AnnnRnn14_c
Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/12 : CIA-RDP82-00046R000300080014-5
#
#
15.
16.
CONFIDENTIAL
-3-
Warehouse: wood, 20 x 15 x 4 mi, with tar paper
50X1
covered
H.
covered
building
The firm
gable roof. Warehouse stored parts for new boiler
Building: wood, 20 x 10 x 4 m., with tar paper
gable roof. This building was used as an office
for the firm which was installing new boiler.
name unknown belonged to the Bureau of Construction of
Power Plants.
#
17.
Conveyor Belt Motor and Belt: power of motor was
15 kilo-
watts. The conveyor belt was 120 m. long and one
meter
wide. This conveyor belt served as a reserve way of trans-
porting coal from box cars on tracks 27t. 21, belog to
coal pile bins 27t. 18, beice.
50X1
#
18.
Coal Bins: three concrete bins. The south bin
was under
was to con-
construction It
tain coal for new boiler H and turbine L.
#
19,
Coal Distributing Conveyor: a circular conveyor
with scoop
shovel which transported coal from coal bins into
orb. 11* above.
building
#
20.
Crane: traveling crane with steam shovel tyge scoop used
nrUnloading box oars of coal from tracks 475t, 21, belce.
#
21.
RR Tracks: three tracks* European standard gauge. These
TWES"gire used for transporting coal into installation.
III. Additional Information:
50X1
trol energy reglons.
northern,
50:00
.(Koszalin and Olsztyn
o an s
They are the central* westerns southern and
the northern region
-i-t-contained the Gdansk* Bydgoszcz*
provinces. No further information. 50X1
ENCLOSURES:
1. Pinpoint Location of Sydgoszcz/Jachoice Thermal Power Plant
2. Memory Sketch of Bydgoszcz/Jachoice Thermal Power Plant
CONFIDENTIAL
Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/12 : CIA-RDP82-00046R000300080014-5
Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/12 : CIA-RDP82-00046R000300080014-5
50X1
CONFIDENTIAL
-4-
ENCLOSURE 1:
Pinpoint Location of Bydgoszcz/Jachcice Thermal Power Plant
rip
CONFIDENTIAL
Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/12 : CIA-RDP82-00046R000300080014-5
Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/12 : CIA-RDP82-00046R000300080014-5
CONFIDENTIAL
. -5-
ENCLUURE 2:
Memory Sketch of Bydgoszcz/Jachcice Thermal Power Plant