THE BYDGOSZCZ/JACHCICE THERMAL POWER PLANT

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00046R000300080014-5
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
5
Document Creation Date: 
December 27, 2016
Document Release Date: 
June 3, 2013
Sequence Number: 
14
Case Number: 
Publication Date: 
December 18, 1953
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00046R000300080014-5.pdf286.37 KB
Body: 
Declassified in Part- Sanitized Copy Approved for Release @ 50-Yr 2013/07/12 : CIA-RDP82-00046R000300080014-5 50X1 50X1 (1(ThTTTPT?NTTAT REPORT NO. 50X1 50X1 COUNTRY Poland DATE DISTR. 18 Dec. 1953 SUBJECT The Bydgoszoz/Jachoice Thermal Power Plant NO. OF PAGES 5 DATE OF INFORMATION PLACE ACQUIRED THIS IS UNEVALUATED INFORMATION REFERENCES: I. Woritifica/ion Data: 9a0ference to Encl. 1, Overlay of GSGS 4416, Sheet M-12, Bydgoszcz/ ahoice Thermal Power Plant and Points of Interest47 Pt, # 1, ydgoszoz/Jaohoice ThernV _power plant At 53-09, E 18-007. # 2. 4trda River. #3. R racks: double track; European standard _gauge. Leading outh 40 km. to Inowroclaw ZR 52-48, E te.igy and north 200 Ian. to Gdansk. # 1, vt Tracks: four track, European standard gauge. Leading viest 23 Ian. to Naklo 5 53-09, g 17-3g. ?0110 Liqout, perence to Encl. 2, Memory Sketch of Bidgoszcz/Jpichcice Thermal Ivor Plant7t7 Pt, # 1. Irda River. # 2. Iridges: two brick RR bridgea over Brda 'liver. # 3. Itft Tracks: ffefer to Pt, 4, Inca. g. Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/12 : CIA-RDP82-00046R000300080014-5 Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/12: CIA-RDP82-00046R000300080014-5 # 4. RR Tracks: CONFIDENTIAL -2- 27Fefer to Pt. 3, Encl, 27. 50X1 # 5. Buildin : wood, 15 x 8 x 5 m., with tar paper covered gable roof, This building was used by a kayak club. # 6. Canal: concrete, two meters wide. This canal was used for the disposal of water used for the cooling of power plant 50X1 condensers. / there was another canal, (exact location unknown) located underground and it supplied installation with water from the Brda River. 50X1 # 7. Dirt Road: five meters wide. #8. Fence: woods 25 m. high, surrounding entire installation. unable to accurately locate area enclosed by emcee # 9. Building: brick, 15 x 8 x 15 m, building to be the transformer eta on. # 10. guard Shack: brick, 5 x 3 x 24 m., with tar paper covered gable roof. One armed installation guard was posted at shack. this 50%0 # 11. Main Thermal Power Plant Buildin : concrete, 55 x 25 x 20 m. The alpk a e on s e o show exact location and position of equipment in building. There were exactly seven boilers in building lettered A to G; these boilers were actually marked in this manner. Boilers A to F inolu- sive were German Babcock Wilcox type. The pressure in kg.'s of steam per square centimeter or atmospheres for these boilers was about 25 and temperature 3000 C. Boiler G was a German Steinmuler type and its pressure in kg.'s of stem per square centimeter was about 32 and temperature of 320' C. I, J and K were turbines; turbines I and J were supplied steam by boilers A to F inclusive. Turbine K was supplied steam by boiler G. Turbine K and boiler G were installed by the Germans during World War II by the A.E.G. (Allgemeine :kicz-izitsGesellechaft) firm. The M section .of building was the pumping room. The ground floor of north section of building contained the chemical softening of water; other floors of this section were believed to be switching and relay rooms. # 12.Building: attached to building ost. 11, abovi7, contained administrative offices. 50X1 # 13. ldin concrete, 20 x 15 x 20 m This building was ittache to building 27t. 11, above and its construction was corn leted in the spring of 1953. a new boiler (Babcock Wilcox type) was peIng nst?edin this building and its actual lettering was going to be H. The product/v*185s of this boiler was going to be 50 tn, per hour and its pressure in kg.'s of steam per square centimeter or atm2spheres was to be about 40 and temperature of about 355v C. The letter L in building ff.t. 11, abov27 was reserved for a turbine which was to be purchased from Sweden (Stal type); this turbine was to be mf.00.16:1 i2r.b7.,7' boiler H and its power was to be 10 mega- watts. The installing of this new boiler and turbine was expected to be completed by the end of 1954. # 14. New Construction: a new chimney was to be built at this ireirrn-7731=H and turbine L. It was to be of iron, its exact height 40 m.; and completed by the end of 1954. CONFIDENTIAL Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/12 : CIA-RDP82-00046R000?AnnnRnn14_c Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/12 : CIA-RDP82-00046R000300080014-5 # # 15. 16. CONFIDENTIAL -3- Warehouse: wood, 20 x 15 x 4 mi, with tar paper 50X1 covered H. covered building The firm gable roof. Warehouse stored parts for new boiler Building: wood, 20 x 10 x 4 m., with tar paper gable roof. This building was used as an office for the firm which was installing new boiler. name unknown belonged to the Bureau of Construction of Power Plants. # 17. Conveyor Belt Motor and Belt: power of motor was 15 kilo- watts. The conveyor belt was 120 m. long and one meter wide. This conveyor belt served as a reserve way of trans- porting coal from box cars on tracks 27t. 21, belog to coal pile bins 27t. 18, beice. 50X1 # 18. Coal Bins: three concrete bins. The south bin was under was to con- construction It tain coal for new boiler H and turbine L. # 19, Coal Distributing Conveyor: a circular conveyor with scoop shovel which transported coal from coal bins into orb. 11* above. building # 20. Crane: traveling crane with steam shovel tyge scoop used nrUnloading box oars of coal from tracks 475t, 21, belce. # 21. RR Tracks: three tracks* European standard gauge. These TWES"gire used for transporting coal into installation. III. Additional Information: 50X1 trol energy reglons. northern, 50:00 .(Koszalin and Olsztyn o an s They are the central* westerns southern and the northern region -i-t-contained the Gdansk* Bydgoszcz* provinces. No further information. 50X1 ENCLOSURES: 1. Pinpoint Location of Sydgoszcz/Jachoice Thermal Power Plant 2. Memory Sketch of Bydgoszcz/Jachoice Thermal Power Plant CONFIDENTIAL Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/12 : CIA-RDP82-00046R000300080014-5 Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/12 : CIA-RDP82-00046R000300080014-5 50X1 CONFIDENTIAL -4- ENCLOSURE 1: Pinpoint Location of Bydgoszcz/Jachcice Thermal Power Plant rip CONFIDENTIAL Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/12 : CIA-RDP82-00046R000300080014-5 Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/12 : CIA-RDP82-00046R000300080014-5 CONFIDENTIAL . -5- ENCLUURE 2: Memory Sketch of Bydgoszcz/Jachcice Thermal Power Plant 50X1 CONFIDENTIAL Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/12 : CIA-RDP82-00046R000300080014-5