Approved Flwwtor
CIA 0
Rim
CLASSIFICATION
mia
TOPIC
(1T :TF -SA j"fi'41 -111to -J4 j '! 7+ia r li i n r.
25
DATE OBTAINED._.
REFERENCES_
25X1
PAGES 2 _ ENCLOSURES (NO. & TYPE)
1 REIVARKS_...r,.,.,....... -
-REPORT NO._
25X
25X1
---------------
DATE PREPAREp..._..;>.n._r,:g:_ 1g40
General Construction
a,. There was a single-track, standard-gauge line from VRPOLJE
to SA SAC 6 It was extended via DOBOJ and ZENICA to SARAJEVO
(see Annex 1), to a to::al length o:{: 260 km partly utilizing
the roadbed of the pre,viouc narrow gauge line between DOBOJ and
SARAJEVO, which was rerouted when necessary. Narrow-;gauge
trains, however, operate only on the SLAV.BROD - DOBOJ and
ZENICA -- SARAJEv10 see-ions. It ic, not knowrn whether the DOBOJ
- ZENICA section has been dismantled.
b. The new standard-gauge linc WAS built by youth brigades,
and was designated Railroad Li'ne'..Of the Youth". Its construe -
tion was much publicized and pushed hard (fronn April 127 to
I over ber 1947). its safety was not up to requirements because
the foundations were not properly laid, causing constant land-
slides. Frequent repairs of, the subgrade were necessary.
c. Roadbed: Lmbankmen't when recuired by terrain conditions.,
made' a th and stones rammed try hand on top of a 30 to 40cm
layer of gravel.
d. lisoode ties, part:.y creosote.
e. T}ILails from 8 to 2< meters loc -, partly new, stamped "Zenica
1,;4r
f. Ballast: River gravel.
A; .new standard.Rauge ItR statimt. was built in SARAJEVO (SARAJEVO
NOVO) at a distance of about 55k) m from the narrow-gauge rail-
road station.
This document is hereby re rad
CONFIDENTIAL in accordance with the
biter of 16 October 1978 from the
Director of Central IntelIigenoe to, the
Archivist of the United M81%
%AWP
Next R grBXped 008
25X1
25X1
Approved F 2003/08/11 :CIA-RDP82-004578003800 20003-8
CONFIDE NiIAC
2. ..rifornation was obtained on t1 o follow.inC. constructions
a. SAi?IAC railroad Arid -e across the Save liver (sec-, Ai--4ex 2)
Len.Tth: about 6aU meters.
1"+ooden ?pitrs, with two co&ete Giers in the ...idCle section.
Steel Superstructure.
River clearance: about 15 :peters.
b. _.. :Lt J railroad brldr a across Bosna River (1 k:a NNW of
:AA OI,A s ?e knnox 3
length: about 80 xieters
3 concrete piers; concrete abut.nnnts.
Superstructure : concrete and steel.
4 a;)ars, 20 :aetors each.
Clearance over .,:;round: about 3.0 meters.
0. Z PJ.C ;;t? i lroad brill` -e acroa s I. osna River (2 i;t11 N of dfl';C) :
:.?en;;th: about 30 n, eter. s.
concrete piers.
Concrete abutments.
-m) e vs true ture: :,riddle section, steel (16 .r.etors ); sidesec-
tiono, concrete.
d' . ZE;.: iC;k- rt:i~ roar I~rid: ~e across Loans River (600 nieters 1:
of ?.~i..=(25 see ~~nr.e~< ~':
Len,, x about 125 meters.
8 concrete piers.'
Concrete abutments.
5 concrete spans, 1F.11= ;netere each, arm One 4 i-rioter, steel
structure span.
hivE,r clearance: about 3 'qoters.
G. ZLNIC-A railroac brldtre across 3osna River (~ ;j za?ters of
ZEN i:CII (see +r,nex 5)-**.__._ -
Len;th:. about 15U .Petera.
:3 concrete piers.
Concrete a.bUtr:lentS.
7 concrete spans, 1CC.(; :;cote s each, am one 40,-weter, steel
structure span.
River clearaznce : about 5 i-aetars.
2. KAA AI`:J railroad br3.{. ~,e across :sosna River:
Len th: about 60 iaeters
3 concrete piers.
Superstructure: straight concrete girder structure.
:'time 3.s
South of :11 G`I,AJ, 30 laeters.
About li I:m north of ;;L ,.LCA, 250 weters.
V.1SOAO, arched and concrete-linen; len,:tb: 120 motors; hei -,ht:
4 meters; width: 3.5 meters.
5 Annexes : I it I'.e w Construction I' ive ion SA.. ~1CwSA .r:JL C;
RR J3rid re across the ,>ava hive., near Si AC
ELI. brlc?o across t ',,e 1~osna Live- near 1A aLAJ
Nil Brid,,;e aeroms the i.o)sna liver near LEXICA
R E t Lrid tie across the Loam Rlvcr netur* LISxici ..
QQNFIDENTI
25X1
Approved For Release 2003/08/11 : CIA-RDP82-00457R003800120003-8
Approved For Release 2003/08/11 : CIA-RDP82-00457R003800120003-8
5X1
CONFIDENTIAT
25X1
A 'R New Construction
Division SAMAC - SARAJEVO
Legend:
I-- _ Standard Gauge -Single Track
- ? Narrow Gauge 76cm
Approved For Releas ,A3g>3P11182-00457R003800120003-8
25X1
25X1
ApproveC
I COMIM
Annex 2
25X1
PR Bridge across the Sava River near SAMAC
70M
25X1
Approved For Relea 82-00457R003800120003-8
25X
Approyed For ReI a /08/11: CIA-RDP82-00457R003800120003-8
E6NFIDENTIAZ
Annex 3
25X1
RR Bridge across the Bosna River near AlAGLA47
Not to Scale.
25X1
Approved For ReWase 2 ,_ _ E00457
X1
Approved leffi-RD
7711W -1
25X1
PR Bridge across the Bosna River near ZEN/CA
Not to Scale
25X1
Approved For Release! 4 ! ,DE i llfr~l2-00457R003800120003-8
25X1
RR Bridge across the Bosna River near ZENICA
Not to Scale
25X1