MAJOR ELECTRIC POWER PLANTS LIAONING PROVINCE, CHINA

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP79T00909A000900010044-9
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
15
Document Creation Date: 
December 28, 2016
Document Release Date: 
October 6, 2008
Sequence Number: 
44
Case Number: 
Publication Date: 
February 1, 1971
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP79T00909A000900010044-9.pdf1.09 MB
Body: 
Approved For Release 2008/10/06: CIA-RDP79T00909A000900010044-9 Top Secret DIRECTORATE OF INTELLIGENCE Industrial Facilities (Non-Military) Basic Imagery Interpretation Report Major Electric Power Plants Liaoning Province, China Top Secret DATE COPY PAGES Approved For Release 2008/10/06: CIA-RDP79T00909A000900010044-9 Approved For Release 2008/10/06: CIA-RDP79T00909A000900010044-9 Approved For Release 2008/10/06: CIA-RDP79T00909A000900010044-9 Approved For Release 2008/10/06: CIA-RDP79T00909A000900010044-9 TOP SECRET RUFF RCS - 13/0018/71 CENTRAL INTELLIGENCE AGENCY Directorate of Intelligence Imagery Analysis Service This report, based on late 1969 and 1970 imagery, updates the previous basic reporting on 12 of the major electric power plants in Liaoning Province, north- eastern China. The cut-off date for information'is November 1970. Changes were observed at only three of the plants. The Shen-yang Thermal Power Plant Northeast was being converted to a heat processing plant. The boilerhouse and generator hall roofs were modified and two of the three stacks were dismantled between January 1969 and April 1970. At the Kai-yuan Thermal Power Plant Ching-ho, the roofs of the boilerhouse and generator hall were re- moved between November 1968 and December 1969. At the third plant, Lu-ta Thermal Power Plant No. I Amanogawa, the smoke stacks were removed between September and November 1970. On the latest coverage, eight of the plants were operating and one plant was probably operating. TOP. SECRET RUFF 25X1 25X1 Approved For Release 2008/10/06: CIA-RDP79T00909A000900010044-9 Approved For Release 2008/10/06: CIA-RDP79T00909A000900010044-9 TOP SECRET RUFF -2- TOP SECRET RUFF Approved For Release 2008/10/06: CIA-RDP79T00909A000900010044-9 Approved For Release 2008/10/06: CIA-RDP79T00909A000900010044-9 TOP SECRET RUFF This report updates previous basic reporting on the following 12 major electric power plants in Liaoning Province (see Figure I). 1. An-shan Heat and Thermal Power Plant Steel Plant 2. Chin-chou Thermal Power Plant Synthetic Fuels Plant 3. Fou-hsin Thermal Power Plant 4. Fu-shun Heat and Thermal Power Plant Liao-ning 5. Fu-shun Thermal Power Plant Shale Oil Plant No. 2 6. Fu-shun Thermal Power Plant Tai-kan-ton 7. Huan-jen Hydro Power Plant Hun-chiang 8. Kai-yuan Thermal Power Plant Ching-ho 9. Lu-ta (Dairen) Thermal Power Plant No. I Amanogawa 10. Lu-ta Heat and Thermal Power Plant No. 2 Kan-ching-tzu II. Shen-yang Thermal Power Plant Northeast (converted to a heat processing plant) 12. Shen-yang Thermal Power Plant Tieh-hsi Requirement COMIREX N01 Support Number 421951 CIA. RCS-13/0027/70, Major Electric Power Plants Liaoning Province China, February 1970,1 I(TOP SECRET RUFF) -3- TOP SECRET RUFF Approved For Release 2008/10/06: CIA-RDP79T00909A000900010044-9 Approved For Release 2008/10/06: CIA-RDP79T00909A000900010044-9 TOP SECRET RUFF UTM COORDINATES GEOGRAPHIC COORDINATES 51TVF987529 41-07-55N 122-59-05E 15th RTS. USATC, Series 200, Sheet M0289-20HL, 3rd ed, Sep 66, Scale 1:200,000 No changes have been observed at the An-shan Heat and Thermal Power Plant Steel Plant since November 1968, the date of the latest photography used in the previous report. The plant was operating when observed in March 1970. Vapor was observed emanating from three of the eight cooling towers. -4- TOP SECRET RUFF Approved For Release 2008/10/06: CIA-RDP79T00909A000900010044-9 25X1 25X1 25X1 25X1 Approved For Release 2008/10/06: CIA-RDP79T00909A000900010044-9 Iq Next 1 Page(s) In Document Denied Approved For Release 2008/10/06: CIA-RDP79T00909A000900010044-9 Approved For Release 2008/10/06: CIA-RDP79T00909A000900010044-9 TOP SECRET RUFF UTM COORDINATES 51TWG910415 GEOGRAPHIC COORDINATES 41-55-IIN 124-05-32E 6th RTS. USATC, Series 200, Sheet M0290-IIHL, 4th ed, Jan 66, Scale 1:200,000 No changes have been observed at the Fu-shun Heat and Thermal Power Plant Liao-ning since November 1968, the date of the latest photography used in the previous report. The plant was operating in March 1970. Heavy smoke was observed emanating from all three of the stacks. TOP SECRET RUFF Approved For Release 2008/10/06: CIA-RDP79T00909A000900010044-9 Approved For Release 2008/10/06: CIA-RDP79T00909A000900010044-9 TOP SECRET RUFF Fu-shun Thermal Power Plant Shale Oil Plant No. UTM COORDINATES GEOGRAPHIC COORDINATES 51TWG874315 41-49-45N 124-02-55E MAP REFERENCE 67th RTS. USATC Series 200. Sheet M0290-IIHL. 4th ed. Jan 66, Scale 1:200,000 LATEST IMAGERY USED I NEGATION DATE (If required) No changes have been observed at the Fu-shun Thermal Power Plant Shale Oil Plant No. 2 since November 1968, the date of the latest photography used in the previous report. The plant was operating in December 1969. Smoke was observed emanating from the stack and vapor from one of the two cooling towers. -8- TOP SECRET RUFF Approved For Release 2008/10/06: CIA-RDP79T00909A000900010044-9 25X1 1 25X1 II 25X1 25X Approved For Release 2008/10/06: CIA-RDP79T00909A000900010044-9 TOP SECRET RUFF Fu-shun Thermal Power Pla USATC, Series 200, Sheet M0290-IIHL, 4th ed, Jan 66 Scale 1:200,000 (SECRET I ATEST IMAGERY USED r=r.~~~na-nu-rc rr~r~irc No changes have been observed at the Fu-shun Thermal Power Plant Tai-kan-ton since April 1969, the date of the latest photography used in the previous report. The plant was operating in March 1970. Smoke was observed emanating from two of the four stacks and vapor from ten of the 13 cooling towers. -9- TOP SECRET RUFF Approved For Release 2008/10/06: CIA-RDP79T00909A000900010044-9 25X1 I Approved For Release 2008/10/06: CIA-RDP79T00909A000900010044-9 TOP SECRET RUFF Huan-jen Hydro Power Plant Hun-chiang GEOGRAPHIC COORDINATES 41-17-OON 125-23-53E USNOO. USATC, Series 200_ Sheet M0290-17H1_ 4th PH Anr 6R craIP 1-?nn nnn 51TYFO22710 MAP REFERENCE (SECRET No changes have been observed at the Huan-jen Hydro Power Plant Hun-chiang since May 1969, the date of the latest photography used in the previous report. The plant appeared to be in operation in December 1969. Water turbulence was observed in the tailrace. TOP SECRET RUFF Approved For Release 2008/10/06: CIA-RDP79T00909A000900010044-9 25X1 Approved For Release 2008/10/06: CIA-RDP79T00909A000900010044-9 TOP SECRET RUFF FIGURE 2. KAI-YUAN THERMAL POWER PLANT CH!NG-HO, CHINA - II - TOP SECRET RUFF Approved For Release 2008/10/06: CIA-RDP79T00909A000900010044-9 Approved For Release 2008/10/06: CIA-RDP79T00909A000900010044-9 TOP SECRET RUFF Kai-yuan Thermal Power Plant Chin -h UTM COORDINATES GEOGRAPHIC COORDINATES USNOO. USATC,.Series 200, Sheet M0290-6HL 4th ed Feb 68 Scale 1:200,000 (SECRET The roofs of the boilerhouse and generator hall have been removed at the Kai-yuan Thermal Power Plant Ching-ho since November 1968, the date of the latest photography used in the previous report. Photography of December 1969 revealed that the roofs had been removed. They had not been replaced as of March 1970 (see Figure 2). The plant was never completed and has never been observed operating. 25X1 25X1 L 25X1 TOP SECRET RUFF Approved For Release 2008/10/06: CIA-RDP79T00909A000900010044-9 Approved For Release 2008/10/06: CIA-RDP79T00909A000900010044-9 Next 4 Page(s) In Document Denied Iq Approved For Release 2008/10/06: CIA-RDP79T00909A000900010044-9 Approved For Release 2008/10/06: CIA-RDP79T00909A000900010044-9 Top Secret Top Secret Approved For Release 2008/10/06: CIA-RDP79T00909A000900010044-9