BASIC IMAGERY INTERPRETATION REPORT PYONGYANG RAILROAD LOCOMOTIVE MANUFACTURING AND ROLLING STOCK REPAIR PLANT PYONGYANG, NORTH KOREA

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP79T00909A001100030001-1
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
12
Document Creation Date: 
December 28, 2016
Document Release Date: 
May 13, 2008
Sequence Number: 
1
Case Number: 
Publication Date: 
June 1, 1971
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP79T00909A001100030001-1.pdf450.53 KB
Body: 
Approved For Release 2008/05/13: CIA-RDP79T00909A001100030001-1 DIRECTORATE OF INTELLIGENCE Industrial Facilities (Non-Military) Basic Imagery IzatevPretation Report Pyongyang Railroad Locomotive Manufacturing and Rolling Stock Repair Plant Pyongyang, North Korea Top Secret R(,S 13/0047/71 COPY 117 PAG FS 9 Approved For Release 2008/05/13: CIA-RDP79T00909A001100030001-1 Approved For Release 2008/05/13: CIA-RDP79TOO909AO01 100030001 -1 Approved For Release 2008/05/13: CIA-RDP79TOO909AO01 100030001 -1 Approved For Release 2008/05/13: CIA-RDP79TOO909AO01 100030001 -1 TOP SECRET CENTRAL INTELLIGENCE AGENCY Directorate of Intelligence Imagery Analysis Service Pyongyang Railroad Locomotive Manufacturing and Rolling Stock Repair Plant UTM COORDINATES 51SYD350252 GEOGRAPHIC COORDINATES 39-02-45N 125-43-25E 25X1 1 25X1 MAP REFERENCE USNOO. USATC, Series 200, Sheet M0~80-7HI 4th Pd ~i... rR 1-20n 00n ECR ET Pyongyang Railroad Locomotive Manufacturing and Rolling Stock Repair Plant produces and probably repairs electric locomotives and passenger cars. The plant probably produces most of the parts needed for these operations. Electric locomotives and passenger cars have been identified on photography in the production area of the plant. We have not been able to determine the production rate of locomotives or passenger cars from photography. The plant contains two final assembly buildings, a final assembly building with a subassembly section, two final checkout buildings, two probable foundries, a forge shop, a probable fabrication complex, two rail transversers, and numerous storage, support and administration facilities. In December 1962, the date of the earliest photography used in this report, the plant was complete. Since that time only a few minor support buildings have been added. An unidentified building was under construction when the plant was last seen in March 1971. The plant has been active on all photographic coverage from December 1962 to March 1971. This report includes a photograph of the plant, describes the facilities, discusses operational functions and production activity, and lists the type and number of rolling stack observed in the production area. TOP SECRET Approved For Release 2008/05/13: CIA-RDP79TOO909AO01 100030001 -1 RCS - 13/0047/7 Approved For Release 2008/05/13: CIA-RDP79TOO909AO01 100030001 -1 TOP SECRET 124 ----- ------- -- ---- 1 26 128 130 T UN - H 1' A Sangar O Reservoir TU-MiN HUNT UN -NI t v6 I OHL YU HO RYONS pT p V' Y 1C ! M-AN `mi A,IN n 01 . 42 42 ANC o lN0N6 IN NANAM0 I.Y 1 .i AN O KANGGY KOI,IUOK O ..GUN -NI C 11.4 CH nt. TOAN OI IN GGU O-AKCHU KOIN-N. O T:!.`I CHON 1 \LL CHl NI IIN K .HI-NG O N O R f N K O E A 40 . Ho-H' 4o KU:ONG gang 1T ' K I'A`u1. {A.1 C,0 ,INGo ] ? S HUN V NV-rI SEA ' V Y( NU,IIING L v ? .SIN>Y V U NC!?I INC KQINONO GUI O n f PYONGYANG ILROA D LOCOMOTIVE JA PA N A1.1HI,NC: MANUFACTURING ND ROLLING UIU GY ANr ] STOCK REP PLANT o" 9Q^v N ? ?'U~? r] uNI L' . . F FS-HI O OJ O GIMNIK(AFFUN L.1* CHI,A-HI CIIA, HYOY i.O S'v UNGGAIG ~ OCHANI?UN 0 ` c0 38 ' 38 S \ O / IING ro 11 N C UN o t d ~ ~ QJV? ~ SOi rH KOREA ? i YELLOW SEA Ir l Io-I rip}yUra O INL`N G d'o b e~?.. O !~ ?'~ ~ :.11 (1N o ? 0 NPIC. [SASE i I N B24 126 1 28 1 30 TOP SECRET Approved For Release 2008/05/13: CIA-RDP79TOO909AO01 100030001 -1 Approved For Release 2008/05/13: CIA-RDP79TOO909AO01 100030001 -1 TOP SECRET Pyongyang Railroad Locomotive Manufacturing and Rolling Stock Fep,3ir Plant is located in the northeast section of Pyongyang (see Figure 1). It 25X1 25X1 is adjacent to Pyongyang Railroad Classification YARDs Sopyangyana 25X1 and 6 nautical miles west-northwest of Pyongyang Airfield E, 25X1 Another rolling stock repair facility which is located 1,000 feet wewtof the plant may be associated, but it is outside the plant perimeeter. According to a US Defense Department report, the Japanese built a locomotive repair facility at this site before the end of World War II. 1/ It was reportedly damaged during the Korean War and the present plant was built between 1055 and 1957. Physical Features The Pyongyang Railroad Locomotive and Rolling Stock Repair Pll-mnl is enclosed within a walled area approximately 3,000 by 1,000 feet and about 73 acres. It is road and rail served (see Figure 2). The main production facilities are two final assembly buildings, one final assembly building with a subassembly section, two final checkout buildings, two probable foundries, a forge shop, a probable wheel and axle shop, and a fabrication complex containing four unidentified buildings and a prolucts storage yard. Other facilities in the plant include a paint shop, a probable steam plant, a probable producer gas plant, ten workshops, two probable work- shops, and several other storage and support buildings. The plant also has three crane-served material storage yards and two rail transversers. In December 1962, the date of the earliest photography used in this report, the plant was complete. Only a few minor support buildings have been added since that time. Construction of an unidentified building (Item 18) started between April and November 1970 and it was in an early stage of construction when the plant was last seen in March 1971. TOP SECRET 25X1 25X1 Approved For Release 2008/05/13: CIA-RDP79TOO909AO01 100030001 -1 Approved For Release 2008/05/13: CIA-RDP79TOO909AO01 100030001 -1 TOP SFCRFT Operational Functions This plant produces and probably repairs electric locomotives and passenger cars. Most of the parts needed for these operations are probably produced in the plant since it has a forge shop, a probable foundry, a probable fabrication complex, and several workshops. There are separate final assembly buildings and final checkout buildings for the locomotives (Item 23 and 24, Figure 2) and the passenger cars (Item 12 and 19). The facilities believed to be primarily involved in repair of locomotives and passenger cars are one of the final assembly buildinns (Item 21), the probable wheel and axle shop (Item 10), and the paint shop (Item 3). The two rail transversers are for moving heavy parts, subassemblies, or partially completed equipment from one building to another or from one bay to another in the same building. Production Activity This plant has been active on all photonraphic coverage from December 1962 through March 1971. It has not been possible to determine the production rate of either locomotives or passenger cars from photography. Poor-quality coverage precluded an accurate count of the rolling stock present before February 1968. Since that time the coverage has not been frequenf enough to determine whether the rolling stock was newly manufactured or repaired. Table 1 lists the number of locomotives and passenger cars observed in the production area of the plant on coverages from February 1968 to March 1971. It does not include the rolling stock seen in the holding yard or on the service tracks in the southern section of the plant. A variety of cars have been observed in that section, usually numbering 80 to 100, which were probably used to deliver raw materials. TOP SECRET 25X1 25X1 25X1 Approved For Release 2008/05/13: CIA-RDP79TOO909AO01 100030001 -1 TOP SECRET Table 1. Locomotives and Railroad Cars Observed in the Production Area of the Pyongyang Plant Type Date and Number Observed 25X1 25X1 Electric Locomo- tives Passenger Cars Possible Approved For Release 2008/05/13: CIA-RDP79TOO909AO01 100030001 -1 rvP ~rcRti Approved For Release 2008/05/13: CIA-RDP79TOO909AO01 100030001 -1 Approved For Release 2008/05/13: CIA-RDP79TOO909AO01 100030001 -1 TOP SECRET Table 2. Facilities at Pyongyang Railroad Locomotive Manufacturing and Rolling Stock Repair Plant (Keyed to Figure 2) Total Dimensions Floorspace Item Description (Ft) (Sa. Ft) Description Total Dimensions Floorspace (Ft) (Sq. Ft) 1 Storage Building 175 x 45 7,875 2 Workshop 120 x 40 4,800 3 Paint Shop 330 x 50 16,500 4 Storage Building 80 x 30 2,400 5 Probable Workshop 130 x 40 5,200 6 Probable Steam Plant 7 Probable Producer Gas Plant - 8 Workshop 160 x 50 8,000 9 Crane-Served Materials Yard 10 Probable Wheel and 100 x 45 4,500 Axle Shop 11 Probable Foundry 255 x 175 44,625 12 Final Checkout Building 90 x 55 4,950 13 Support Building 130 x 130 16,900 14 Probable Workshop 160 x 40 6,400 15 Workshop 170 x 70 11,900 16 Workshop 115 x 40 4,600 17 Probable Auditorium 140 x 105 14,700 18 Unidentified Building Under Construction 19 Final Assembly Building 280 x 50 14,000 270 x 185 49,950 21 Final Assembly Building 295 x 295 87,025 22 Forge Shop 275 x 105 28,875 23 Final Checkout Building 200 x 145 29,000 Probably for Passenger Cars For Completed Railroad Cars Railroad Car Assembly Probably Engine and Car Repair For Completed Locomotives TOP SECRET 24 Final Assembly Building 500 x 230 115,000 with Subassembly Section 25 Probable Fabrication Complex a Unidentified Building 195 x 70 13,650 b Crane-Served Open Storage Yard c U/I Building 65 x 30 1,950 d U/I Building 210 x 45 9,450 e U/I Building 70 x 45 3,150 f Crane-Served Materials Yard Support Building 150 x 50 15,000 27 Administration Building 28 Support Building 29 Administration Building 30 Workshop 31 Workshop 32 Workshop 33 Probable Foundry 34 Workshop 35 Workshop 36 Crane-Served Raw Materials Yard 37 Support Buiding 38 Workshop 150 x 50 15,000 80 x 30 4,800 100 x 55 16,500 150 x 30 4,500 230 x 40 18,400 115 x 40 9,200 115 x 40 9,200 160 x 40 6,400 Irregular 4,600 255 x 105 26,775 340 x 100 34,000 120 x 40 4,800 115 x 25 2,875 120 x 35 4,200 100 x 50 5,000 55 x 45 2,475 Remarks Locomotive Assembly 2 Story, U-Shaped 3 Story 2 Story 25X1 25X1 Approved For Release 2008/05/13: CIA-RDP79TOO909AO01 100030001 -1 Approved For Release 2008/05/13: CIA-RDP79TOO909AO01 100030001 -1 TOP SECRET FIGURE 2. PYONGYANG RAILROAD LOCOMOTIVE MANUFACTURING AND ROLLING STOCK REPAIR PLANT TOP SECRET Approved For Release 2008/05/13: CIA-RDP79TOO909AO01 100030001 -1 25X1 22bA1 25X1 25X1 25X1 25X1 Approved For Release 2008/05/13: CIA-RDP79TOO909AO01 100030001 -1 Approved For Release 2008/05/13: CIA-RDP79TOO909AO01 100030001 -1 Approved For Release 2008/05/13: CIA-RDP79TOO909AO01 100030001 -1 Map TOP SECRET USNOO. US Air Target Chart, Series 200, Sheet ~10380-711L 4th edition, Nov 68 Scale 1:200,000 (SECRET Pyongyang Electric Locomotive Factory, Requirement COMIREX N02 Support Number 429227 TOP SECRET Approved For Release 2008/05/13: CIA-RDP79TOO909AO01 100030001 -1 25X1 25X1 25X1 25X1 25X1 25X1 Approved For Release 2008/05/13: CIA-RDP79TOO909AO01 100030001 -1 Top Secret Top Secret Approved For Release 2008/05/13: CIA-RDP79TOO909AO01 100030001 -1