CABLE TO OPCEN FROM NPIC
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP67B00329R000100210002-9
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
2
Document Creation Date:
December 23, 2016
Document Release Date:
December 9, 2013
Sequence Number:
2
Case Number:
Publication Date:
December 9, 1963
Content Type:
CABLE
File:
Attachment | Size |
---|---|
![]() | 124.16 KB |
Body:
? '1E6 irs- M. CpC1:1'
rerlocr.cr-nr.cahrt ',Mt. tf,V,Pa
Declassified in Part - Sanitized Copy Approved for Release 2013/12/09: CIA-RDP67B00329R000100210002-9
WI TOP SECREr
"Th 2123 Z 09 DEC 63 RUFF
TO OPCEN
FROM NP IC
ACTION:
min OSA/TCO 1-12
TOR: 22001 09 DEC 63
TO
TOPSECRET RUMNTHIS IS A
MSG/ HANDLE if TALENT
KEYHOLE CONTROL SYSTEM* RELEASABLE FROM SSO CHANNELS* SSOS PASS
TO APPROPRIATE TCOS* CITE NP I C 1558* THE. FOLLOW/NG IS FROM THE
NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER.
1. RECENT ANALYSIS OF BAYKONUR AREA FIELD LAUNCH POINT, 47-13N
INDICATES THAT THE 50X1
65-18 E ON MISSION
50X1
( SOUTHERNMOST OF THE TWO FIELD LAUNCH POINTS ( FLP) CONTAINS IN
ADDITION TO FOUR VEHICLE REVETMENTS, FOUR VEHICLES POSITIONED
SIDE BY SIDE AND ONE POSSIBLE TRAILER PARKED NEAR A POSSIBLE
TOWER OR ERECTOR* NO VEHICLES WERE VISIBLE IN THE REVETMENTS*
NO MISSILE IDENTIFIED* THE ACT IVITY COULD INDICATE A TRAINING OR
PRACTICE FIRING EXERCISE* AREA AGAIN SEEN ON
AND NO
50X1
ACTIVITY VISIBLE AT EITHER FLP, HOWEVER, CONSTRUCT
ION OF AN
UNIDENTIFIED NATURE WAS VISIBLE THREE NAUT NAL MILES NORTHEAST
OF SUPPORT AREA*
50X1
2* RECENT ANALYSIS OF MISSION
INDICATES THAT A RANGE
50X1
ION SITE UNDER CONSTRUCTION LOCATED 30 NM SOUTH
iaCitja 1
Extlaind.tton a0anarac?
iitevoninviE440 and
dxfastaficatton
BY OTHER THAN THE ISSUING OFFICE IS PROHIBITED. Copy No.
Declassified in Part - Sanitized Copy Approved for Release 2013/12/09: CIA-RDP67B00329R000100210002-9
50X1
Declassified in Part - Sanitized Copy Approved for Release 2013/12/09: CIA-RDP67B00329R000100210002-9
.11/ IIIP
TOP SECRET RUFF
WIC (INs 53563) 1558 PAGE TWO
OF DEHEIKAZGAN AT 47-22N 67-25E IS POSSIBLE SART? SHAGAN ANTI?
MISSILE TEST CENTER INSTRUMENTATION SITE NUMBER 15,, THE SITE 50X1
WAS FIRST REPORTED AS RANGE TYPE INSTRUMENTATION FROM MISSION
SITE AS OBSERVED ON MISSION CONSISTS OF INTERFEROMETER 50X1
WITH 1800 FOOT CROSS ARMS9 SUPPORT AREA OF 19 BUILDINGS9 AND A
4000 BY 220 FOOT GRADED EARTH LANDING STRIP ORIENTATED NORTHEAST
?
SOUTHWEST. POSSIBLE ASSOCIATION WITH SARY SHAGAN ATC DUE TO CON?
FIGURATION OF INTERFEROMETER. CONFIGURATION SIMILAR TO SSATC
SITES AND DISSIMILAR TO TYURATAM MTC SITES.
END OF MSG
TOP SECRET RUFF
50X1
Declassified in Part - Sanitized Copy Approved for Release 2013/12/09: CIA-RDP67B00329R000100210002-9