AUTOBAHN BRIDGES IN EAST GERMANY, PART III
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80T00246A026801150001-7
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
15
Document Creation Date:
December 27, 2016
Document Release Date:
April 15, 2014
Sequence Number:
1
Case Number:
Publication Date:
September 25, 1958
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 1.14 MB |
Body:
Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7
CLASSIFICATION sECRET
50X1-HUM
CENTRAL INTELLIGENCE AGENCY
'FORMATION REPORT
COUNTRY East Germany
SUBJECT Autobahn Bridges in East Germany
PLACE
ACQUIRED
DATE OF
INFO
TM% EZ,WEIEUE COOTAINZ VirORISATIOP hrrzeTima tHATIONAL DEPZUEE
OF viz Anarru VRIES WIIHMI 10: nfArlaial OP 7HE E5P1021/GE ACT SO 44
0. St AHD .5Z.AS ALIEHDEIL FIR 5SOt ORHE REV7LATIOU
IYO CO.17EU1$ U AY VASIIIEll TO PM onitUT/10a1ZED vtRson is PRO, ,s?
HICITE0 CV LAW REpHOOliCTiOt4 OF ThC FOVAI FS PROHIMEN
REPORT
CD NO.
DATE DISTR.25 September 1958
NO.OF PAGES
NO. OF ENCLS.
SUPPLEMENT TO
REPORT NO.
15
50X1-HUM
50X1-HUM
50X1-HUM
Tb n following list contains technical data on Au obahn bridges and
viaducts in East Germany.
Lt..P.TE
ARMY 1,47,
' NAVY
CLASSIFICATION SWAM
DiS RIBUTION
NSRB
1. nit
50X1-HUM
50X1-HUM
50X1-HUN
Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7
Priclgo on across
Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7
15EC,1?11
Total Span in
Length Meters
in Meter2
- Chenni+*: Eigierhoh Autobahn 1
(Autobahn L, AB)
Radebeul 253,59
railroad
station
AB .Dresdon-
Chem?nitz
km 3
south-north
direction:
1 centinuous
steel girder
over 4 spans:
29.88+m3,96+
29344-29,,34;
2nd Continuous
steel girder
over 5 spans:
25954-!)995-4-
25,)954-95.95+
)027;north-
south direction
reverse
AB Dresden-
Elbe
378+
. . .
north-south
Chemnitz.
Rivee
30
diroction:
km 6
and high.-
way No 6
?
510+73,01- ?
130,04-73A4r,
51c,0373
tzuss girders
on 6 supports
through 5 spans,
continuing to
the southa steel
concrete struc-
ture over Dres-
dreim-Mnissen high-
TFay Nc... 6; 30m
long with hingtle,
support.o e.alpa:,!ato
rowayF: on tcp
Bridge-
Piles
north. south ?
direction:
1 pile solid
coated, 3
hinged steel
supports, 1
pile carrying
the connection
of ths 2 brid-
ges, 3 hinged
supports
2
Abutment Width
..11C0crw
RoadrJay
,2 abutments 2 roadways concrete
:solid, quarry 7,5m
atone coated
Carrying Conotrut-
Capacity iGn
in Tomo
60 and
30
'i93%
948-
partly
repaired
-.1ondition 'Xote .
ia,
1?M6
-
luite
? ylood
50X1-HUM
iFeS r..c=oc??,=0.4.7...tftesrac ,..reav,. tr., ? Inwax.=F.,?.e-m,..r.zssa.c.troavalp.
A ..P11013
oclid, quarry
atone coated
2 abutments
solid, quarry
stone coated
2-roadways conerete?
7,5m, center
strip not
narro*pdt ?
footwalk
attached.
to upstream
side of the
bridge. ?
6EG::ET/
60 and
80
19359
repairea
in 1952
Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7
-ery
50X1-HUM
Bride on across
Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7
Total. 'Span in
Length Meters
in Meters
11.-0 :Oresdan_
Chemnitz
km 11,9
AB Dresden
-
Chemnitz ,
km 20
=?,..-er.,.-...-essunesear+aac-Itetcota
Saubach
near
Wiledruff and
1st-class
Meissen-
Tharandt
road
290 north-south
incl. direction;
abut- 5 arohes, 5m
ments in span each,
vertical
clearancQ
Hirsch- 156,6
feldtal
(valley)
near
ponutschen-
bora
42m
north-south
direction;
28,5+33e25+.
33,:-254-33,25+,
28,5=156.75;
2 parallel
girder bridges
on 6 52- and atone coated
37-steel supports
2 main girders
for each bridge
Bridge-
Piles
4 puce,
concrete
- 3 -
Abutment
Width Roadway
Carrying. Construct
-
Capacity ion Year
in Tone
4 piles each
separated for
both bridge
parts, connec-
ted by arches,
concrete, ciin-pilea
ker and quarry
2 abutMonts,
steel con-
crete, not
coated
2 abutments,
solid, con-
structionimilar to
that of the
1 roadway concrete 80
no 2nd
rcadwayl
total
width
llm
2 roadways conorets
.total
Width 24m,
center etrip
not narrowed
80 -
1945
blown up,
1954
reoon-
structed
1935
AB Dresden- Mulde
Chemnitz River
km 27?5 near
Sieben-
lehn
402,90 north-south
direction;
56+61,2+7104+
81,6+71,4+
6%2=402,93
1 bridge for
two roadwayso
continuous
steel girder
on 7 supports',
roadways on top
5 nilea9
concrete
coated
2 abutments, 2 roadways
solid coated.7.5m, total
in southern width 24m,
abutment bridge not
tunnel for .
pedestrians,
60 to 90m?
long
steel
concrete
roadway
slab,
narrowed, 55 cm
center part thick
between the
roadways
passable
SEC ,IF.311
60 and
80
1935
Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7
?? ?
50X1-HUN
Condition- Note:- ?
in
1956
l'iest of
all bridges
goGd
r.U.KrEse, --res.msrosz,Vm,?
g oo d
62...211.1sescaamaccom221F
50X1-HUM
Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7
? BrIdgz on
across
Tntal.
Length
in. Meters
Span in
'Meters
Bridge.
Piles.
Abutment
Construct.
ion. Year
Width
Roadway
Carrying
Capacity
in Tone-
AB Dresden-
Tal der
120
north- south
1 pile,
2 abutments,
2 roadways
concrete
60 and
1936
ZheMnitt
Grossen
direction
ashlar
solid coated,. 705m, total
roadway
80
km 4n
StriAg4m
(valley)
50470-120
continuous
steel girder
on 3 supports,
separate bridge
for each road-
masonry,
interrupted
in the
center
wing walls
about 30m
long
width 24m,
. bridge not
narrowed?
on hump
plates
AB Dresden-. Tal der
Chemnitz
km'42
AB Dresden.
Chemnitz
km 43.8
Kleinon
Striegic
311?10
mcome.averomvarosegamlicevensmishmowv??????*6
Vranken
-
berg -
Rosswein
road
........wmomm,swormw.m....1.3smagorpermatummlmemownommaromim
16.5. .
AB Dresden. ' aitzelbach 100
Chemnitz at Vranken-
km 536 berg and -
1st-class
Frankenberg-
,Tlittweida
road
way, 4 main
girders
multiple-arch
bridge, 10
arnhes with a
vertical clear.
ance of about
25m each, only
western road-
way
steel concrete
slab on 2 sup-
ports, vertical
clearance 12m
9 piles
solid,
concrete
with
quarry stone
coating
30+40+30.100; 2 pilee,. solid
continuous steel quarry ratonW
girder on 4 sup-. coated, for
ports, 2 separate each road.
bridges, 2 main, way separate'
girders each
2 abutments
solid, re-
maining from
former brid
wing walls
about 20m
long
2 solid
abutments,
concrete,'
wing walls
about ?10m
long
2 solid ,
abutments,
concrete,
coated
SveRv`l?
1 roadway
715m, no
eastern
road-
way
concrete
0,
2 roadways concrete 80 .
7.5m, road?
-
way not narr-
owed, total
width 24m
2rrOAUvrays
75m not
not
total width
24m
concrete.
on hump
plates
60 and
30
Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7
1954
1954
1936v
repaired
in 1953/54
,
Condition, Note
in
1956
poor
in
the
-the abut-
ment on
the Chem-
nits aide
a 4-cm wid
gap
very goqa?
very
? good
Pay ,P1
geed
50X1-HUM
50X1-HUM
Bridge on across
Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7
0.15,UAN
Total
Length
in Meters
Span in
Meters-
Bridge-
Piles
Abutment
Width
Roadway
?-..:0-1,sreormi.l.rstnnver.a. .-gavmm??..a
Chemritz-
Rieoa rail-
road sect-
ion via
Dobeln
AB Dresden-28
Chemnitz
km 57
2x1A.28mt
continuous
steel concrete
girder, separa-
tely constructed
for each track,
only in the
center an
interstice
????ronterAttrrresitona?sbraamsszarnat1520,174?L
1 pile solid
concrete
quarry stone
coated.
?
2 solid
concrete
abutments,
quarry stone
coated
double
-
track
bridge
Carrying Construct
Capacity ion Year
in Tons
solid?
floor
heavy.
freight
train
of the
Reichs.r
bahn
1936
.VIAlsezeroff?acttiroratiC7.1,71.4
AS Dresden- Chemnitz-- -64 144-18,084-1464; .3 piles
Chemnitz bach continuous steel ooncrete,
km 610 girder on 5 aup- quarry stone
ports, 4 spans; coated
2 parallel
bridges .
AT?Dresden Chemnitz- 224
Chemnit7 tal
km 63?0
ChemnitzLoipzig
railroad
line via
BurgstgAt
side-v:1-
ley of the
Chemnitz
valley and
AS Dresden-
Chemni.c;z
about
390
7x32.224;
37- and 526
steel structure;
plate girder
bridge, con-
tinuous girder
on 8 supports
multiple-arch
bridgepabout
20 arches, semi-
circles on high
piles015-m spans,
quarry .Eofle
2 abutments; 2 roadways
solid, con- 7,5m,.
crets quarry separated,
stone coated center not
narrowed ,
410114..l.
7 piles
solid, quarry
stone coated
steel
concrete
roadway
slab
50X1 -HUM
? Cond'3tion Nvte
in
1956
good
80 1935 . rather ?
blown 11.7;) good,
in 1946 , built
provision- with
al bridge, , used
new con- material
ntri,mtinn
in 1953
2 abutmenta, _2 roadways steel
solid, con- 7,-,5m; center concrete
?rote, quarry strip pass- roadway
stone coated able slab
,.sz,....mtvocresur?-??apmelmaa?sm?s.
60 and 1935
90
about 19 piles 2 solid
solid, quarry abutments, ?
stone coated quarry stone
coated
double- solid
track floor
bridge
heavy about
freight 1900
train
of the
Reiohs-
bah:a
Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7
fairly
good
fairly
good
+.4.4.1?11,
50X1 -HUM
Bridge on
Declassified in Part - Sanitized Copy Approved
across Total Span in Bridge-
Length- Meters Piles
in Meters
AB Preeden 28 2x14km28; 1 pile,
Chemnitz continuous concrete
km 67Q9 steel concrete
beam
for Release 2014/04/15: CIA-RDP80T00246A026801150001-7
Carrying Construct -
Capacity ion Year
in Tons
. 60 and 1936
80
- 6
Abutment
2 solid
abutments,
concrete
Width
9 m
roadway
plus
2x2m
sidewalks
- Roadway
small
cobblestone
pavement
in concrete
Chemnitz,,
Leipzig
highway
TO 95
MItuttarSIETZLZ.Z9==ar-
ist-class
-Rabenstein-
Grtna
road
AB Chemnitz-50
Fisenach
km 72
-vravaroworem
a?
30; arch bridge,
flat arch,
coated steel
-?concrete
2 _solid
abutments,
quarry atone
coated
.6 m small 24 (6o 1936
roadway-cobblestow' .t._nd pavement in in ibly 80)
plus 2 -
elevated . concrete
protective
embankments
_
AB Chemnitz- Mulds 150
Eisenach River
km 05 near
alauchau
5x30150; - 4 Pilzzg
continuous - concrete, ?
steel_ girder solid ?
on, 6 supports
Tm.fcl?..
abutments
steel con-
crete
2 roed.ways steel con- 60 and 1937
crete road- BO
separated slab
-rreNepecw=9....
AB Chemnitz"- Franken-491
Eisenach haussn
km 90 valley
east-west 17 piles,
directiont concrete&
224-9x2703+' without
3x2904-4x coating
28,5+224914
continuous steal
2 abutments
solid, steel
concrete, ?
each about
12m long,
not coated
-=,....M3.==.1=2.5412==a7NUMOVistautrAeamin-...
2 roadways steel con- 60 ana 1_937.
7?5m, pen- ,orete road- BO
ter strip way slab
passable. ?
concrete struct,=
ure on 19 supports
.-13-.C2r.=+$1,004.,391....`9,..11}1K,..922.2100.701Rett,
Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7
50X1 -HUM
Conditin Note
In
1956
getd
4
tEf.rly
go cd
nede-
neu ()oat
.of paint
good
50X1 -HUM
Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7
Bridge on, across Total Span in
Length Meters
in Meters
AB Chemnitz- Weisse
Eisenach Eleter
km 100 River
about about 5 20-m
100 spans, contin-
uous steel
girders
4,21-
AB Chemnitz- Gera-
Eisenach Zeitz
km 100 highway
No 2 and
Gera-
Zeitz
railzoad
line
about about 2 15-m
30 spans contin-
uoua steel
girders
2nd-olase
Vistritz-
T8ppeln
road
? '
-AB Chem-7.-
nitz -
Eisenach ?
km 101
about
_c0
arch bridgeo?
1 archl
50 m
AB,Chemnito- AB Berlin- 48
Eisenach NUrnberg
km 110 (Hermodor-
fer Kreuz)
Terl ?
continuous ,
steel girders
on 5 supports
4x12 m
Bridge
Piles
GilET4
Carrying
-.Capacity
in Tons
Cqnstruct
ion Year
Condition
in
1956
50X1-HUM
_7 7
Ptcutmvrt aidth
Roadway
4 piles
concrete
solid -
?
- 2 abutments 2 roadways
solid steel .75m9 (len-
concrete ter. strip
.passable
steel 60 and .
concrete 80
roadway
slab
1937
good
good
-
the
biruwo
1 pile
solid
concrete
,
2 abutments ? 2 roadways
_ olid steel , 7..5m,. Oen-
. concrete ter strip
)assable - ?
steel_ 60 and
concrete 80.
roadway -
slab
1937
Cter_a
lie
closely
behfund
each
otheT
.....c-a---rmarznantearearansn,
2 abutments 6 m
solid roadway
..-.1,-112srecteeetro....?fertit
small 24
cobblestone
paven.ert
in concrete
1937
good.
3 rows
hinged
stel
supports
?
2 abutments 2.roadwa3rs
solidpcon- . To5T
orete, coated 2x6-m wide
tuvn-off
1Phc:s4
total
Aracamattusr.assor??wvezzo.n.c.r2waram-raneres--,-...m.
concrete 60 and
roadway 80
slab-
1937
goq4,
Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7
G-???,....-mitassemzporenot...
50X1-HUM
Bridge on across -
Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7
Total Span in
Length - Meters
in Meters
AB Chemnitz- Teufels- 270
Eisenach tal
km 112 (valley)
AB Chemnitz- viaduct
Eisenach across
km 116 the
Zeits-
grund
Bridge.-
-Piles
steel concrete
arch bridge,
1 arch with
138m vertical
clearance, road-
way on spandrel
columns4 con-
crete, not coated
6EC-in
AO piles,
20 spandrel
columns, -
2 separate
parallel
bridges
250 5x50; 4 piles
continuous solid, con
-
steel girders orete, con
on 6 supports . tinuous for
through 5 spans, both road
-
2 separate
bridges with
2 main girders
each, welded
construction
ways, in the.
center great
arch aper-
tUre
Abutment
Carrying
Width
Roadway.
Capacity
in Tons
2 small
? 2 roadways
steel
60 and
abutments
751119 :sus-
concrete
80
solid
pended cen-
roadway
concrete
ter strip,
passable,
width be ?
tween rail
ings 218m
slab
.....zsp.mtratatz.vxmCSF-txt
2 a:Aid
abutments
.2 roadways steel .
7,5m, sus- coonorete
pended con- roadway, -
.ter strip,. slab
passable,
width be-
tween rai-
lings21,8m
AB Chemnitz- valley
Eisenach near
joi 118, PodeL.
(so.oalled at
Podelsatz
Vladukt)
250
9 27,m spans,
continuous
Steel concrete
bridge on 10
. supports
for each
roadway .
8 separate
-piles, con-
crete, solid
2 small
abutments,
solid,
concrete,
not
Heeparated
CRVIC61179=1.61traelT
60 and
Co
Construct.
ion Year
1938
1938
smse.......creamerfe.??
. 2 roadways stsok .
7.5m, sus- concrete
pended cen roadway
ter strip- slab
passable,
width be-
tween rai.,
lings 21,8m
bEG.q01)
60 and 1938
80
Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7
Condit -
in
1956
good
good.
Note-
50X1 -HUM
50X1 -HUM
good.
limaraes324-.Inanrawarr
.112171-615.1Antacbeatigsaom.
tm.X1102...a3atarRs.
50X1-HUM
Bridge on across
AB Chemnitz-
Eisenach
before
jena-west
entry
Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7
Total Span in
Length -Meters
in Meters
Saaletal 700
across;
I rivulet,
Seale Ri-
ver, rail-
road lines
Gera-Wei-
mar and
Jena-Saal-
feld and
Jena-Saal-
feld high-
way No 88
1st-class
Nennsdorf-
ZitMritz
road,
so-call d
P-5 sr
arcah bridge.
arch bridge,
17 arches,
quarry stone
coated
Si6C.d.ET
Bridge
Piles
.16 piles,
.conorete,
rock coated
- 9
Abutment
2 big-.
eolid?
coated
abutments
twair=0..znfttexeszCpsmea..1W.reSSAVOILac.a4,..sp,S1,42.1)Smaisem..tecaacur-.2,-*.asaeac62:ts*"...,
AB Chem. 100
nitz incl,
Eisenach abut-
km 6 after merits'
Jana-west
entry
AB Chemnitz- Erfurt-
. aArnetadt
highway
a.No 4
Eisenach
Erfurt-
w6ot.
entry
2 fixed
arches with
38m spans,
roadway
on spandrel
oplumns
steel concrete
28 steel girders
incl. on 2 supports.,
abut-. 12,5m spans ?
manta each.
Width Roadway- -
egae?.
2 roadways? concrete
705m9 roadway
total width slab
18,8m,
center
strip
pass b
1 center pile, 2 small
actually only abutments
foundation
and support
for the two
flat arches
6m
roadway
sidewalks
on both
sides
.6.160.21.?02.01,43.114?1?1?20.
4,04
Carrying
Capacity
in Tons
60 and
80
-Conctruot Condition Note
ion Year in
1956
19389 very
2 arches good
blown up,
reconstruc.
ted in
1953/54
email 60
cobblestone
pavement.
2 abutments 2 roadways steel
_ quarry stone 7,5m, Auto. concrete
coated bahn profile, road-,
no narrow-
ing
way
slab
1938
..........Mers?olareaters-as, ?
60 and 1938
.80
SECAEL
Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7
good
-good
50X1 -HUM
Bridge on across
AB Chemnitz- Ilm lear
Eisenach, MOnin-
at Mollin- gen
Rep entry
Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7
Total Span in
Length Meters
in Meters
300
incl.
abut-
mento
5 arches with
42m vertical
clearance each,.
clinker masonry,
the rest of
quarry stone
coated concrete
.SECUEZ
Bridge-
Piles
4 intermediate
piles
ip
Abutment
2 big
abutments
with about
27-m long
wings
Width
2 roadways
7?5m, to-
tal width
between
railsings
2005m
Roadway
steel
concrete
roadway
Carrying Construct
-
Capacity ion Year
in Tons
80
CondAtion Note
in
. 1956
19380
blown up
in 1945
arch,g
reoonstructe-::
in 1953-54
,.....yrassIvatampaugmars.
ist-clas AB Chem- 70.
Trfur.t!- nitz- incl.
Tannrcla Eisenach adjoin.'
road Erfurt-. Ing
north arches
entry
-WammftleimalW luMW
? AP Chemnitz- Geratal
Eisenach ?
AB Chemnitz Tal der
Eisenach Apflc
bore Gotha Stadt
entry
1 quarry stone
arch with 33m
spanitopped by
14 spandrel
arches which
carry the
rondways
no piles,
arches
merge
directly
into the
foundat-
ions
100 3 arches with 2 piles
16-m spans concrete,
concrete, quarry quarry
stone coated stone
coated
108 5 arches with
22m vertical
clearance each,
quarry stone
coated concrete
2 piles,
concrete,
with quarry
stone
2 very
small
abutments,
terminat-
ing the
spandrel
arch row
roadway
6 mg
sidewalks
small 60 and
cobblestone 80
pavement
in concrete
nyamooszaecelccosems?saryra3?Unras...22.1.1o.ar.
2 abutments 2 roadways concrete
solid, con- 7.5m, Auto- roadway
orete9 coated bahn profile,
no narrowing
-
2 abutments, 2 roadways. concrete
solid, 'con- 705m, Auto- roadway
orate, coated bahn profile,
no narrowing
SEC:ET)
60 and
80
60 and
80
1938
Se*
very
good
50X1-HUM
SX.V0/..ezterereroarrereas
1938
1938
A,Tygissa air.Ja.raticsoweanss6sale
Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7
-,92.0104,11aSt
good
good
good
"Ta7.19ririto
laTeMiesser.
50X1-HUM
Bridpe on
across
Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7
Total:
Length
in Meters
AB Chemnitz-
'Eisenach
7 km after
Gotha
entry
fforeel,
Ist-olass
Gotha-
7alters-
hausen
road and
narrow-
gauge
railroad
line
76050
with-
out
abut-
ments
SECii12,
11 -
Span in
Bridge
Abutment .? Width
Roadway
Meters
Piles
24+28.5+24;
2 piles5
2 abutments, 1 roadway
steel
5 main girders
concrete
old, concrete R7051/1,
coated: l for provision-
concrete
roadway
each roadway
shifted by
8m, perpen-
dicular to
the road
axis
al bridge
dm, north,
roadway
new
Carrying Construct
-
Capacity on Year
in Tons
Condition Note
in
1956
50X1 -HUM
new north,I9385
roadway blown up
805 south.
roadway ?
15
1945,
provision-
al. bridge
in 19479
northern.
roadway
reoonstructed
in 1954
northern
roadway
good,
southern
roadway
poor
AB Chemnitz 7 Langen-
isenach, ? '
Eisenach- Eisenach
east highway
entry No 84'
12,
with
abut-
ments
22m
steel girders
on 2 supports,
12m span, 5
main girders
AB Chemnitz- '!ferra
EAsenach River
1.0 8 arches with
15-m spans,
semicircular
arches, con-
crete, quarry
stone coated
7 piles,
concrete,
quarry stone
coated
2 abutments, 1 roadway
old., concrete., 70.5m
quarry stone
coated
2 big
abutments,
solid, con-
crete, coated
planned
steel
concrete
roadway
80
1938p
blown up
in 19450
northern
roadway
reconstructed
northern
roadway
good
to have
2 roadways
7.5m
not
completed,
construct-
ions stoppee,.
in 1939
27,0ne
border
4
SECIETe
Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7
50X1-HUM
Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7
Bridge on across Total Span in
Length Meters
in Meters
?Bridge-
Piles
4arin
- 12
Abutment
Width
Roadway . Carrying Construct- Condition Note ?
Capacity ion Year in
in Tons 1056
Chemnitz - Hof Autobahn
_ _
AB Chemnitz- Chemnitz- 16 steel struot-
Hof Zwickau ure as girder
-
4 km after Highway on 2 supports
Chemnitz No 173
50X1 -HUM
2 solid ?2 separate steel 60 and - 19369 aatiefactoryg
abutments, roadways concrete 80 blown up, built with
quarry 'Min roadway in 1952 . Used material
stone coat- slab recon
-
ed cone,- structed
orte -
AB Chemnitz- Zwickauer 700 valley bridge, about . 2 solid
Hof Mulde, R8- steel structure, 9 or 11 .pile-s abutments,
km 38 delbach, continuous concrete, coated
double-? girder, about coated conore
track 10 or 12 spans
Zwickau-
Aue rail-
road line,
Zwickau-
Schneeberg
highway
NP 93
AB Chemnitz- Zscho- 120 valley bridge, 4 piles ?.
Hof chener steel structure, concrete
?km 27 ? Tal continuous coated
girder through
5 spans
2 solid
:abutments,
concrete
coated
roadways Ste.
concrete
roadway
slab
2 roadways
7,5m
steel
concrete
readWay
-slab
60 and
80
1937. -good
1937
g'3.110.10r,
Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7
good
-.VIONIMM4111011?
50X1-HUM
Bridge on across
Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7
Total Span in
Length Meters
in Meters.
Bridge
Piles
SECZT,
- 13
Abutment
AB Chemnitz- Obltzsch
not' Tal
km 56?7
379 arch bridge
5 arches with
50m vertical
clearance each,
quarry stone
and concrete
4z5.6-m
high piles
merging into
arches,
quarry stone
and concrete
2 great
abutments,.
40m long
each, con-.
crete with
quarry stone
coating
AB Chemnitz- Triebtal 373
Hof
km 7205
AB Frie-
of tal
arch bridge, 5 piles
6 arches with merging into
37m vertical arches, con
-
clearance each, orete and
concrete, quarry quarry stone
stone coated
200 ' arch bridge,- ?
7 arches with
lqm vertical
cleartne each,
concrete and
quarry stone
/15.1ff ATTOC,F,Slief
'6 piles'
merging -
into arches,_
concrete and
TAarry stone
abutment
on Chem-
nitz side .
about 30m
long, on
Hof eido
extended
as parking
place, 60m
long, con-
crete- with
quarrz store
'Carrying Construct-.
Capacity ion Year
in Tons.
50X1-HUM
- Condition Note
In
1956
Width
Roadway
2 roadways concrete
7,,5mg.cen-
80 1938
bridge
good .
ter strip
capacity
omitted,
of no
total width
19m
importance
with such
big bridges
2 roadways concrete
80 1938
good
745m9-
center strip
omitted, .
total .width .
i8,5m
wAwwmmlnfrmlm.mtJWIEV.aeimftcf,OEM!WleaMa.cra...,
2 16-m long
abutments,
concreteD
quarry stone
coated
3FICRET
1 roadway
7.5mo
2nd road-
-Nay not
yet com-
pleted
dito
AM211,weCtrze,r?ave..-11,6-...,-.???-lr.resritawayaz.
concret,z
80 1933, ? good
blown up
in 19455
reconstruct,
ed in 1951P5'
Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7
-
50X1-HUM
Bridge On ACTO2S
Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7
Total Span in Bridge
Length Meters Piles
in Ileters
BEG.IET,
AB Chemnitz- Weisse
Elster
River
near
ark_
640 arch bridge, ? 11 piles
12 arches with. up to .60m
58,5m vertical high, marg-
clearance each, .Ing into
concretei, quarry.,d-arches,
stone coated - quarry stone
? Coated con-
orete
Dreaden-Onriitz Autobahn 6
? eerappewecsm?enzt?Vnotacr........r.m.e.,eemangincleantlf
AB ,Dresden - Spree
Criit River
roof coa.v.Ctremese,,
- 14
AbutMent
Carrying
CaPacity
in Tone
Construct-
ion Year
Width Roadway.i
2x4?-mlong
not passable
planned
construct-.
abutments,
planned
to amount
ion stoDped
quarry atone
? coated. con-
crete
to be
of con-
.. erste
to 60
in 1939
?
230 4 arches with - .5 piles
'45-m spana each, blown up
completely blown
up
Berlin . Breslau Autobahn 7
AB ?Berlin-
BT,esian
near Kleinladmeusel
Neisse
River
186 west-east
diruction2
60+42+42+42;
4 flat archest,
steel concrete,
quarry stone
coated
3 piles
between
the arches
2 abutments
solid, con-
c.:eta, partly
existent
welt.210*
solid
concrete,
coated
TAWier,
50X1 -HUM
Condition Pots
in
1956
bridge
only
completed,,
stexte to
? deacqr
5
IZQ10 borda:e
blown up Ilastroyz477
? in 1945
?d? '
1 roadway concrete 80 1937, ? Condition
recanstructO., in. 1955
l?Om+? by the Pole ki good
in 1951/52
arls.p.,..rt
Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7
WIIVIYIWICI[WLIVIVP ?Llr-ft
50X1 -HUM
Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7
3',
4',
5',
SECRET
Comment. On the Dresden - Chemnitz - Eisenach and
Chemnitz - Hof Autobahn are.. many great bridges at short
intervals. Most are arch bridges and are alike in
construction.- The building material was -procured from the
stone-pits of that region. Some of thelarge bridges have
been reconstructed for one roadway only. After Eisenache
the Autobahn has but one roadway.
Comment A. new approach road to the Autobahn was
built near Chemnitze
Comment. According to unconfirmed reports; the second
roadway is planned to be constructed in 1958.
Comment. The bridge across the "lerra River near
Spichra is included in the bridge construction program
for 1957/58v and is planned to have one roadway and a carrying
capacity of 80 tons,
50X1 -HUM
50X1 -HUM
50X1 -HUM
50X1 -HUM
50X1 -HUM
50X1 -HUM
Comment. The greatest arch bridge in atrope was formerly 50X1-HUM
planned to be constructed at this site, Since the nresent
construction is badly decaying, maintenance work is scheduled
to be carried out in 1958.
?6. L_ Comment, Dresden Gorlitz AUtobahn is passable as
far as ,Bautzen yet it is of little importance.. 71th the
exception of the destroyed Spree bridge, described above9
there are no sizeable bridges pn this section. Many of the
small road and dirt road underonossings had been blown Up
and to a large extent reconstructed for both roadwaYs.
7. Comment', The Breslau Autobahn v turning off the Berlin
Dresden section southwest .of Liibbenauv has only one roadway.
The bridge foundations, however 9 have been laid for both
roadways. The construction of the second roadway was scheduled.
to be started in 19549 but was never -cempleted. On a Short .
test section v the roadway was covered with a mixture, of
blastefternace slag and cement or concrete which proved a failure
The provisional bridge across the. Reichsbahn line at. Haenchen
is?being permanently constructed-for one roadway only.
SECRET,
,
Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7
50X1-HUM
50X1-HUM
50X1-HUM