AUTOBAHN BRIDGES IN EAST GERMANY, PART III

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80T00246A026801150001-7
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
15
Document Creation Date: 
December 27, 2016
Document Release Date: 
April 15, 2014
Sequence Number: 
1
Case Number: 
Publication Date: 
September 25, 1958
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80T00246A026801150001-7.pdf1.14 MB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7 CLASSIFICATION sECRET 50X1-HUM CENTRAL INTELLIGENCE AGENCY 'FORMATION REPORT COUNTRY East Germany SUBJECT Autobahn Bridges in East Germany PLACE ACQUIRED DATE OF INFO TM% EZ,WEIEUE COOTAINZ VirORISATIOP hrrzeTima tHATIONAL DEPZUEE OF viz Anarru VRIES WIIHMI 10: nfArlaial OP 7HE E5P1021/GE ACT SO 44 0. St AHD .5Z.AS ALIEHDEIL FIR 5SOt ORHE REV7LATIOU IYO CO.17EU1$ U AY VASIIIEll TO PM onitUT/10a1ZED vtRson is PRO, ,s? HICITE0 CV LAW REpHOOliCTiOt4 OF ThC FOVAI FS PROHIMEN REPORT CD NO. DATE DISTR.25 September 1958 NO.OF PAGES NO. OF ENCLS. SUPPLEMENT TO REPORT NO. 15 50X1-HUM 50X1-HUM 50X1-HUM Tb n following list contains technical data on Au obahn bridges and viaducts in East Germany. Lt..P.TE ARMY 1,47, ' NAVY CLASSIFICATION SWAM DiS RIBUTION NSRB 1. nit 50X1-HUM 50X1-HUM 50X1-HUN Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7 Priclgo on across Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7 15EC,1?11 Total Span in Length Meters in Meter2 - Chenni+*: Eigierhoh Autobahn 1 (Autobahn L, AB) Radebeul 253,59 railroad station AB .Dresdon- Chem?nitz km 3 south-north direction: 1 centinuous steel girder over 4 spans: 29.88+m3,96+ 29344-29,,34; 2nd Continuous steel girder over 5 spans: 25954-!)995-4- 25,)954-95.95+ )027;north- south direction reverse AB Dresden- Elbe 378+ . . . north-south Chemnitz. Rivee 30 diroction: km 6 and high.- way No 6 ? 510+73,01- ? 130,04-73A4r, 51c,0373 tzuss girders on 6 supports through 5 spans, continuing to the southa steel concrete struc- ture over Dres- dreim-Mnissen high- TFay Nc... 6; 30m long with hingtle, support.o e.alpa:,!ato rowayF: on tcp Bridge- Piles north. south ? direction: 1 pile solid coated, 3 hinged steel supports, 1 pile carrying the connection of ths 2 brid- ges, 3 hinged supports 2 Abutment Width ..11C0crw RoadrJay ,2 abutments 2 roadways concrete :solid, quarry 7,5m atone coated Carrying Conotrut- Capacity iGn in Tomo 60 and 30 'i93% 948- partly repaired -.1ondition 'Xote . ia, 1?M6 - luite ? ylood 50X1-HUM iFeS r..c=oc??,=0.4.7...tftesrac ,..reav,. tr., ? Inwax.=F.,?.e-m,..r.zssa.c.troavalp. A ..P11013 oclid, quarry atone coated 2 abutments solid, quarry stone coated 2-roadways conerete? 7,5m, center strip not narro*pdt ? footwalk attached. to upstream side of the bridge. ? 6EG::ET/ 60 and 80 19359 repairea in 1952 Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7 -ery 50X1-HUM Bride on across Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7 Total. 'Span in Length Meters in Meters 11.-0 :Oresdan_ Chemnitz km 11,9 AB Dresden - Chemnitz , km 20 =?,..-er.,.-...-essunesear+aac-Itetcota Saubach near Wiledruff and 1st-class Meissen- Tharandt road 290 north-south incl. direction; abut- 5 arohes, 5m ments in span each, vertical clearancQ Hirsch- 156,6 feldtal (valley) near ponutschen- bora 42m north-south direction; 28,5+33e25+. 33,:-254-33,25+, 28,5=156.75; 2 parallel girder bridges on 6 52- and atone coated 37-steel supports 2 main girders for each bridge Bridge- Piles 4 puce, concrete - 3 - Abutment Width Roadway Carrying. Construct - Capacity ion Year in Tone 4 piles each separated for both bridge parts, connec- ted by arches, concrete, ciin-pilea ker and quarry 2 abutMonts, steel con- crete, not coated 2 abutments, solid, con- structionimilar to that of the 1 roadway concrete 80 no 2nd rcadwayl total width llm 2 roadways conorets .total Width 24m, center etrip not narrowed 80 - 1945 blown up, 1954 reoon- structed 1935 AB Dresden- Mulde Chemnitz River km 27?5 near Sieben- lehn 402,90 north-south direction; 56+61,2+7104+ 81,6+71,4+ 6%2=402,93 1 bridge for two roadwayso continuous steel girder on 7 supports', roadways on top 5 nilea9 concrete coated 2 abutments, 2 roadways solid coated.7.5m, total in southern width 24m, abutment bridge not tunnel for . pedestrians, 60 to 90m? long steel concrete roadway slab, narrowed, 55 cm center part thick between the roadways passable SEC ,IF.311 60 and 80 1935 Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7 ?? ? 50X1-HUN Condition- Note:- ? in 1956 l'iest of all bridges goGd r.U.KrEse, --res.msrosz,Vm,? g oo d 62...211.1sescaamaccom221F 50X1-HUM Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7 ? BrIdgz on across Tntal. Length in. Meters Span in 'Meters Bridge. Piles. Abutment Construct. ion. Year Width Roadway Carrying Capacity in Tone- AB Dresden- Tal der 120 north- south 1 pile, 2 abutments, 2 roadways concrete 60 and 1936 ZheMnitt Grossen direction ashlar solid coated,. 705m, total roadway 80 km 4n StriAg4m (valley) 50470-120 continuous steel girder on 3 supports, separate bridge for each road- masonry, interrupted in the center wing walls about 30m long width 24m, . bridge not narrowed? on hump plates AB Dresden-. Tal der Chemnitz km'42 AB Dresden. Chemnitz km 43.8 Kleinon Striegic 311?10 mcome.averomvarosegamlicevensmishmowv??????*6 Vranken - berg - Rosswein road ........wmomm,swormw.m....1.3smagorpermatummlmemownommaromim 16.5. . AB Dresden. ' aitzelbach 100 Chemnitz at Vranken- km 536 berg and - 1st-class Frankenberg- ,Tlittweida road way, 4 main girders multiple-arch bridge, 10 arnhes with a vertical clear. ance of about 25m each, only western road- way steel concrete slab on 2 sup- ports, vertical clearance 12m 9 piles solid, concrete with quarry stone coating 30+40+30.100; 2 pilee,. solid continuous steel quarry ratonW girder on 4 sup-. coated, for ports, 2 separate each road. bridges, 2 main, way separate' girders each 2 abutments solid, re- maining from former brid wing walls about 20m long 2 solid abutments, concrete,' wing walls about ?10m long 2 solid , abutments, concrete, coated SveRv`l? 1 roadway 715m, no eastern road- way concrete 0, 2 roadways concrete 80 . 7.5m, road? - way not narr- owed, total width 24m 2rrOAUvrays 75m not not total width 24m concrete. on hump plates 60 and 30 Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7 1954 1954 1936v repaired in 1953/54 , Condition, Note in 1956 poor in the -the abut- ment on the Chem- nits aide a 4-cm wid gap very goqa? very ? good Pay ,P1 geed 50X1-HUM 50X1-HUM Bridge on across Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7 0.15,UAN Total Length in Meters Span in Meters- Bridge- Piles Abutment Width Roadway ?-..:0-1,sreormi.l.rstnnver.a. .-gavmm??..a Chemritz- Rieoa rail- road sect- ion via Dobeln AB Dresden-28 Chemnitz km 57 2x1A.28mt continuous steel concrete girder, separa- tely constructed for each track, only in the center an interstice ????ronterAttrrresitona?sbraamsszarnat1520,174?L 1 pile solid concrete quarry stone coated. ? 2 solid concrete abutments, quarry stone coated double - track bridge Carrying Construct Capacity ion Year in Tons solid? floor heavy. freight train of the Reichs.r bahn 1936 .VIAlsezeroff?acttiroratiC7.1,71.4 AS Dresden- Chemnitz-- -64 144-18,084-1464; .3 piles Chemnitz bach continuous steel ooncrete, km 610 girder on 5 aup- quarry stone ports, 4 spans; coated 2 parallel bridges . AT?Dresden Chemnitz- 224 Chemnit7 tal km 63?0 ChemnitzLoipzig railroad line via BurgstgAt side-v:1- ley of the Chemnitz valley and AS Dresden- Chemni.c;z about 390 7x32.224; 37- and 526 steel structure; plate girder bridge, con- tinuous girder on 8 supports multiple-arch bridgepabout 20 arches, semi- circles on high piles015-m spans, quarry .Eofle 2 abutments; 2 roadways solid, con- 7,5m,. crets quarry separated, stone coated center not narrowed , 410114..l. 7 piles solid, quarry stone coated steel concrete roadway slab 50X1 -HUM ? Cond'3tion Nvte in 1956 good 80 1935 . rather ? blown 11.7;) good, in 1946 , built provision- with al bridge, , used new con- material ntri,mtinn in 1953 2 abutmenta, _2 roadways steel solid, con- 7,-,5m; center concrete ?rote, quarry strip pass- roadway stone coated able slab ,.sz,....mtvocresur?-??apmelmaa?sm?s. 60 and 1935 90 about 19 piles 2 solid solid, quarry abutments, ? stone coated quarry stone coated double- solid track floor bridge heavy about freight 1900 train of the Reiohs- bah:a Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7 fairly good fairly good +.4.4.1?11, 50X1 -HUM Bridge on Declassified in Part - Sanitized Copy Approved across Total Span in Bridge- Length- Meters Piles in Meters AB Preeden 28 2x14km28; 1 pile, Chemnitz continuous concrete km 67Q9 steel concrete beam for Release 2014/04/15: CIA-RDP80T00246A026801150001-7 Carrying Construct - Capacity ion Year in Tons . 60 and 1936 80 - 6 Abutment 2 solid abutments, concrete Width 9 m roadway plus 2x2m sidewalks - Roadway small cobblestone pavement in concrete Chemnitz,, Leipzig highway TO 95 MItuttarSIETZLZ.Z9==ar- ist-class -Rabenstein- Grtna road AB Chemnitz-50 Fisenach km 72 -vravaroworem a? 30; arch bridge, flat arch, coated steel -?concrete 2 _solid abutments, quarry atone coated .6 m small 24 (6o 1936 roadway-cobblestow' .t._nd pavement in in ibly 80) plus 2 - elevated . concrete protective embankments _ AB Chemnitz- Mulds 150 Eisenach River km 05 near alauchau 5x30150; - 4 Pilzzg continuous - concrete, ? steel_ girder solid ? on, 6 supports Tm.fcl?.. abutments steel con- crete 2 roed.ways steel con- 60 and 1937 crete road- BO separated slab -rreNepecw=9.... AB Chemnitz"- Franken-491 Eisenach haussn km 90 valley east-west 17 piles, directiont concrete& 224-9x2703+' without 3x2904-4x coating 28,5+224914 continuous steal 2 abutments solid, steel concrete, ? each about 12m long, not coated -=,....M3.==.1=2.5412==a7NUMOVistautrAeamin-... 2 roadways steel con- 60 ana 1_937. 7?5m, pen- ,orete road- BO ter strip way slab passable. ? concrete struct,= ure on 19 supports .-13-.C2r.=+$1,004.,391....`9,..11}1K,..922.2100.701Rett, Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7 50X1 -HUM Conditin Note In 1956 getd 4 tEf.rly go cd nede- neu ()oat .of paint good 50X1 -HUM Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7 Bridge on, across Total Span in Length Meters in Meters AB Chemnitz- Weisse Eisenach Eleter km 100 River about about 5 20-m 100 spans, contin- uous steel girders 4,21- AB Chemnitz- Gera- Eisenach Zeitz km 100 highway No 2 and Gera- Zeitz railzoad line about about 2 15-m 30 spans contin- uoua steel girders 2nd-olase Vistritz- T8ppeln road ? ' -AB Chem-7.- nitz - Eisenach ? km 101 about _c0 arch bridgeo? 1 archl 50 m AB,Chemnito- AB Berlin- 48 Eisenach NUrnberg km 110 (Hermodor- fer Kreuz) Terl ? continuous , steel girders on 5 supports 4x12 m Bridge Piles GilET4 Carrying -.Capacity in Tons Cqnstruct ion Year Condition in 1956 50X1-HUM _7 7 Ptcutmvrt aidth Roadway 4 piles concrete solid - ? - 2 abutments 2 roadways solid steel .75m9 (len- concrete ter. strip .passable steel 60 and . concrete 80 roadway slab 1937 good good - the biruwo 1 pile solid concrete , 2 abutments ? 2 roadways _ olid steel , 7..5m,. Oen- . concrete ter strip )assable - ? steel_ 60 and concrete 80. roadway - slab 1937 Cter_a lie closely behfund each otheT .....c-a---rmarznantearearansn, 2 abutments 6 m solid roadway ..-.1,-112srecteeetro....?fertit small 24 cobblestone paven.ert in concrete 1937 good. 3 rows hinged stel supports ? 2 abutments 2.roadwa3rs solidpcon- . To5T orete, coated 2x6-m wide tuvn-off 1Phc:s4 total Aracamattusr.assor??wvezzo.n.c.r2waram-raneres--,-...m. concrete 60 and roadway 80 slab- 1937 goq4, Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7 G-???,....-mitassemzporenot... 50X1-HUM Bridge on across - Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7 Total Span in Length - Meters in Meters AB Chemnitz- Teufels- 270 Eisenach tal km 112 (valley) AB Chemnitz- viaduct Eisenach across km 116 the Zeits- grund Bridge.- -Piles steel concrete arch bridge, 1 arch with 138m vertical clearance, road- way on spandrel columns4 con- crete, not coated 6EC-in AO piles, 20 spandrel columns, - 2 separate parallel bridges 250 5x50; 4 piles continuous solid, con - steel girders orete, con on 6 supports . tinuous for through 5 spans, both road - 2 separate bridges with 2 main girders each, welded construction ways, in the. center great arch aper- tUre Abutment Carrying Width Roadway. Capacity in Tons 2 small ? 2 roadways steel 60 and abutments 751119 :sus- concrete 80 solid pended cen- roadway concrete ter strip, passable, width be ? tween rail ings 218m slab .....zsp.mtratatz.vxmCSF-txt 2 a:Aid abutments .2 roadways steel . 7,5m, sus- coonorete pended con- roadway, - .ter strip,. slab passable, width be- tween rai- lings21,8m AB Chemnitz- valley Eisenach near joi 118, PodeL. (so.oalled at Podelsatz Vladukt) 250 9 27,m spans, continuous Steel concrete bridge on 10 . supports for each roadway . 8 separate -piles, con- crete, solid 2 small abutments, solid, concrete, not Heeparated CRVIC61179=1.61traelT 60 and Co Construct. ion Year 1938 1938 smse.......creamerfe.?? . 2 roadways stsok . 7.5m, sus- concrete pended cen roadway ter strip- slab passable, width be- tween rai., lings 21,8m bEG.q01) 60 and 1938 80 Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7 Condit - in 1956 good good. Note- 50X1 -HUM 50X1 -HUM good. limaraes324-.Inanrawarr .112171-615.1Antacbeatigsaom. tm.X1102...a3atarRs. 50X1-HUM Bridge on across AB Chemnitz- Eisenach before jena-west entry Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7 Total Span in Length -Meters in Meters Saaletal 700 across; I rivulet, Seale Ri- ver, rail- road lines Gera-Wei- mar and Jena-Saal- feld and Jena-Saal- feld high- way No 88 1st-class Nennsdorf- ZitMritz road, so-call d P-5 sr arcah bridge. arch bridge, 17 arches, quarry stone coated Si6C.d.ET Bridge Piles .16 piles, .conorete, rock coated - 9 Abutment 2 big-. eolid? coated abutments twair=0..znfttexeszCpsmea..1W.reSSAVOILac.a4,..sp,S1,42.1)Smaisem..tecaacur-.2,-*.asaeac62:ts*"..., AB Chem. 100 nitz incl, Eisenach abut- km 6 after merits' Jana-west entry AB Chemnitz- Erfurt- . aArnetadt highway a.No 4 Eisenach Erfurt- w6ot. entry 2 fixed arches with 38m spans, roadway on spandrel oplumns steel concrete 28 steel girders incl. on 2 supports., abut-. 12,5m spans ? manta each. Width Roadway- - egae?. 2 roadways? concrete 705m9 roadway total width slab 18,8m, center strip pass b 1 center pile, 2 small actually only abutments foundation and support for the two flat arches 6m roadway sidewalks on both sides .6.160.21.?02.01,43.114?1?1?20. 4,04 Carrying Capacity in Tons 60 and 80 -Conctruot Condition Note ion Year in 1956 19389 very 2 arches good blown up, reconstruc. ted in 1953/54 email 60 cobblestone pavement. 2 abutments 2 roadways steel _ quarry stone 7,5m, Auto. concrete coated bahn profile, road-, no narrow- ing way slab 1938 ..........Mers?olareaters-as, ? 60 and 1938 .80 SECAEL Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7 good -good 50X1 -HUM Bridge on across AB Chemnitz- Ilm lear Eisenach, MOnin- at Mollin- gen Rep entry Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7 Total Span in Length Meters in Meters 300 incl. abut- mento 5 arches with 42m vertical clearance each,. clinker masonry, the rest of quarry stone coated concrete .SECUEZ Bridge- Piles 4 intermediate piles ip Abutment 2 big abutments with about 27-m long wings Width 2 roadways 7?5m, to- tal width between railsings 2005m Roadway steel concrete roadway Carrying Construct - Capacity ion Year in Tons 80 CondAtion Note in . 1956 19380 blown up in 1945 arch,g reoonstructe-:: in 1953-54 ,.....yrassIvatampaugmars. ist-clas AB Chem- 70. Trfur.t!- nitz- incl. Tannrcla Eisenach adjoin.' road Erfurt-. Ing north arches entry -WammftleimalW luMW ? AP Chemnitz- Geratal Eisenach ? AB Chemnitz Tal der Eisenach Apflc bore Gotha Stadt entry 1 quarry stone arch with 33m spanitopped by 14 spandrel arches which carry the rondways no piles, arches merge directly into the foundat- ions 100 3 arches with 2 piles 16-m spans concrete, concrete, quarry quarry stone coated stone coated 108 5 arches with 22m vertical clearance each, quarry stone coated concrete 2 piles, concrete, with quarry stone 2 very small abutments, terminat- ing the spandrel arch row roadway 6 mg sidewalks small 60 and cobblestone 80 pavement in concrete nyamooszaecelccosems?saryra3?Unras...22.1.1o.ar. 2 abutments 2 roadways concrete solid, con- 7.5m, Auto- roadway orete9 coated bahn profile, no narrowing - 2 abutments, 2 roadways. concrete solid, 'con- 705m, Auto- roadway orate, coated bahn profile, no narrowing SEC:ET) 60 and 80 60 and 80 1938 Se* very good 50X1-HUM SX.V0/..ezterereroarrereas 1938 1938 A,Tygissa air.Ja.raticsoweanss6sale Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7 -,92.0104,11aSt good good good "Ta7.19ririto laTeMiesser. 50X1-HUM Bridpe on across Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7 Total: Length in Meters AB Chemnitz- 'Eisenach 7 km after Gotha entry fforeel, Ist-olass Gotha- 7alters- hausen road and narrow- gauge railroad line 76050 with- out abut- ments SECii12, 11 - Span in Bridge Abutment .? Width Roadway Meters Piles 24+28.5+24; 2 piles5 2 abutments, 1 roadway steel 5 main girders concrete old, concrete R7051/1, coated: l for provision- concrete roadway each roadway shifted by 8m, perpen- dicular to the road axis al bridge dm, north, roadway new Carrying Construct - Capacity on Year in Tons Condition Note in 1956 50X1 -HUM new north,I9385 roadway blown up 805 south. roadway ? 15 1945, provision- al. bridge in 19479 northern. roadway reoonstructed in 1954 northern roadway good, southern roadway poor AB Chemnitz 7 Langen- isenach, ? ' Eisenach- Eisenach east highway entry No 84' 12, with abut- ments 22m steel girders on 2 supports, 12m span, 5 main girders AB Chemnitz- '!ferra EAsenach River 1.0 8 arches with 15-m spans, semicircular arches, con- crete, quarry stone coated 7 piles, concrete, quarry stone coated 2 abutments, 1 roadway old., concrete., 70.5m quarry stone coated 2 big abutments, solid, con- crete, coated planned steel concrete roadway 80 1938p blown up in 19450 northern roadway reconstructed northern roadway good to have 2 roadways 7.5m not completed, construct- ions stoppee,. in 1939 27,0ne border 4 SECIETe Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7 50X1-HUM Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7 Bridge on across Total Span in Length Meters in Meters ?Bridge- Piles 4arin - 12 Abutment Width Roadway . Carrying Construct- Condition Note ? Capacity ion Year in in Tons 1056 Chemnitz - Hof Autobahn _ _ AB Chemnitz- Chemnitz- 16 steel struot- Hof Zwickau ure as girder - 4 km after Highway on 2 supports Chemnitz No 173 50X1 -HUM 2 solid ?2 separate steel 60 and - 19369 aatiefactoryg abutments, roadways concrete 80 blown up, built with quarry 'Min roadway in 1952 . Used material stone coat- slab recon - ed cone,- structed orte - AB Chemnitz- Zwickauer 700 valley bridge, about . 2 solid Hof Mulde, R8- steel structure, 9 or 11 .pile-s abutments, km 38 delbach, continuous concrete, coated double-? girder, about coated conore track 10 or 12 spans Zwickau- Aue rail- road line, Zwickau- Schneeberg highway NP 93 AB Chemnitz- Zscho- 120 valley bridge, 4 piles ?. Hof chener steel structure, concrete ?km 27 ? Tal continuous coated girder through 5 spans 2 solid :abutments, concrete coated roadways Ste. concrete roadway slab 2 roadways 7,5m steel concrete readWay -slab 60 and 80 1937. -good 1937 g'3.110.10r, Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7 good -.VIONIMM4111011? 50X1-HUM Bridge on across Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7 Total Span in Length Meters in Meters. Bridge Piles SECZT, - 13 Abutment AB Chemnitz- Obltzsch not' Tal km 56?7 379 arch bridge 5 arches with 50m vertical clearance each, quarry stone and concrete 4z5.6-m high piles merging into arches, quarry stone and concrete 2 great abutments,. 40m long each, con-. crete with quarry stone coating AB Chemnitz- Triebtal 373 Hof km 7205 AB Frie- of tal arch bridge, 5 piles 6 arches with merging into 37m vertical arches, con - clearance each, orete and concrete, quarry quarry stone stone coated 200 ' arch bridge,- ? 7 arches with lqm vertical cleartne each, concrete and quarry stone /15.1ff ATTOC,F,Slief '6 piles' merging - into arches,_ concrete and TAarry stone abutment on Chem- nitz side . about 30m long, on Hof eido extended as parking place, 60m long, con- crete- with quarrz store 'Carrying Construct-. Capacity ion Year in Tons. 50X1-HUM - Condition Note In 1956 Width Roadway 2 roadways concrete 7,,5mg.cen- 80 1938 bridge good . ter strip capacity omitted, of no total width 19m importance with such big bridges 2 roadways concrete 80 1938 good 745m9- center strip omitted, . total .width . i8,5m wAwwmmlnfrmlm.mtJWIEV.aeimftcf,OEM!WleaMa.cra..., 2 16-m long abutments, concreteD quarry stone coated 3FICRET 1 roadway 7.5mo 2nd road- -Nay not yet com- pleted dito AM211,weCtrze,r?ave..-11,6-...,-.???-lr.resritawayaz. concret,z 80 1933, ? good blown up in 19455 reconstruct, ed in 1951P5' Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7 - 50X1-HUM Bridge On ACTO2S Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7 Total Span in Bridge Length Meters Piles in Ileters BEG.IET, AB Chemnitz- Weisse Elster River near ark_ 640 arch bridge, ? 11 piles 12 arches with. up to .60m 58,5m vertical high, marg- clearance each, .Ing into concretei, quarry.,d-arches, stone coated - quarry stone ? Coated con- orete Dreaden-Onriitz Autobahn 6 ? eerappewecsm?enzt?Vnotacr........r.m.e.,eemangincleantlf AB ,Dresden - Spree Criit River roof coa.v.Ctremese,, - 14 AbutMent Carrying CaPacity in Tone Construct- ion Year Width Roadway.i 2x4?-mlong not passable planned construct-. abutments, planned to amount ion stoDped quarry atone ? coated. con- crete to be of con- .. erste to 60 in 1939 ? 230 4 arches with - .5 piles '45-m spana each, blown up completely blown up Berlin . Breslau Autobahn 7 AB ?Berlin- BT,esian near Kleinladmeusel Neisse River 186 west-east diruction2 60+42+42+42; 4 flat archest, steel concrete, quarry stone coated 3 piles between the arches 2 abutments solid, con- c.:eta, partly existent welt.210* solid concrete, coated TAWier, 50X1 -HUM Condition Pots in 1956 bridge only completed,, stexte to ? deacqr 5 IZQ10 borda:e blown up Ilastroyz477 ? in 1945 ?d? ' 1 roadway concrete 80 1937, ? Condition recanstructO., in. 1955 l?Om+? by the Pole ki good in 1951/52 arls.p.,..rt Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7 WIIVIYIWICI[WLIVIVP ?Llr-ft 50X1 -HUM Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7 3', 4', 5', SECRET Comment. On the Dresden - Chemnitz - Eisenach and Chemnitz - Hof Autobahn are.. many great bridges at short intervals. Most are arch bridges and are alike in construction.- The building material was -procured from the stone-pits of that region. Some of thelarge bridges have been reconstructed for one roadway only. After Eisenache the Autobahn has but one roadway. Comment A. new approach road to the Autobahn was built near Chemnitze Comment. According to unconfirmed reports; the second roadway is planned to be constructed in 1958. Comment. The bridge across the "lerra River near Spichra is included in the bridge construction program for 1957/58v and is planned to have one roadway and a carrying capacity of 80 tons, 50X1 -HUM 50X1 -HUM 50X1 -HUM 50X1 -HUM 50X1 -HUM 50X1 -HUM Comment. The greatest arch bridge in atrope was formerly 50X1-HUM planned to be constructed at this site, Since the nresent construction is badly decaying, maintenance work is scheduled to be carried out in 1958. ?6. L_ Comment, Dresden Gorlitz AUtobahn is passable as far as ,Bautzen yet it is of little importance.. 71th the exception of the destroyed Spree bridge, described above9 there are no sizeable bridges pn this section. Many of the small road and dirt road underonossings had been blown Up and to a large extent reconstructed for both roadwaYs. 7. Comment', The Breslau Autobahn v turning off the Berlin Dresden section southwest .of Liibbenauv has only one roadway. The bridge foundations, however 9 have been laid for both roadways. The construction of the second roadway was scheduled. to be started in 19549 but was never -cempleted. On a Short . test section v the roadway was covered with a mixture, of blastefternace slag and cement or concrete which proved a failure The provisional bridge across the. Reichsbahn line at. Haenchen is?being permanently constructed-for one roadway only. SECRET, , Declassified in Part - Sanitized Copy Approved for Release 2014/04/15: CIA-RDP80T00246A026801150001-7 50X1-HUM 50X1-HUM 50X1-HUM