TRIP REPORT CONCERNING THE IMAGE ENHANCEMENT VIEWER
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04747A003100010053-9
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
1
Document Creation Date:
December 28, 2016
Document Release Date:
February 9, 2000
Sequence Number:
53
Case Number:
Publication Date:
July 31, 1963
Content Type:
MFR
File:
Attachment | Size |
---|---|
![]() | 80.15 KB |
Body:
SECRET
Approved For Releas~,2000/05/10: CIA-RDP78B04747A003100010053-~
31 July 1963
MEM(~I~A1VDiJM FOR THE RECORD
SUN,.7E~Ts Trip Report concerning the Image Enhancement Viewer
STATOTHR
1. tin 30 July a. conference was held with of the
7tek Corporation in Lexington, Massachusetts. Work on Phase TT of the con-
tr~i.ct ha.s been underway for approximately -three weeks and fabrication of STATOTHR
Parts far the completed instrument ha.s begun. indicated that-the
fabrication of the completed instrument would mast likely require less than
3TATOTH R three months. has obtained some low a.Ititudephotography
which Itek wou ike to test in the completed instrument. A period of two
to three weeks would be required. to complei;e this test procedure and I saw
no objection in their use of the instrument to obtain specific information
__.___.._ in which t.h n,r Liov+c+r iv~~l-,...,,... ...1._~ mh _
?+- ?cGp1
mechanical ens veer: ~ti.__~~ _, _~
STATOTHR
2. A proposal was. made to that after the fabrication of the
instrument had been com feted the i ument would be sent to NPIC for
25X1A continued research by It wss impressed upon STATOTH R
o
e instrument while
concluding the final testing procedures. said ths,t he would like
a month to-think this over and to see how the instrument was progressing.
STATOTH R It was agreed that the months eriod would be sufficient to better evaluate.
the contract status. s.Iso requested that Itek be allowed to
evaluate the Image Enhancemen iewer by using the low altitude photography
reproduced a.t different sea.les. Agreement wa.s reached on this point since
the information will be valuable to both. Itek and NPIC.
3. If the instrument is delivered to NP2C for completion of the final
test Phases of the contract, it wa.s agreed that a,11 notes a.nd conclusions
would be included in the technica,I manual to be completed by the Itek Corp.
and that an amendment to the contract be submitted by Itek covering the
cost differential for this change in the contract.
~-. It is therefore recommended that (1~ ~ period of one month elapse
for Itek to study the proposed change in this contract, (2~ Itek be allowed
to eva.l.ua~te low altitude photography a.t different scales, (3) NPIC make
preparations for eventual receipt and testin{; of the Image Enhancement
Viewer.
that this proposed change in the contract in no way reflects upon e ability
of his personnel and that the main reason for this change would be that our
personnel could becom
fa
il
e
m
iar with the operation
STATOTH R
f th
Approved For Release 2000/05/10: CIA-RDP~8B
eve or~mPnt R'rsa?~~ 'p4_rta
SECRET