SMORGON IRBM COMPLEX, USSR LAUNCH AREA NO 3

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05439A000400170053-5
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
6
Document Creation Date: 
December 28, 2016
Document Release Date: 
August 24, 2001
Sequence Number: 
53
Case Number: 
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T05439A000400170053-5.pdf291.13 KB
Body: 
Approved For Release 2001/09/03 : CIA-RDP78TO5439A000400170053-5 Approved For Release 2001/09/03 : CIA-RDP78TO5439A000400170053-5 Handle Via TALENT-KEYHOLE Control System Only TCS-7862/64 NPIC/R-837/64 Launch Area No 1 (TDI name: Smorgon Launch Site 1) -- Type III 54-31-13N 26-17-30E BE No Launch Areq No 2 (TDI name: Smorgon Launch Site 3) -- Type III 54-36-15N 26-23-15E BE No I,aurtch Area No 3 (TDI name: Smorgon Launch Site 2) -- Type IN' 51-26-15N 26-18-15E BE No Smorgon Fixed Field Site (TDI name:. Smorgon SSM Fixed Field Position) 5434-45N 26-21-30E 25'25 25X1 D 25X1 D SMORGON IRBM COMPLEX, USSR LAUNCH AREA NO 3 26'401 N PIC J-9804 (9/64) This, report, based. on KEYHOLE photog- is given in the referenced report. Launch Area, raphy of No ?3 is a complete Type IV launch area located and updates that portion of NPIC/R- 4.3 nautical miles (nm) southwest.of Smorgon,. 106/64 1/ concerning Launch Area No 3. Infor- in the Belorussian SSR (Figure 1). mation on the remainder of the Smorgon Complex Declass Review by.NIMA/DOD - 1 - Handle Via TALENT-KEYHOLE Control System Only TOP-SECRET RUFF Launch Area No 3 was next seen in - but because of snow cover the only - change discernible was some new road scarring in the site support facility. Launch Area No 1 was in the late stage of construction and Launch Area No 2 was in the early to midstage of con- struction. The complex was again covered in but heavy clouds and haze precluded detailed interpretation. The next coverage of the area was in when one launch silo, excavations for two other silos, and construction around the control bunker were present. The site support facility had expanded to include eight buildings. Launch Area No 1 was now complete and Launch Area No 2 was in the mid- to late stage of con- struction. The fixed field site showed no changes. When next covered in the launch. site contained three launch Handle Via TALENT-KEYHOLE Control System Only TCS-7862/64 NPIC/R-837/64 Launch Area No 3 lies in the center of a small, heavily wooded area at an approximate elevation of 650 feet. The surrounding terrain is hilly and rolling. An improved probably all-weather road connects the area directly with the probable complex rail-to-road transfer point, 3.5 rim to the northeast, and with Smor- gon. The probable rail-to-road transfer point is a railyard 0.8 nm southwest of Sm argon along the main line connecting Smorgon and Vilnius. The yard is seven tracks wide and contains approximately 20 buildings of which six are very large warehouse types and the others are proba- bly shops and storage. The area is also connected by an improved road network to the other launch areas in the complex. Launch Areas No 1 and 2, both complete Type III areas, are located 5.7 ism to the north and 10.5 nm to the north-northeast, respectively. The Smorgon Fixed Field Site is located 8.8 nm to the north- northeast. This launch area was first observed in at which time, because of the poor quality of the photography, only the outline of the launch site, the site access road, three buildings in the administra- tion and housing section, and some of the road network were discernible. The status of con- struction could not be determined. Smorgon. Launch Area No I was in the midstage of con- struction and Launch Area No 2 was also first observed in the early stage of construction. The Smorgon Fixed Field Site was present. - In Launch Area No 3 was again observed and excavations for the control bunker and two Iaunc'i silos were dis- cernible. New scarring was visible in the admin- istration and housing section but no increase in facilities was observed. Launch Area No 3 was identified as a'Type IV IRBM launch area in the early stage of construction. Construction also was proceeding at the two soft launch areas. 25X1 D 25X1 D 25X1 D 25X1 D silos and a control bunker, plus three associated buildings. . The site support facility now con- tained approximately 12 buildings. No 2 still was under construction. In Launch Area when the area 25X1 D was, again observed, the launch site was nearly complete. The control bunker had been covered, the loop road was present, but some activity was continuing around the three launch silos. The site support facility was expanding and now contained approximately 18 buildings. A new receiving, inspection, and maintenance (RIM) facility including a building and one unidentified building were under construction to the west of the site support facility. Launch Area No 2 was in the late stage of construction. In late when again covered; the launch site was complete and contained three launch silos with covers, a control bunker, and a loop road. The RIM facility was under construction, as were some buildings in the site support facility. 2 - 25X9 Handle Via TALENT-KEYHOLE Control System Only - TOP SECRET RUFF TOP SECRET. RUFF 25X1 D Handle Via TALENT-KEYHOLE Control System Only TCS-7862/64 NPIC/R-837/64 ~/ .Z" r-r rj- rT. TO SMORGON AND RAIL-TO-ROAD TRANSFER POINT SLUGE H SETTOLIING---~^, BASIN ( / ~"~ r~rYa ti j / ADMINISTRATION HOUSING SECTION ` ? Y^= ` rT`` P Y ~j ,:. RIM' a - r un mprove ro Bunker ~s4 41mom Earth-mounded building Building +~ . Unidentified object 1w ~~~ 1000 0 1000 FEET IA PP R OXIM A TEI - LAUNCH SITE SITE SUPPORT FACILITY (Dimensions in feet) (Dimensions in feet) Pad orientation 225?- ADMINISTRATION/HOUSING SECTION TECHNICAL SECTION 1 Mounded control building i'150 x 70 8 Barracks-type buildings 150 x 40 . 1 Building 150 x 40 (not visible) 1 Building 125 x 50 1 Building 135 x 40 1 Building 130 x 50 1 Building 100 x 40 1 Building 80-x 70 1 Building 115 x 45 6 Small buildings .1 Building 80 x 65 1 Building 90 x 35 3 Unidentified objects 2 Buildings 75 x 30 3 Silo covers 1 60 x 50 1 Building 70 x 65 1 Unidentified structure 50 x 50 1 Building 65 x 30 1 Building 40 x 20 1 Building 55 x 40 3 Small buildings RIM FACILITY 1 Missile-ready building 180 x 40 1 Building 70 x 55 1 Building 45.x 45 25X1D TOP SECRET RUFF Handle Via TALENT-KEYHOLE Control System Only TOP SECRET RUFF 25X1 D Launch Area No 2 ' was now complete. On the Handle Via TALENT-KEYHOLE Control System Only the launch site was complete, the site support facility contained 31 structures, the TCS-7862/64 NPIC/R-837/64 stration and housing section and the technical section. These two sectio_z ; contain 19 large buildings, nine small buildings and three uni- dentified objects. Located 1,260 feet west of the site support d- north of the launch site 25X1 D latest coverage in 25X9 25X9 e building and the igloo in the mounded and the remainder of the RIM facility contained three buildings, including the missile- ready building. The access road enters the launch area (Fig- ure 2) from the north and passes through the site support facility. It continues another 3,000 feet where it starts to rise 'and forms _a-heart- shaped loop serving three launch silos and a small unidentified structure. In the center of the loop is. the previously mounded control bunker. Also present at the launch site are three Marge and one small buildings. The site support- facility consists of two sections: the admini- had been earth facility an is the RIM facility. The RIM facility consists of three buildings, including a missile-ready building, a small building, and a building of unknown function with a small structure on either side of its entrance. bunkered. All building's- of major proportions in the RIM _facility are drive-in.; No security fencing was evident around the launch area or any of its components. Handle Via TALENT-KEYHOLE Control System Only TOP SECRET RUFF TOP .SECRET RUFF Handle Via TALENT-KEYHOLE Control System Only 25X1 D PHOTOGRAPHY TCS-7862. /64 NPIC/R-837/64 MAPS OR CHARTS A\IS_ Series N501, Sheet NN 35-5, 3d ed, May 62, scale 1:250,000 (UNCLASSIFIED) S~C. US Air Target Chart, Series 20.0, Sheet 016S-SHL, 3d ed, Dec 62, scale 1:200,000 (SECRET) DOCUMENT 1. NPIC. R-1J6/64, Smorgon 1'RB.1 Complex, USSR, Feb 64 (TOP SECRET RUFF) GMAIC-4-64 TOP SECRET RUFF Handle Via TALENT-KEYHOLE Control System Only