TSG/RED MONTHLY REPORT FOR JULY 1972
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04747A000300020006-1
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
8
Document Creation Date:
December 28, 2016
Document Release Date:
April 15, 2004
Sequence Number:
6
Case Number:
Content Type:
MF
File:
Attachment | Size |
---|---|
![]() | 259.53 KB |
Body:
Appr~
ved For Release 2 0'S 1IA-RDP78B047
=pool
25X1
RG.,... - ., (-
25X1
MEMORANDUM FOR: Chief, Technical Services Group, NPIC
ATTENTION : Chief, Technical Operations Staff, TSG/NPIC
SUBJECT : TSG/RED Monthly Report for July 1972
A. Significant Items of Interest for July 1972:
1. Enlarger/Printer. Preliminary tests performed by the
project monitor indicate that the new dry silver paper used in this
instrument is a vast improvement over the old material. It was
hoped that this instrument would be available to IEG for operational
testing in July. ESD has encountered scheduling problems and will
not be able to test this instrument until September, therefore, it
will be October before operational tests can begin.
2. Scan & Search PI Station (SSPIS).is installing
the "programmed scan" on the SSPIS. They are also correcting the
failures reported by ESD
during the acceptance tests.
The SSPIS will be moved into IEG the first week in October for
operational suitability tests.
3. High Intensi Light Source - has been completed and
preacceptance tests will be performed the week of 31 July.
NRO review(s) completed.
Declass Review by NIMA/DOD
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
SECRET
Approved For Release 2004/05/12 : CIA-RDP78B04747A000300020006-1
Appr
25X1
SUBJECT: TSG/RED Monthly Report for July 1972
4. Model II Stereomicroscope Eyeshades
I The
eyeshades have been delivered. ESD has completed their tests and
the eyeshades are presently in IEG undergoing operational evalua-
tion.
25X1 S. L[Lighit Tables. Modifications to the DIA version of
25X1 the light tables have been completed. RED and DIA personnel
will perform preacceptance tests at the facility the week of
31 July.
25X1
6. Image Enhancement. Early results of tests on
materials utilizing this process have been very encouraging.
of RB is training additional PSG personnel to use the coating process.
7. Operational Suitability Test Plan for the Scan & Search PI
Station - was received during the reporting period. Present plans
call for operational suitability testing on the SSPIS to begin late
in the next reporting period.
8. Color F.cLuipment Investigation Program
25X1
25X1
Automatic Densitometer and the MMficrocolorimetry Research Report
will be delivered in August. Under the consultation task,
ved For eleage 200 R I--RDP78B0474477A000300020006-1
visited
ssess their capabilities regarding colorimetric
image manipulation; he was quite impressed with the
and facility.
0
capability
Approved For Release 2004/05/12 : CIA-RDP78B04747A000300020006-1
25X1
25X1
11
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
Appro4'
SUBJECT: TSG/RED Monthly Report for July 192
initiated by SC$PB/SS; initial conversations will be held on_7 August.
Color Difference Program
10. Color Simulation Photography~Shooting of the
final set of pictures has begun.
11. National Bureau of Standards. Scanning. Electron Microscopy
Laboratory effort was completed at NBS and the final report will be
submitted by 4 August. A preview of the reports indicated that a
great effort was expended but that striking micrographs of film
relief images were not attained. This was due largely to the virtual
non-existence of a present art in preparing photographic film surfaces
for SEM viewing. Upon receipt of the NBS report, a status report
of our probing effort into SE`4 will be issued.
ed F,g Release 2001D iiC 4-RDP78B04~7447A000300020006-1
Process Development
from) lindicates that they have received authorization to
proceed with this program. GFE necessary to this project was
on 2 August.
13. Image Translator scanner - was separated from the display
console and moved into the clean area. The move separated the Image
Measurement Facility from the DIM console. It involved about 17
man-days of GSA support.
14. Optical Image Manipulation The final report
on OIM has been received and is being reviewed.
25X1
25X1
25X1
25X1
25X1
25X1
SEC~ET
Approved For Release 2004/05/12 : CIA-RDP78B047
proved'F4W,,Release 20 T C44IIA-RDP78B04747A000300020006-1
25X1
25X1
SUBJECT: TSG/RED Monthly Report for July 1972
15. Optical Power Spectrum, Phase III
work statement has been reworded. The essence of the change is an
increased emphasis on more thoroughly evaluating OPS as an image
quality measurement technique, as compared to the prior emphasis on
modifying and testing the TID as an image quality measurement tool
presented their scheduled project review and-the
and performing associated OPS studies.
present as an observer at the project review.
]6. Wide-Field Microscope Development
of OSP was
went a bench test of one complete optical train. On-axis resolution
exceeded specifications but some misalignment in certain components
resulted in "less than spec" off-axis resolution. After alignment,
another test will be performed before proceeding with final instru-
ment fabrication.
.delayed about two months because excessive vibration conditions at
a subcontractors plant (caused by local construction) precluded
machining the lenticules in the glass.
17. 30" x 30" Lenticular Screen Development
25X1
25X1
25X1
25X1
25X1
25X1
25X1
}
Approved For Release 2004/05/12 : CIA-RDP78B04747A000300020006-1
Ap
proved For Release 2 , / TCIA-RDP78BW47A000300020006-1
%W
ATTACK 1ENT TO:
SUBJECT: TSG/RED Monthly Report for July 1972
19. Object Recognition Guides
has been extended into
Phase II which will prepare Guides for Chinese Order-of-Battle targets.
(Phase I'produced Guides on Soviet OB targets which are now being
used by Pi's in IEG and elsewhere.)
20. CRT Image Quality Assessment Program Final reports
.were received.
21. Study of Storage & Retrieval of Digitized Imagery
Final reports were received.
22. Mensuration Parameters Data Storage The
requirements analysis work for the project was performed during July
in-house by
fall.
personnel. Study is to be completed by early
Ground Coverage Displaj
The requirements
definition phase of the project was performed by
personnel
working primarily in-house. Phase II, an analysis and cost effective-
ness study of various potential map display technologies, will be
performed
24. Digital Mensuration Study - is
progressing as planned. Company personnel are working closely with
NPIC photogrammetrists and to define acceptable
image parameters for the study.
5
SECRET
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
Approved For Release 2004/05/12 : CIA-RDP78B04747A000300020006-1
25X1
Approv
25X1
25X1
SUBJECT: TSG/RED Monthly Report for July 1972
25X1 begun during July a
MEETINGS, BRIEFINGS, ETC.:
25X1
25X1
NASA for the manufacture of emulsions in space.
This was related to a proposal from
25. Automated
a. The Color Exploitation Working Group
b. EXRAND
c. Representatives of DIA Photo Facility
he project was
2. The following groups were briefed on the Color Control Cell:
3. Mr. Lundahl was briefed on the possible deleterious effect
on grain size frequency distribution of a photographic film caused
by passing the raw emulsion through an exchange purification bed.
25X1
25X1
25X1
SECRET
pr ReIeasa6410 1J : CIA-RDP78BO4747A000300020006-1
Approved For Release 2004/05/12 : CIA-RDP78B04747A000300020006-1
25X1
Appro
25X1
25X1
25X1
25X1
SUBJECT: TSG/RED Monthly Report for July 1972
a. High Resolution Printer
2. Proposals have been received on the following subjects:
PROPOSALS APPROVED AND RECEIVED:
1. Engineering Sup rt for TID
been revised.
This proposal has
II
b. Change-in-Scope Scan E Search PI Station
c. Change-in-Scope Interactive Stereoviewer
d. 20" x 20 Light Table
25X1
25X1
25X1
25X1
25X1
SECRET
Approved For Release 2004/05/12: CIA-RDP78B04747A0 -
25X1
Apps
roved 4r Releaser 226g4 O Ii12 : CIA-RDP78B04747A000300020006-1
25X1
25X1
SUBJECT: TSG/RED Monthly Report for July 1972
B'. Significant Items of Interest for August 1972:
The BG Color Course, to be taught by
will be given 28-30 August.
25X1
25X1
Deputy Chief
Research $ Engineering Division
NPIC/TSG
Distribution:
Orig $ 1 - Addressee
1 - TSG/RED
25X1
Approved For Release 2004/05/12 : CIA-RDP78B04747A000300020006-1