MOLLER ENGINEERING WORKS, SHANGHAI, CHINA

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05694A000300010003-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
6
Document Creation Date: 
December 28, 2016
Document Release Date: 
June 6, 2001
Sequence Number: 
3
Case Number: 
Publication Date: 
July 3, 1956
Content Type: 
IM
File: 
AttachmentSize
PDF icon CIA-RDP78T05694A000300010003-2.pdf498.32 KB
Body: 
1 1 D I Y 1 I A i CORY No. 1 F PHOTOGRAPHIC INTELLIGENCE MEMORANDUM CENTRAL INTELLIGENCE AGENCY OFFICE OF RESEARCH AND REPORTS ViEWFPZ ' OJ "2?1l1' l [ I IIdP78T05694AO00300010003-2 NO CHANGE IN C :j CQ DECLAStF~: p =T' ntn~nRnt `~sjcvr ~~ ~ + r~ ,.~ CONTINUED CONTROL Approved For Release 2001/08113 : CIA-RDP78TO5694A000300010003-2 WARNING This material contains information affecting the National Defense of the United States within the meaning of the espionage laws, Title 18, USC, Sees. 793 and "794, the trans- mission or revelation of which in any manner to an unauthorized person is prohibited by law. Approved For Release 2001/08/13: CIA-RDP78TO5694A000300010003-2 Approved For Release 2001QM.FSDP78T05694A000300010003-2 NOFORN CONTINUED CONTROL p+~OLL ENGINEERING WJ: S HAI~dOHAI CHINA This report presents the results of photo analysis of the area known as Wollar Engineering Works, Shanghai, China (31?16'N-121?31'E)0 The analysis is based on photography exposed on and 25X1D therefore reflects only the status of the plant as of that date there were few indications at that time of any of the subsequently reported construction of plant facilities. The Mollar Engineering works is located on the East Bank of the ,laangppu-Chiang and is bounded on the North by Hsikou Creek. The plant area is approximately 900 yds long and 100 yds in width, and is enclosed on the river and creek bank sides by a concrete flood wall. For additiora1 detail see map, Annex 1 to this report. Buildings In the plant area are shown on the attached map and their purpose and sizes are as follows: 1 Boiler maker (Plate) shop 2 Machine Shop 3 Foundry 4 Forge 190' S 85, 5 Carpenter Shop 190, X 85 t Loft House (Reported used for Barracks) 150f X 751 7 Steam Boiler House 150' X 551 NOFOIN CONT.rNuEn CON` ROL Approved For Release 2001/08/13 : CIA-RDP78TO5694A000300010003-2 Approved For Release 2001/08/1'3- CONTINUED CONTROL Bl No a Purpose Size 8 Pattern Shop 9 Hospital and Managers Residence 3.351 X 55a 10 Power House (3 Diesel Generators) 959 X 65t U Electric Shop 1301 x 551 12 Main Office 3301 X 951 13 Stores 25X1 D 1Z Union Office 3.001 X SO 3.5 Soldiers Quarters and mess 16 Workers mess 150r x 85$ 17 Engine Test Shed 8O1 X 70V 18 Pontoon Bridges and Wharf 95o w x 4o# 19 unidentified single story btdg, 1.009 g 55a 20 Two Marine Railways Functional designations of the various buildings as set forth above are taken from CIA document No. D-12885-7 Since source had been an official of the Mollar firm and further., since photo analysis confirms a portion of these designations, it is assumed that they may be accepted as accurate, N0FOR F CONTI1 D CONTROL Approved For Release 2001/08/13 : JIA-RDP78TO5694A000300010003-2 Approved For Release 2001/08/13 : CIA-RDP78TO5694A000300010003-2 Approved For Release 2001/08/13 CIA-RDP?78TO5694A000300010003-2 -E .T NOFORN CONTINUED CONTROL ~pNF1DENTiA1- NOFORN CONTINUED CONTROL ApprovedFor Release 2001/08/13 : CIA-RDP78T05694A000300010003-2