RAILROAD CONSTRUCTION ACTIVITY NORTH VIETNAM
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T05161A000600010066-1
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
14
Document Creation Date:
December 28, 2016
Document Release Date:
November 7, 2003
Sequence Number:
66
Case Number:
Publication Date:
February 1, 1966
Content Type:
IR
File:
Attachment | Size |
---|---|
![]() | 5.5 MB |
Body:
Approved For ReleaselOr/Otr
0010066-1
PC-00'0g&PIN
RA[I
hkrE_,O?Rfra REPCD,127
20AD CONS7.2113C700.`r\. ACTllVil
HORTH V11E-RIAM
AGERY
ALYS1S
ilyISION
Declass Review by
NIMA/DOD
crjidowngrod nq d decless,
Excluded Fele oLtomut c SECREI
GROteG 1
Approved For Release 2004/05/05 CIA-RDP78T05161A00068:4113P6-1 I ?
CIA/P
65087
25
25
UAit rt.15. 111100
25X1 Approved For Release 2004/05/05 : CIA-RDP78T05161A000600010066-1
Approved For Release 2004/05/05 : CIA-RDP78T05161A000600010066-1
RECORD ICOPY NO.
COPY
PUB. DATE
LOCATION
MASTER
DATE RECEIVED
LOCATION
D I WAI;blAIDNA-Welease
2004/05/05 :61
TX:RDP78TO
MINIMUM
161A0006b0010066-
MAXIMUM 8
CUT TO 0
COPIES
DATE 7/72
CUT TO
COPIES
DATE
COPIES DESTROYED
CUT TO
COPIES
DATE
CUT TO
COPIES
DATE
CUT TO
COPIES
DATE
MASTER
DATE
DATE
RECEIVED OR ISSUEDRECEIVED
NUMBER OF COPIES
DATE
OR ISSUED
NUMBER OF COPIES
RECD
ISS'D
BAL
REC'B
ISS'D
BAL
MO.
DAY
YR.
MO.
BAY
YR.
9
4
68
Dist. Unit #12, 92-98
8
8
S'
J
la
9P- 9c
9
w
H
..,._.?--4i.14:5
Anoroved br Release
2004/05/05
:
CIA
RDP78T051C1A000C000100GC-1
Approved For Release 2004/W0fittRle1-Fli1705161A000600010166-1
Ko-chiu
FIR - 65037
1,1GURE I
NA
Ching.hsi
RAILROAD CONSTRUCTION ACTIVITY
NORTH VIETNAM
Tuyen
Quang
CHINA
fi
U.
hong
Saly
/ I
I \
1 \
1 I \
I . I
// )
1 Samneu /
1 LAOS /
1 /
\ /
) //
/ /
,-
/
Luang Prabang /
/
on Gal
Thanh Hoa
Xieng
Khouang
/ Vang
Vieng
Hong Khai
HAILAND
Won Thani
Muang
Nakhon Phanom ?
Dong Hoi
hammo
NORTI-I VIETNAM
-+? Railroad
Road
Muang
Ron Norton
Sepon
Vmh Linh
DEMARCATION LINE
Gong Ha
Quang To
Savannakh
SOUT
VI
uong Hong"
Track or tral
50
75 Miles
75 Kiiometers
51330 4-65
aravane
AND 3017N0+.9.?
NC, NEC II,
Approved For Release 2004/05/05 : CIA-RDP78T05161A000600010066-1
@?
25
25
25
Approvec
For Release 20Thip/Atil - 1A000
CIA IMAGERY ANALYSIS DWISION
RAILROAD CONSTRUCTION ACTIVITY
NORTH VIETNAM
600010066-1
rig - 0,00(
Recent photography reveals new North Vietnamese railroad construction
between the Thai-nguyen (21 "AN - 105 52E) and Kep (21 24N - 106 17E)
areas.
A roadbed in the very early stages of construction, extends from
the existing rail line between the Thai-nguyen Iron and Steel Combine
and the Thai-nguyen Iron Ore Processing Plant
at 21 31N - 105 56E southeastward for 22 nm to a point one nm
N. W. of the Hanoi/Dong-Dang Rail Line at 21 25N - 106 17E. This
railroad when completed will provide a more direct route between China
and the Thai Nguyen Iron-Steel Combine thereby tying the economies of
the two countries more closely together.
The roadbed is being constructed on level terrain in the transition
zone between the cultivated riceland area to the south and the wooded
hills area to the north. The railroad will have gentle curves and light
gradients when completed.
Two new rail yards are under construction just north of the existing
Kep Rail Yard on the Hanoi/Dong-Dang Rail Line at 21 24N - 106 17E (Figure
A. Yard I (Figure 3) will probably be used az a freight holding
yard. It consists of a through main line and a. completed turning
wye with curvature radadi of 800 feet and 48o feet. Two other
tracks are under construction in the yard and there is space for 5
additional tracks. A probable watering and fueling facility is
under construction in the yard.
B. Yard 2 (Figure 3) will probably be used for classification.
It consists of two completed tracks and 6 tracks under construction.
There is space for approximately 5 additional tracks.
As of construction was not sufficiently advanced
to determine the capacity of either of these yards.
A 30 nm segment of the Hanoi/Dong-Dang Rail Line from Kep northward
to 21 45N - 106 44E was studied. Within this area several curves of the
-1-
Approved For Release iffitoSTARE
3) :
RDP78T05161A000600010066-1
@?
25
25
Approved
1
For Release 20teritckeTRDP78T05161A00060
CIA IMAGERY ANALYSIS DIVISION
)010066-1
rin - 021J0(
existing railroad were being actively re-aligned (Figure 6). This railroad
realignment does not appear to relate to the standard gauge roadbed
construction activity which was discontinued by the North Vietnamese
late in 1961 or early 1962 (Figure 7).
Although the radai of the turning wye in railroad yard No. 1 is
comparable in size to the standard gauge turning wye at Ping-hsiang,
there is no further evidence to indicate that the North Vietnamese
are starting to convert the Hanoi/Dong-Dang Rail Line from meter to
standard gauge. The construction of the two rail yards and straightening
of curves on the Hanoi/Dong-Dang Rail Line appears only to be concerned
with increasing the traffic handling capability of the rail line at this
time.
-2-
Approved For Release 16130SEERE
-RDP78T05161A000600010066-1
25
Approved
1
For Release 20teritckeTRDP78T05161A00060
CIA IMAGERY ANALYSIS DIVISION
)010066-1
rin - 021J0(
existing railroad were being actively re-aligned (Figure 6). This railroad
realignment does not appear to relate to the standard gauge roadbed
construction activity which was discontinued by the North Vietnamese
late in 1961 or early 1962 (Figure 7).
Although the radai of the turning wye in railroad yard No. 1 is
comparable in size to the standard gauge turning wye at Ping-hsiang,
there is no further evidence to indicate that the North Vietnamese
are starting to convert the Hanoi/Dong-Dang Rail Line from meter to
standard gauge. The construction of the two rail yards and straightening
of curves on the Hanoi/Dong-Dang Rail Line appears only to be concerned
with increasing the traffic handling capability of the rail line at this
time.
-2-
Approved For Release 16130SEERE
-RDP78T05161A000600010066-1
25
Approved For R se 200
TOP SECRET
PIR - 65087
FIGURE
URN1NG WYE
ROADBED UNDER CONSTRUCTION
Approved For Release 200418p/REAft1A-RDP 8T05161A00060001006
RAIL LINE REALIGNMENT 2143N 10642E
ABANDONED STANDARD GAUGE ROADBED
Appro
ed For Release 2felti0SEREIFI-RDP78T05161A0006
CIA IMAGERY ANALYSIS DIVISION
REFERENCES
00010066-1
PIR - 650d7
MAPS AND CHARTS
APE Series L509,
(UNCLASSIFIED)
ARS Series L509,
(UNCLASSIFIED)
NF 48-11, Hanoi, Scale 1:250,000, 2nd edition, December 1963
NF 48-12, Mon Cay, Scale 1:250,000, 1st edition, December 1963
REQUIREMENT - C-CI6-83,298
CIA/IAD PROJECT - 30753-6
-3-
Approved For Release 30160.SHRETA-RDP78T05161A000600010066-1
26
25
25
Approved For Release TO/p/OSE TO5161A000600010066-1
Approved For Release IGR/OSECKIT05161A000600010066-1