MILITARY ACTIVITY IN LIEBEROSE, NEUBRANDENBURG, AND MAGDEBURG

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A004900300002-6
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 20, 2016
Document Release Date: 
June 25, 2007
Sequence Number: 
2
Case Number: 
Publication Date: 
July 24, 1954
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A004900300002-6.pdf176.75 KB
Body: 
Approved For Release 2007/06/25: CIA-RDP80-0081 OA004900300002-6 G 1FICATIO NSECRET CONTROL COUNTRY East Germany REPOR TOM itary Activity in Lieberose, Neubrandenbr,afc ldeburg EVALUATION P1 ArF YAWED, DATE OF CONTENT DATE OBTAINED REFERENCES PAGES 2 ENCLOSURES (No._& TYPE) REMARKS DATE PREPARED 20 August 1954 1. At 0500'.on 24 July 1954, 26 trucks with pontoons and engineer equipment were unloaded at the Lieberose railroad station from a train which arrived from the direction of Frankfurt/Oder. Motor vehicles were seen. The column marched owar Camp eberose.I 2. At 1900 on 31 July, 8 T-34/85 tanks 4 x 57-M AT guns, about 25 trucks and 8 boxcar- loads of personnel were entrained, according to an officer, for Eberswalde. 2 3. At 0645 on 3 August, a truck occupied by soldiers wearing black-bordered black epaulets was seen en route toward Panzer Kaserne (2181) in Neubranden- burg for the first time after a prolonged period of interruption. No indications of an unloading were seen at the Neubrandenburg railroad station immediately after the observation of this truck. At about 1300, a column of 15 trucks with pontoons and doldiers wearing black-bordered On August, the northern portion of Panzer Kaserne was fully lighted at dusk, 4. At 1000 on 3 August, a shipment of 8 boxcars and 38 flatcars arrived at the Magdeburg-Brueckfeld railroad station from the direction of Biederitz. Unloading was completed in about 43 minutes. Unloaded material ingludeds 8 new-six-wheel amphibious vehicles of a new type, 22 trucks with TMP- -pontoon sections, 6 trucks with beams and boards, 2 trucks with motor- boats, an4 200 soldiers wearing black-bordered black epaulets. The amphibious vehicles were 5 to 6 meters long, 2.4 meters wide and, without cover, 2 meters high and had a four winged screw, a rhombic-shaped hull and a cover similar to that of a DUKV 353-type vehicle, The detrained unit left for Seeckt Kaserne (5287). Since, on 3 August, the Seeckt Kaserne was occupi by an estimated 1,200 soldiers wearing black-bordered black epaulets, it was assumed that several shipments were detrained in Magdeburg during the preceding night. Prior to the unloading on 3 August, 24 six-wheel vehicles 25X1 of a new type, about 50 trucks with TMP-pontoon sections, special trucks and equipment trucks were observed in the barracks yard at 0900. On 6 August, Approved For Release 2007/06/25: CIA-RDP80-0081 OA004900300002-6 /v/7 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 Approved For Release 2007/06/25: CIA-RDP80-0081 OA004900300002-6 - ;ctfVt /CONTROL area west of the ins Kleiner Anger. Motor installation was fully; 1,600 soldiers wearing) the installation appe were seen entering and leaving the installation,. T. .On 3 August, 15 truce' - 15_' steel pontoons, and 1 crane truck were seen at the engineer!agvIV -$ forage area in Zuckerbusch Kaserne (5268) in Magdeburg. 4 Bridge Regt of the G .pied to capacity by an estimated ed black epaulets. In the evening, the ng practice was carried out in the g-VAIW trunks were cut with two rip saws at ained. Since engineer units of the Fourth Gds Mech Army from., Tlin and of to Lieberose on 25,,,, there on 2 August, it be conducted at this ra ur er 36th Pon Bridge R servations on 2 August, the units of the Gds Mech-Army,' which had been absent since ndenburg on two trains on 2 August. sible that, after 3 August, the bulk of the SFG assembled at its winter quarters. Elements . d to the post as early.as 19.and 20 July. is of the regiment had been detrained i.n utilized as stolid ~or? i aar:, the first t of anew 1 to furnish SECRET/CONTROL the 1st Mech.Div from Doeberitz transferred s of the abovementioned regiment moved that special engineer exercises were to units of the 36th Pon :ground? the shipment whic1~_ involied units of the .7th Gds Mech Div. went to ILLEGIB Comment 1, The information fails' er of the troops. Amphibious-vehicles 353--type vehicles, are reported for ch Kaserne had already previously been equipment, 25X1 25X1 25X1 25X1 25X1 25X1 25X1 f Approved For Release 2007/06/25: CIA-RDP80-0081 OA004900300002-6