Published on CIA FOIA (foia.cia.gov) (https://www.cia.gov/readingroom)


CONTRACT INSPECTION REPORT

Document Type: 
CREST [1]
Collection: 
NGA Records (Formerly NIMA) [2]
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A000700020023-8
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
20
Document Creation Date: 
December 28, 2016
Document Release Date: 
April 1, 2002
Sequence Number: 
23
Case Number: 
Publication Date: 
December 29, 1967
Content Type: 
FORM
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A000700020023-8.pdf [3]803.42 KB
Body: 
App For Release 2002/06/17: CIA-RD Fved P B@4c74FA0 07 K NO G RAC S N T T 1 N CT I ON OP" rP" . 1 L t 25X1 - T0: . DATE 29 Deaf; -ber 1967 INSPECTION REPORT NO. (If final, so state) 10 (rin.&,) ESTIMATED COMPLETION DATE NAME OF CONTRACTOR E) ! R i b 8G as; ev ew y TYPE OF COMMODITY OR SERVICE NIMA/DOD G Develo Bent THE CONTRACTOR IS ON SCHEDULE THE CONT CTOR WILL PROBABLY REMAIN WITHIN ALLOCATED D 10 YES a NO FUNDS YES r] NO IF ANSWER IS "NO" ADVISE REC- OMMENDATION AND/OR ACTION OF SPONSORING OFFICE, ON PER CENT OF WORK COMPLETED - REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF AD- ~ "" DITIONAL FUNDS INVOLVED. J~1 PER CENT OF FUNDS EXPENDED .yo, J'F HAS AN INTERIM REPORT, FINAL REPORT, PROTOTYPE, OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR DUR ING THE PERIOD? ? YES [] NO (If yes, give details on reverse side.) (If HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? YES EJ NO yes indicate item ti , s, quan ty, and cost on reverse side.) INCENTIVES IS THIS AN INCENTIVE CONTRACT D YES Ia No NOTE: IF YES. CHECK TYPE USE REVERSE SIDE FOR COMMENTS. 0 cosT 0 RD PERFORMANCE 0 DELIVERY FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. FEE OVERALL PERFORMANCE OF CONTRACTOR 1. ^ OUTSTANDING 4. ^ ABOVE AVERAGE 7. UNSATISFACTORY 2. EXCELLENT 5. AVERAGE 3, U VERY GOOD 6, U MINIMUM ACCEPTABLE IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR MINIMUM ACCEPTABLE INDICATE REASONS ON REVERSE SIDE. RECOMMENDED ACTION 11 CONTINUE AS PROGRAMMED ^ WITHHOLD PAYMENT PENDING SATISFACTORY PERFORMANCE pq CLOSE OUT ^ OTHER S if ( pec y) IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE. WHERE APPLICABLE. THE FOLLOWING: ITEM RECD DOES NOT ITEM DOES NOT APPLY RECD APPLY PROTOTYPES MANUALS DRAWINGS AND SPECIFICATIONS FINAL REPORT X PRODUCTION AND/OR OTHER ,END ITEMS SPECIAL TOOLING OTHER GOVERNMENT PROPERTY DATE OF LAST CONTACT ITH CONTRACTOR I November 199,7 ,SIGNATURE OF INSPECTOR DIVISION -R I '78B04747A000700020023-8 `FORM USE 12- 67 1897 PREVIOUS EDITION ^ SECRET xJ CONFIDENTIAL 04066- (] UNCLASSIFIED UNCLASSIFIED CONFIDENTIAL [] SECRET (12.36I- [] SECRET Id CONFIDENTIAL U UNCLASSIFIED Approved ff?IsqR?P?@406/17 : CIA-RDP T8BO47 Jn4 7jgOO2OO23-8 ? FINAL on this contract have been received. j ect has been evaluated as follows: A. The contrac' the project performed well on the contract a std niece of research; suits of the research are discouraging because of the ant, have insufficient sensitivity 0 3? discrimination of III increments. They are sensitive only ?12%. (TIC? has to evaluate image quality to .4;PA) system; (3) :II'Ixcessive implemxztation costs ( (2) It is very questionable that high resolution ? EM (2 y/ c a n be made. C u r r e n t G are about llOcy/M. of the above, it was determined not to continue ^ UNCC(SS I F I Eb.,... - ~.,.,~..,.,..13-OIrrTdrNT1 A-L a prototype ^ SECRET ^ SECRET Ap~lgpl? f F17 : CIA-RD CONTRAC 9. 78BO4WAO 000200 S NO. TS=i 25X1 TO: CONTRACT ADMINISTRATION & SET'T'LEMENT INSPECTION REPORT NO. (If final so state) BRANCH/PD/OL , ESTIMATED COMPLETION DATE T4 NAME OF CONTRACTOR 011W Demajapment THE CONTRACTOR IS ON SCHEDULE THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED ^ FUNDS YES ^ NO IF ANSWER IS "NO" ADVISE REC- YES NO OMMENDATION AND/OR ACTION OF SPONSORING OFFICE ON , REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF AD- C PER CENT OF WORK COMPLETED J DITIONAL FUNDS INVOLVED. PER CENT OF FUNDS EXPENDED -? HAS AN INTERIM REPORT. FINAL REPORT. PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR DURING THE PERIOD? M t YES ^ NO (If yes, give details on reverse side.) HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? ^ YES ? NO (If yes, indicate items, quantity, and cost on reverse side.) INCENTIVES IS THIS AN INCENTIVE CONTRACT D YES NO NOTE: IF YES, CHECK TYPE USE REVERSE SIDE FOR COMMENTS. 0 COST 0 AWARD ^ PERFORMANCE 0 DELIVERY FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. FEE OVERALL PERFORMANCE OF CONTRACTOR 1. ^ OUTSTANDING 4. ^ ABOVE AVERAGE 7. ^ UNSATISFACTORY 2. ^ EXCELLENT 5. AVERAGE 3. ^ VERY GOOD 6. ^ MINIMUM ACCEPTABLE IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR MINIMUM ACCEPTABLE INDICATE REASONS ON REVERSE SIDE. RECOMMENDED ACTION CONTINUE AS PROGRAMMED ^ WITHHOLD PAYMENT PENDING SATISFACTORY PERFORMANCE ^ TERMINATE ^ OTHER (Specify) IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE, WHERE APPLICABLE, THE FOLLOWING: ITEM RECD DOES NOT ITEM RE C D DOES NOT APPLY APPLY PROTOTYPES MANUALS DRAWINGS AND SPECIFICATIONS FINAL REPORT PRODUCTION AND/OR OTHER SPECIAL TOOLING END ITEMS OTHER GOVERNMENT PROPERTY DATE OF LAST CONTACT WITH CONTRACTOR Tr 1'i SIGNATURE OF INSPECTOR DIVISION SIGNATURE OF APPROVER 8 -66 1897 EDITIONS ^ UNCLASSIFIED ^'CONFIDENTIAL [] CONFIDENTIAL 0+066 El UNCLASSIFIED ^ SECRET ^ SECRET ^ CONFIDENTIAL Approved For Release 2002/06/17: CIA-RDP78 04747A00 - NARRATIVE REPORT Q INTERIM 4p rid For Release 2002/06/17 : CIA-RDP78B04747A000700020023-8 ^ UNCLASSIFIED" ?01 ^ CONFIDENTIAL ^ UNCLASSIFIED ^ FINAL ^ SECRET ^ SECRET CONFIDENTIAL ^ UNCLASSIFIED CONTRACT NO. TASK NO. A oIfio&%s ff7 : CIA-RD P7 0007.Q0200 23-8 25X1 TO: DATE 23 J=e 1967 CONTRACT ADMINISTRATION & SETTLEMENT INSPECTION REPORT NO. (If final, so state) BRANCH/PD/OL ESTIMATED COMPLETION DATE s x196 NAME OF CONTRACTOR y1t V, THE CONTRACTOR IS ON SCHEDULE THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED FUNDS = YES ^ NO IF ANSWER IS "NO" ADVISE REC- JU YES ^ NO OMMENDATION AND/OR ACTION OF SPONSORING OFFICE, ON REVERSE HEREOF. IF KNOWN, INDICATE MAGNITUDE OF AD- PER CENT OF WORK COMPLETED DITIONAL FUNDS INVOLVED. PER CENT OF FUNDS EXPENDED 6 HAS AN INTERIM REPORT, FINAL REPORT. PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR DURING THE PERIOD? XI YES ^ NO (If yes, give details on reverse side HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? ^ YES NO (If yes, indicate items, quantity, and cost on reverse side.) INCENTIVES IS THIS AN INCENTIVE CONTRACT 0 YES NO NOTE: IF YES, CHECK TYPE USE REVERSE SIDE FOR COMMENTS. AWARD 0 PERFORMANCE 0 DELIVERY ^ COST FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. a FEE OVERALL PERFORMANCE OF CONTRACTOR ^ ABOVE AVERAGE 7. ^ UNSATISFACTORY 1. ^ OUTSTANDING 4. ^ 2. ^ EXCELLENT 5.1M AVERAGE ++RRJJ ^ MINIMUM ACCEPTABLE 3. ^ VERY GOOD 6' IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR MINIMUM ACCEPTABLE INDICATE REASONS ON REVERSE SIDE. RECOMMENDED ACTION CONTINUE AS PROGRAMMED ^ WITHHOLD PAYMENT PENDING SATISFACTORY PERFORMANCE ^ TERMINATE ^ OTHER (Specify) IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE, WHERE APPLICABLE. THE FOLLOWING: ITEM REC?D DOES NOT ITEM REC D DOES NOT APPLY APPLY PROTOTYPES MANUALS DRAWINGS AND SPECIFICATIONS FINAL REPORT PRODUCTION AND/OR OTHER SPECIAL TOOLING END ITEMS OTHER GOVERNMENT PROPERTY DATE OF LAST CONTACT WITH CONTRACTOR dt 196? SIGNATURE OF INSPECTOR DIVISION TDG INSP SIGNATURE OF APPROVER FORM 1897 PREVIDU9 ^ UNCLASSIFIED ] CONFIDENTIAL ^ SECRET (12.36) EDITION ^ SECRET #J CONFIDENTIAL ^ UNCLASSIFIED Approved For Release 2002/06/17 : CIA-R NARRATIVE REPORT eeo TZD, have been finalized b ct the paychop ieal Meta of This testing will be .1 by 17"28 J in TID. INTERIM 0 FINAL idity. 25 1 25 1 during the period Approved For Release 2002/06/17 : CIA-RDP78BO4747A000700020023-8 depleted s. conceptual design of a delivered. P78B04747A000700020023-8 ^ UNCLASSIFIED'' ICO CONFIDENTIAL ^ SECRET ^ SECRET ? CONFIDENTIAL ^ UNCLASSIFIED CONTRACT NO. 0 W ~ TftsgZ?pRJ06/17 : CI? -RDP78BO A000700 2 3-8 F I 2 TO: DATE CONTRACT ADMINISTRATION & SETTLEMENT INSPEC ION EPORT N15. (If final, so state) ERANCH/PD/OL ESTIMA DCOMPLETION DATE 30 Sa t-499a = 3 %!Z p . - NAME OF CONTRACTOR TYPE OF COMMODITY OR SERVICE G el t THE CONTRACTOR IS ON SCHEDULE THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED FUNDS / $YES ? NO IF ANSWER IS "NO" ADVISE REC- Yes [j NO OMMENDAT MN AND/OR ACTION OF SPONSORING OFFICE. ON ? REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF AD- PER CENT OF WORK COMPLETED - DITIONAL FUNDS INVOLVED. PER CENT OF FUNDS EXPENDED - HAS AN INTERIM REPORT, FINAL REPORT. PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR DURING THE PERIOD? ^ YES Ej NO (If yes, give details on reverse side.) ~~~111 HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? ^ YES NO (If yes, indicate items, quantity, and cost on reverse side.) INCENTIVES IS THIS AN INCENTIVE CONTRACT 0 YES NO NOTE: IF YES. CHECK TYPE USE REVERSE SIDE FOR COMMENTS. 0 COST 0 AWARD PERFORMANCE [] DELIVERY FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. FEE OVERALL PERFORMANCE OF CONTRACTOR 1. ^ OUTSTANDING 4. ^ ABOVE AVERAGE 7. ^ UNSATISFACTORY 2. ^ EXCELLENT S. AVERAGE 3, ^ VERY GOOD 6, ^ MINIMUM ACCEPTABLE IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR MINIMUM ACCEPTABLE INDICATE REASONS ON REVERSE SIDE. RECOMMENDED ACTION ~~ ~..,.,.~ CONTINUE AS PROGRAMMED ^ WITHHOLD PAYMENT PENDING SATISFACTORY PERFORMANCE ^ TERMINATE ^ OTHER (Specify) IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE. WHERE APPLICABLE, THE FOLLOWING: ITEM RECD DOES NOT ITEM RECD DOES NOT APPLY APPLY PROTOTYPES MANUALS DRAWINGS AND SPECIFICATIONS FINAL REPORT PRODUCTION AND/OR OTHER SPECIAL TOOLING END ITEMS OTHER GOVERNMENT PROPERTY DATE OF LAST CONTACT WITH CONTRACTOR SIGNATURE OF INSPECTOR DIVISION rpw INSPE SIGNATURE OF APPROVER FUHM 8.66 1897 PREVIOUS ^ UNCLASSIFIED EDITION ? CONFIDENTIAL ^ SECRET xi ^ SECRET ^ CONFIDENTIAL Approved For Release 2002/0/17 : CIA-Rb +cishnts dries this 0 UNCLASSIFIED P78B04747A000700020023-8 ^ INTERIM ^ FINAL part.od ineiuddd: 25 d city and adg* grrdikant measuriammts Purpose of da in: the txrevatio ` I?:tr t, & 14.T.F.); lack at the design of 4 psi , IS Vlevers Approved For Release 2002/06/17 : CIA-RDP78BO4747A000700020023-8 ^ UNCLASSIFIED DCONFIDENTIAL ^ SECRET xi ^ SECRET CONFIDENTIAL ^ UNCLASSIFIED 1 1 CONTRACT NO. TASK NO. C c~ E ~It fp6/17 : CIA RDP78BO4747 0700 20023-8 2 TO: DATE 27 fttir"41 1%7 CONTRACT ADMINISTRATION & SETTLEMENT INSPECTION REPORT NO. (If final, so state) BRANCH/PD/OL ESTIMATED COMPLETION DATE 0 wye;R,e NAME OF CONTRACTOR 3 1 F__ TYPE OF COMMODITY OR SERVICE G&-,S 1)9valopment THE CONTRACTOR IS ON SCHEDULE THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED n_YES 0 NO IF ANSWER IS "NO" ADVISE REC- FUNDS ^ YES NO g OMMENDATTON AND/OR ACTION OF SPONSORING OFFICE, ON REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF AD- PER CENT OF WORK COMPLETED - ~-^ _ DITIONAL FUNDS INVOLVED. PER CENT OF FUNDS EXPENDED - new AN INTERIM REPORT, FINAL REPORT, PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR DURING THE PERIOD? [] YES Q NO (If yes, give details on reverse side.) HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? ^ YES NO (If yes, indicate items, quantity, and cost on reverse s"ide.) INCENTIVES IS THIS AN INCENTIVE CONTRACT 0 YES No NOTE: IF YES. CHECK TYPE USE REVERSE SIDE FOR COMMENTS. []COST O AWARD ^ PERFORMANCE ^ DELIVERY FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. FEE OVERALL PERFORMANCE OF CONTRACTOR 1 ^ OUTSTANDING 4. ^ ABOVE AVERAGE 7. CJ UNSATISFACTORY 2. ^ EXCELLENT 5. AVERAGE 3. ^ VERY GOOD 6. MINIMUM ACCEPTABLE IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR MINIMUM ACCEPTABLE INDICATE REASONS ON REVERSE SIDE. RECOMMENDED ACTION CONTINUE AS PROGRAMMED El WITHHOLD PAYMENT PENDING SATISFACTORY PERFORMANCE ^ TERMINATE - ^ OTHER (Specify) IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE. WHERE APPLICABLE. THE FOLLOWING: ITEM RECD DOES NOT ITEM REC'D DOES NOT APPLY APPLY PROTOTYPES MANUALS DRAWINGS AND SPECIFICATIONS FINAL REPORT PRODUCTION AND/OR OTHER SPECIAL TOOLING END ITEMS OTHER GOVERNMENT PROPERTY DATE OF LAST CONTACT WITH CONTRACTOR 1967 SIGNATURE OF INSPEC OR DIVISION iii 1l jjjjIj ji SIG NATURE OF APPROVER 2,91 l d For R ove ease 2002,68, it 1 e F_ I %j FOR 8.66 1897 PREVIOUS U NCLASSIFIED CONFIDENTIAL SECRET (12.36) EDITION X1 ^ SECRET EJ CONFIDENTIAL ^ UNCLASSIFIED Approved For Release 2002/06/17 : CIA-RE NARRATIVE REPORT to this Contract IUD C,O,S, an anted to a re- it ti ov-_mow the tc chntcal probl a ntered during D P78B04747A000700020023-8 ^ INTERIM ^ FINAL C.O.S. ae tielly redirects the efftrt toward more theoretical studs off' printed G" and *ww--l+ the p tion of a, lame matrix of prir ted MtN'A. It Also directs a wore i t sivcr std of pseuft-GIM b= ca..zao the r au1ts the initial pilot study of pset. - ; were quite z rLei x and trdt- eated that re r~ffbrt was Justified, TWI, Chang c 1etio to 30 at r 67. thr: r_ th extension for projjt-ct Approved For Release 2002/06/17 : CIA-RDP78BO4747A000700020023-8 ^ UNCLASSIFIED ] CONFIDENTIAL ^ SECRET ^ SECRET CONFIDENTIAL ^ UNCLASSIFIED Approved ase 2002/06/17: CIA f47~p0700 2028 CONTRACT INSPECTION REPORT 2 TO: DATE 1 91% 1 Moeanbev CONTRACT ADMINISTRATION & SETTLEMENT - - TION REPORT NO. (If final, so state) INSPE - BRANCH/PD/OL ESTI ATED COMPLETION DATE igm OT 31 b - - NAM TYPE OF COMMODITY OR SERVICE 0 . .O Iik~II11: THE CONTRACTOR IS ON SCHEDULE THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED FUNDS M YES ^ NO IF ANSWER IS "NO" ADVISE REC- ^ YES No OMMENDATION AND/OR ACTION OF SPONSORING OFFICE, ON REVERSE HEREOF. IF KNOWN, INDICATE MAGNITUDE OF AD- PER CENT OF WORK COMPLETED 611% DITIONAL FUNDS INVOLVED. PER CENT OF FUNDS EXPENDED HAS AN INTERIM REPORT, FINAL REPORT. PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR DURING THE PERIOD? 1:1 YES NO (If yes, give details on reverse side.) HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? ^ YES ND (If yes, indicate Items, quantity, and cost on reverse side.) INCENTIVES IS THIS AN INCENTIVE CONTRACT 0 YES No NOTE: IF YES, CHECK TYPE USE REVERSE SIDE FOR COMMENTS. ^ COST 0 AWARD ^ PERFORMANCE ^ DELIVERY FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. FEE OVERALL PERFORMANCE OF CONTRACTOR 1. 13 OUTSTANDING 4. 1:1 ABOVE AVERAGE 7. ^ UNSATISFACTORY 2. ^ EXCELLENT 5. AVERAGE 3. 1:1 VERY GOOD 6. ^ MINIMUM ACCEPTABLE IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR MINIMUM ACCEPTABLE INDICATE REASONS ON REVERSE SIDE. RECOMMENDED ACTION ? CONTINUE AS PROGRAMMED - ^ WITHHOLD PAYMENT PENDING STISFACTORY PERFORMANCE ^ TERMINATE ^ OTHER (Specify) IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE, WHERE APPLICABLE, THE FOLLOWING: ITEM RECD DOES NOT, ITEM REC'D DOES NOT APPLY APPLY PROTOTYPES MANUALS DRAWINGS AND SPECIFICATIONS FINAL REPORT PRODUCTION AND/OR OTHER SPECIAL TOOLING END ITEMS OTHER GOVERNMENT PROPERTY DATE OF LAST CONTACT WITH CONTRACTOR 14 December 19" SIGNATURE OF INSPECTOR DIVISION y IN SIGNATURE OF APPROVER Apprnvpd Release 2002/06/17 CIA RDP78B04747A000700020023-8 FORM 1897 PREVIOUS ^ UNCLASSIFIED 70 CONFIDENTIAL ^ SECRET 112.36) EDITION 1 ^ SECRET Q CONFIDENTIAL ^ UNCLASSIFIED Approv%O r-I 2/06/17 :CIA-R 'P P78BOjffj7ft4P700020023-U F I NAL More has been a delay on this a=tract due to the tact that the Me of the various generated for testing failed to show sufficient spread bet ter the MM. Therefore the P.I. ranking of the for their respect ve imW qualities could not be objectively e*upwe4 to the calculated MM. This p o aical test phase therefore is postponed until ceen supply " ter aHM with larger spacing increments of MTP. 25K1 ^ UNCLASSIFIED . wv U ? rin-Rnp~s;Rnd~~,7A00n7nnninniz_Q i CONFIDENTIAL ^ SECRET T ^ SECRE C-] UNCLASSIFIED A pproved ,pr F iiease 2002/06/17: CI 2123-8 RI 7 4747Al~p0700 CONTRACT INSPECTION REPORT TO: DATE i CONTRACT ADMINISTRATION & SETTLEMENT INSPECTION REPORT NO. (If final, so state) BRANCH/PD/OL ESTIMATED''COMPLETION DATE 30 J=* 1967 NAME OF CONTRACTOR - - - - - TYPE OF CO one Rmuww" THE CONTRACTOR IS ON SCHEDULE THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED FUNDS ? YES 0 NO IF ANSWER IS "NO" ADVISE REC- ? YES El NO OMMENDATION AND/OR ACTION OF SPONSORING OFFICE. ON REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF AD- PER CENT OF WORK COMPLETED - DITIONAL FUNDS INVOLVED. PER CENT OF FUNDS EXPENDED - HAS AN INTERIM REPORT, FINAL REPORT. PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR DURING THE PERIOD? IV YES [] NO (If yes, give details on reverse side.) HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? ^ YES ? NO (If yes, indicate items, quantity, and cost on reverse side.) INCENTIVES IS THIS AN INCENTIVE CONTRACT 0 YES NO NOTE: IF YES, CHECK TYPE USE REVERSE SIDE FOR COMMENTS. RD 0 PERFORMANCE 0 DELIVERY A ^ COST 0 FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. A WA OVERALL PERFORMANCE OF CONTRACTOR 1. ^ OUTSTANDING 4. ABOVE AVERAGE 7. 1:1 UNSATISFACTORY 2. ^ EXCELLENT S. ^ AVERAGE 3. ^ VERY GOOD 6, ^ MINIMUM ACCEPTABLE IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR MINIMUM ACCEPTABLE INDICATE REASONS ON REVERSE SIDE. RECOMMENDED ACTION CONTINUE AS PROGRAMMED El WITHHOLD PAYMENT PENDING SATISFACTORY PERFORMANCE El OTHER (Specify) ^ TE RMINATE IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE, WHERE APPLICABLE, THE FOLLOWING: ITEM RECD DOES NOT ITEM RECD DOES NOT APPLY APPLY PROTOTYPES MANUALS DRAWINGS AND SPECIFICATIONS FINAL REPORT PRODUCTION AND/OR OTHER SPECIAL TOOLING END ITEMS OTHER GOVERNMENT PROPERTY - DATE OF LAST CONTACT WITH CONTRACTOR Octob- , 1', & SIGNATURE OF INSPECTOR DIVISION PAW 25 Approved For Release 2002/06/17 : CIA-RDP78BO4747A000700020023-8 40 M FO USE ^ SECRET 8.66 1897 P E D R I E T VIOLS CONFIDENTIAL I O N [] UNCLASSIFIED CONFIDENTIAL ^ SECRET 9 CONFIDENTIAL ^ UNC LASS I F I ED Approv" - V~ aR?2/06/17: CIA-REp P78BOgf f f q 70002OO23- A "e -scope w . vas ted an 19 October 1966 Mesa at This is for an additional lab- tembeer 3.966 a final refit on. Task 03 received. This rem is outlier and Yabrieatiou of the O $ assestia1 a design of and a proposal Pro m We prat r for use in elevating ty of operational waterial by wing it OEM. We proposal is being held value of can be establis 1. til Tasks 01 and #2 and the "Pseudo. as4 avalust4ed< e) hsve been conpieted ^ UNCLASS I'F IED = 'y ^ CONF IDENT IAL ^ SECRET ^ SECRET O'CONFIDENTIAL , n UNCLASSIFIED ' A 0. TASK NO. CONTRACT INSPECTION REPORT 7 7 25 TO : DATE mot, CONTRACT ADMINISTRATION & SETTLEMENT INSPECTION REPORT NO. (If final, so state) BRANCH/PD/OL 3 TED COMPLETION DATE ' Yf+oia'! 96 I: NAME OF CONTRACTOR TYPE OF COMMODITY OR SERVICE vVLo, % . GM THE CONTRACTOR IS ON SCHEDULE THE CONTRP~CTOR WILL PROBABLY REMAIN WITHIN ALLOCATED ^ Y ? FUNDS QS.YES ^ No IF ANSWER IS "NO" ADVISE REC- ES N o OMMENDATION AND/OR ACTION OF SPONSORING OFFICE ON , REVERSE HEREOF. IF KNOWN, INDICATE MAGNITUDE OF AD- PER CENT OF WORK COMPLETED DITIONAL FUNDS INVOLVED. PER CENT OF FUNDS EXPENDED 3 HAS AN INTERIM REPORT, FINAL REPORT, PROTOTYPE, OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR DURING THE PERIOD? 1:1 YES NO (If yes, give details on reverse side.) HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? YES ^ NO (If yes, indicate items, quantity, and cost on reverse side.) INCENTIVES' IS THIS AN INCENTIVE CONTRACT Dyes NO NOTE: IF YES, CHECK TYPE USE REVERSE SIDE FOR COMMENTS. ^ cosT ^ PERFORMANCE ^ DELIVERY FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. OVERALL PERFORMANCE OF CONTRACTOR 1. El OUTSTANDING 3. ? ABOVE AVERAGE S. ^ BELOW AVERAGE 7. ^ UNSATISFACTORY 2. ^ EXCELLENT 4. 1:1 AVERAGE 6. ^ BARELY ADEQUATE IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE. INDICATE REASONS ON REVERSE SIDE. RECOMMENDED ACTION `'~ U CONTINUE AS PROGRAMMED ^- WITHHOLD PAYMENT PENDING SATISFACTORY PERFORMANCE 1:1 TERMINATE - ^ OTHER (Specify) IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE, WHERE APPLICABLE. THE FOLLOWING: ITEM RECD DOES NOT ITEM RECD DOES NOT APPLY APPLY PROTOTYPES MANUALS DRAWINGS AND SPECIFICATIONS FINAL REPORT PRODUCTION AND/OR OTHER SPECIAL TOOLING END ITEMS OTHER GOVERNMENT PROPERTY DATE OF LAST CONTACT WITH CONTRACTOR SIGNATU INSPECT Approved For Release 2002/06/17 : CIA-RDP78BO4747A000700020023-8 FORM EDITION xi ^SECRET LEI CONFIDENTIAL Approve ReleggpOJ992/06/17: CIA ^ UNCLASSIFIED 29 xi Approved For Release 2002/06/17 : CIA-RDP78BO4747A000700020023-8 ^ UNCLASSIFIED [3 CONFIDENTIAL ^ SECRET ^ SECRET CONFIDENTIAL UNCLASSIFIED 1 6;: 7 An CONTRACT NO. 902- TASK NO. CONTRACT INSPECTION REPORT s 211 TO: DATE 16 June 1966 CONTRACT ADMINISTRATION & SETTLEMENT INSPECTION REPORT NO. (If final, so state) BRANCH/PD/OL ESTIMATED COMPLETION DATE June x=67 NAME OF CONTRACTOR TYPE OF tl.~ Development THE CONTRACTOR IS ON SCHEDULE THE CON ACTOR WILL PROBABLY REMAIN WIHIN ALLOCATED T ^ YE FUNDS YES ^ NO IF ANSWER IS "NO" ADVISE REC- S N. OMMENDATION AND/OR ACTION OF SPONSORING OFFICE, ON REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF AD- PER CENT OF WORK COMPLETED - - DITIONAL FUNDS INVOLVED. * PER CENT OF FUNDS EXPENDED - 2' as of 29 --tpr. 66 HAS AN INTERIM REPORT, FINAL REPORT, PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR DURING THE PERIOD? ^ YES 13 NO (If yes, give details on reverse side.) HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? ^ YES FK] NO (If yes, indicate items, quantity, and cost on reverse side.) INCENTIVES' IS THIS AN INCENTIVE CONTRACT 0 YES Ig NO NOTE: IF YES, CHECK TYPE USE REVERSE SIDE FOR COMMENTS. ^ COST ^ PERFORMANCE DELIVERY FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. OVERALL PERFORMANCE OF CONTRACTOR 1 ^ OUTSTANDING 3. ABOVE AVERAGE 5. ^ BELOW AVERAGE 7. ^ UNSATISFACTORY 2. ^ EXCELLENT 4. ^' AVERAGE 6. ^ BARELY ADEQUATE IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE, INDICATE REASONS ON REVERSE SIDE. RECOMMENDED ACTION ? CONTINUE AS PROGRAMMED ^ WITHHOLD PAYMENT PENDING SATISFACTORY PERFORMANCE ^ TERMINATE ^ OTHER (Specify) IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE, WHERE APPLICABLE, THE FOLLOWING: ITEM REC'D DOES NOT ITEM REC'D DOES NOT APPLY APPLY PROTOTYPES MANUALS DRAWINGS AND SPECIFICATIONS FINAL REPORT PRODUCTION AND/OR OTHER SPECIAL TOOLING END ITEMS OTHER GOVERNMENT PROPERTY DATE OF LAST CONTACT WITH CONTRACTOR 44 May 1%-,6 SIGNATURE OF INSPECTOR DIVISION 2 INSP Approved For Release 2002/06/17 : CIA-RDP78BO4747A000700020023-8 FORM 10-65 1897 : ~Ev ors ^ UNCLASSIFIED , CONFIDENTIAL SECRET xi xi ^ SECRET ? CONFIDENTIAL ^ UNCLASSIFIED Appro c gff Ieep&9A2/06/17: CIA-~ DP78BQ?71j7 01Q0700020023 ;8, UU UU FINAL Contractor is slightly behind the original work schedule; however, this Interirm slime does not as yet endanger the U. completion of the total grogr n,. Approved For Release 2002/06/17 : CIA-RDP78BO4747AO00700020023-8 ^ UNCLASSIFIED Q CONFIDENTIAL f`"o"`l ^ SECRET ^ SECRET CONTRACT NO. TASK NO. CONTRACT INSPECTION REPfRT I E= 8 2 TO: DATE 8 AM-11 3,q66 CONTRACT ADMINISTRATION & SETTLEMENT INSPECTION REPORT NO. (If final, so state) BRANCH/PD/OL 1 ESTIMATED COMPLETION DATE V u'.Ie. 1967 NAME OF CONTRACTOR TYPE OF COMMODITY OR SERVICE 4 i 4TLr l~r d,~.b .. .fy THE CONTRACTOR IS ON SCHEDULE THE CONT CTOR WILL PROBABLY REMAIN WITHIN ALLOCATED FUNDS YES ^ NO IF ANSWER IS "NO" ADVISE REC- YES ^ No OMMENDATION AND/OR ACTION OF SPONSORING OFFICE, ON REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF AD- PER CENT OF WORK COMPLETED ? DITIONAL FUNDS INVOLVED. PER CENT OF FUNDS EXPENDED - z4 HAS AN INTERIM REPORT, FINAL REPORT. PROTOTYPE, OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR DURING THE PERIOD? ^ YES M NO (If yes, give details on reverse side.) HAS GOVERNMENT-OWNED PROPERT Y BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? ^ YES ? NO (If yes, indicate items, quantity , and cost on reverse side.) INCENTIVES' IS THIS AN INCENTIVE CONTRACT D YES ? NO NOTE; IF YES, CHECK TYPE USE REVERSE SIDE FOR COMMENTS. 0 cost O PERFORMANCE 0 DELIVERY FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. OVERALL PERFORMANCE OF CONTRACTOR 1 ^ OUTSTANDING 3. ? ABOVE AVERAGE 5. ^ BELOW AVERAGE 7. ^ UNSATISFACTORY 2. ^ EXCELLENT 4. ^' AVERAGE 6. ^ BARELY ADEQUATE IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE, INDICATE REASONS ON REVERSE SIDE. RECOMMENDED ACTION E CONTINUE AS PROGRAMMED ^ WITHHOLD PAYMENT PENDING SATISFACTORY PERFORMANCE ^ TERMINATE ^ OTHER (Specify) IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE, WHERE APPLICABLE. THE FOLLOWING: DOES NOT DOES NOT ITEM RECD APPLY ITEM RECD APPLY PROTOTYPES MANUALS DRAWINGS AND SPECIFICATIONS FINAL REPORT PRODUCTION AND/OR OTHER SPECIAL TOOLING END ITEMS OTHER GOVERNMENT PROPERTY DATE OF LAST CONTACT WITH CONTRACTOR 29 Ii L T.

Source URL: https://www.cia.gov/readingroom/document/cia-rdp78b04747a000700020023-8

Links
[1] https://www.cia.gov/readingroom/document-type/crest
[2] https://www.cia.gov/readingroom/collection/nga-records-formerly-nima
[3] https://www.cia.gov/readingroom/docs/CIA-RDP78B04747A000700020023-8.pdf