PROCESSING WEEKLY REPORT
FOR WEEK ENDING 9 DECEMBER 1981
of the Defense
Intelligence Agency were at the SAFE Center on Tuesday and
Wednesday, 1 - 2 December, for a introduction and
orientation on the Burroughs B6900 and its operating system.
Additional visits are planned as further hardware and
software development progresses.
There were many Ruffing Center problems this week. On
Wednesday, user software errors stopped OCROLDE3 and ISGOLDE
for 105 minutes and RECON for 73 minutes. Errors from a
Telex paging pack halted all of OCR for 25 minutes
Wednesday. Thursday, OCR was stopped for 65 minutes due to
hardware problems with the Amdahl 470/V8 computer. Friday,
OCR lost 159 minutes due to an operations error,an IBM disk
controller failure, and a failure in the 415 Hz
uninterruptible power supply. JES and Batch each lost about
2-1/2 hours, Friday, due to the controller and power
problems that day. Numerous other outages occurred.
Problems with the IBM NSA/B controllers caused intermittent
interruptions to the VM and Batch systems during the week.
The Special Center also had a substandard week, although
there were a small average number of lost time incidents.
DDOVMP lost over two hours, Thursday, due to an apparent
hardware failure in an IBM 370/158 computer. On Saturday,
TPSTAR lost nearly four hours due to IBM tape drive and
Telex disk drive hardware problems. On Monday, TPSTAR lost
nearly three hours more due to Telex drive roblems, and
TPNIPS lost 60 minutes for the same reason. II
The IBM 3081 was successfully IPL'ed with MVS/SP on 7
December. Production use of the machine is anticipated by
mid-January.
MPS - Availability guidelines for the system have been
established and coordinated with Processing, CDS, and DATEX.
0
25X1
25X1
Approved For Release 2003/11/06 : CIA-RDP84-00933R000400210020-5
Approved For?Release 2003/11/06 : CIA-RDP84-009300400210020-5
PAGE 2
IBM will complete checkout of the IBM 3081 Processor
and new IBM 3380 DASD. SPD/BSB will begin testing the
system as an MVS/JES3 standalone Global (SY5) on Wedensday,
9 December.
CAMS - Continuation of the memory upgrade for the
AMDAHL V6 is scheduled for 12 December 0001 to 13 December
1800. CAMS will be on the backup CPU.
SYSTEMS AVAILABILITY SUMMARY
MONDAY 30 NOV 1981 THRU SUNDAY 06 DEC 1981
SYSTEM
CURRENT WEEK
30 NOV - 06 DEC
PREVIOUS 90 DAYS
29 AUG - 29 NOV DIFFERENCE
BATCH
98.35
98.02 +
.33
INTERACTIVE
97.98
98.64 -
.66
GIMS
95.34
96.32 -
.98
CAMS
99.81
97.84 +
1.97
OCR-COLTS
87.04
95.06 -
8.02
OCR-RECON
87.44
94.25 -
6.81
DDO-STAR
95.81
97.33 -
1.52
OSWR-TADS
99.70
98.59 +
1.11
GIMS, OCR-COLTS, OCR-RECON, and DDO-STAR all reported
below the goal of 96 percent for the week with each application
recording outages due to hardware, software, procedural, and
UPS power problems.
- GIMS experienced a 1 hour and 7 minute UPS power outage, 38
minutes of hardware problems, and a 35 minute procedural error.
- OCR-COLTS had 2 hours and 50 minutes of hardware problems, 1
hour and 52 minutes of procedural errors, a 1 hour and 22
minute UPS power outage, and 25 minutes of software errors.
25X1
Approved For Release 2003/11/06 : CIA-RDP84-00933R000400210020-5
Approved FoeIease 2003/11/06 : CIA-RDP84-0093 000400210020-5
- OCR-RECON experienced 2 hours and 40 minutes of hardware
problems, 2 hours and 23 minutes of software errors, a 1
hour and 22 minute UPS power outage, and a .52 minute procedural
problem.
- DDO-STAR had 3 hours and 54 minutes of hardware problems.