Published on CIA FOIA (foia.cia.gov) (https://www.cia.gov/readingroom)


DEFENSE INSTALLATIONS NEAR THE HUNGARIAN-YUGOSLAV BORDER

Document Type: 
CREST [1]
Collection: 
General CIA Records [2]
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP83-00418R000900130002-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
5
Document Creation Date: 
December 27, 2016
Document Release Date: 
July 12, 2013
Sequence Number: 
2
Case Number: 
Publication Date: 
August 18, 1955
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP83-00418R000900130002-2.pdf [3]180.81 KB
Body: 
Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/12 : CIA-RDP83-00418R000900130002-2 CENTRAL INTELLIGENCE AGENCY INFORMATION REPORT S-E-C-R-E-T This material contains information affecting the Na- tional Defense of the United States within the mean- ing of the Espionage Laws, Title 18, U.S.C. Secs. 793 and 794, the transmission or revelation of which in any manner to an unauthorized person is prohibited by law. 50X1 COUNTRY Hungary REPORT NO. 50X1 SUBJECT ? Defense Installations near the DATE DISTR. IS August 1955 Hungarian-Yugoslav Border 50X1 NO. OF PAGES 1 DATE OF INFO. REQUIREMENT NO. RD PLACE ACQUIRED REFERENCES THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE, THE APPRAISAL OF CONTENT IS TENTATIVE. (FOR KEY SEE REVERSE) Sc 50X1 A reports concerning defense installations near the village of liolnsiri at the 50X1 Yugoslav-Hungarian borders is available S TATE Distribution of Attachment (i4 pages) 50X1 50X1 ARMY X t NAVY AIR NOTE, Iv' 1,;noton distribution indicated by "X": Field distribution by "#".1 50X1 F B I A c 1 Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/12 : CIA-RDP83-00418R000900130002-2 4 Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/12 : CIA-RDP83-00418R000900130002-2 MM77",t 50X1 50X1 EC RE 50X1 50X1 2. HUNGARIAN GROUND FORCES a. Defense Installations Pep 53 - Semipermanent Fortifications (I General Remarks 6(44.0C-5;071,0): In July 1953, a "labor" unit from Kaloce, between 500 and 600 men -Strong, arrived at Molnari, where ordinarily there is no military garrison, and was billeted in local homes, while its headquarters was set up in the offices of a local brick kiln. The unit brought along various individual work tools and four excavators. A few days after its arrival, the unit began to build semipermanent defense works along a line along the border and about 1,000 meters from the later. Extent of Defense Line the task of the labor unit in question was to build defense works in a sector of about 15 kilometers beginning at Molnari, passing near Semenhaza and Septnek, and extending as far as another locality (whose name the source does not recall) about 7 kilometers from Septnek (the ,distance between Septnek and Molnari is about )3 kilometere). Description of Defense Installations Partly machine gun emplacements with the following characteristics: 50X1 Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/12 : CIA-RDP83-00418R000900130002-2 Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/12 : CIA-RDP83-00418R000900130002-2 50X1 50X1 50X1 - reinforced-concrete construction round-or square-shaped - wall thickness, 20-30 cm. cupola-type cover rising about 50 cm. above ground level flooring: concrete in some emplacements, brick in others, and packed earth in others - depth, about 2 meters (underground) embrasures: three, about 20 x 15 cm. each (in the frontal and lateral sections) entrance in rear (toward Hungarian territory), with iron door and a few steps leading down into the emplacement - camouflage: the cupola of the emplacement was covered with earth in which grass was seeded - the distance between emplacements varies between 20 and 150 depending on the nature of the terrain meters, Connecting Trench The emplacements are interconnected by an open connecting trench, about 70 cm. wide and 1.50 meters deep, which runs to the rear of the emplacements. Ammunition Storage Facilities 50X1 None Wire Entangle me nt As work on the emplacements proceeded, a double wire entanglement, about 1.50 meters high, was installed about 20 meters in front of the line of emplacements; the one-meter-wide corridor between the two rows of the entanglement was then filled in with another, gabion-type entanglement. At the time to which this information refers, this entanglement had been built from Molnari to a point beyond Semenhara and its construction was proceeding toward Septnek. -2- 50X1 Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/12 : CIA-RDP83-00418R000900130002-2 Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/12 : CIA-RDP83-00418R000900130002-2 50X1 Materials The necessary materials for this work were brought by rail to iimo- Murakeresztur (59-60/22-R) and transhipped by truck to the various work sites. Work Shifts Work went on uninterruptedly throughout the daylight hours; the excavators worked at night, too. Status of Project 50X1 On 15 September 1953 the work was still underway. As to the number of emplacements built by that date, the source could only say that they were "many." 15 Sep 53 -Air Raid Shelter uncbr Construction at Kaposvar (59-60/27-3) Location About 20 meters to the right of the Kaposvar railroad station (as one faces the latter). Construction Enterprise Concerned "Mavmagase ito" construction enterprise; the shelter is being built on order placed by the Ministry of Defense. Date ofyroject Work on the shelter began in the spring of 1953. Status of Prples In September 1953, the shelter walls had been put up; their characteristics are: - reinforced-concrete construction length of each side, 8 meters (the shelter will be square-shaped) height, 4.50 meters, 2 meters underground and 2.50 above ground thickness, about one meter The shelter area is divided in two interconnected units of equal size by a concrete partition wall. , 50X1 - 3 - Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/12 : CIA-RDP83-00418R000900130002-2 Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/12 : CIA-RDP83-00418R000900130002-2 50X1 When completed, the shelter will have electric, water, and sanitary facilities; access to it will be through a single door located in the sile facing the railroad station. SECRET Estimated Date of Copletion First 10 days of December 1954. REI - 4 - Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/12 : CIA-RDP83-00418R000900130002-2 50X1 50X1 50X1

Source URL: https://www.cia.gov/readingroom/document/cia-rdp83-00418r000900130002-2

Links
[1] https://www.cia.gov/readingroom/document-type/crest
[2] https://www.cia.gov/readingroom/collection/general-cia-records
[3] https://www.cia.gov/readingroom/docs/CIA-RDP83-00418R000900130002-2.pdf