Published on CIA FOIA (foia.cia.gov) (https://www.cia.gov/readingroom)


INFORMATION ABOUT MACHINE-TOOL PLANTS

Document Type: 
CREST [1]
Collection: 
General CIA Records [2]
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00809A000500730090-8
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
3
Document Creation Date: 
December 21, 2016
Document Release Date: 
September 8, 2003
Sequence Number: 
90
Case Number: 
Publication Date: 
November 11, 1998
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00809A000500730090-8.pdf [3]198.32 KB
Body: 
Approved For Release 2008/03/03: CIA-RDP80-00809A000500730090-8 ~, LJ1J ~ I r l VFt I I v I A CENTRAL INTELLIGENCE A INFORMATION FROM F:: REIGN DOCUMENTS OR RADIO BROADCASTS COUNTRY USSR CT INFORMATION BOUT C U A BJE MA HINE-TOOL PLANTS S HOW DATE DIST. 4/April 1949 PUBLISHED Radio Broadcasts and Morse Transmissions WHERE PUBLISHED 25X1 NO. OF PAGES 3 DATE PUBLISHED LANGUAGE REPORT NO. THIS DOCUMENT CONTAINS INFORMATION APPECTIHY TIIE NATIONAL DEFENSE OF TIIE UNITED STATES WITHIN Till MEANING OF ESPIONAGE ACT SO U. S. C.. SI AND SE. AS AMENDED. ITS TRANSMISSION OR T11E REVELATION OF ITS CONTENTS IN ART MANNER TO AN UNAUTHORIZED PERSON IS PRO- .IRITED ST LAW. REPRODUCTION OF THIS FORM ID PROHIDITSO. The Kirov Machine-Building Plant in Gorlovka has put a new coal combine into serial production. (Kiev, 11 April 1949) This report is submitted in response to a request for specific information concerning a list'N Of machine-tool plants in the Soviet Union. The material has been gathered from USSR AND SATELLITE INFORMATION ABSTRACTS (published weekly since 8 October 1948) which includes all economic items from monitored Soviet broadcasts. All monitored items (since 6 October 1948) pertaining to this request follow in tabular form: The following information concerns factories not included in the request list: The Chernigov Preluki Machine-Building Plant has completed the construction of a new mechanical workshop covering an area of 1,000 square meters. (Chernigov, in Ukrainian, 8 November 1948) The Gorniak Machine-Building Plant in Kutaisi has reached the production level planned for 1950. (Tiflis? 28 February 1949) The Kiev Electric-Precision-Tool Plant increased production 2.2 times during 1948 as compared to 1947, (Kiev, in Ukrainian, 6 October 1948) The "Neva Lenin Machine-Building Plant" in Leningrad has completed successful tests of a new steam air-blast "turbo-blower." (TABS, in Russian Morse to the Far North, 13 April 1949) The "K aenoluchekv Machine-Building PlantN completed the four-year production plan in two years and 10 months. (Kiev, in Ukrainian, 11 November 1948) (NOTE: The location of the Plant is not specified in the broadcast.) NSRB DISTRIBUTION FBI I I -77 NAVY AIR Approved For Release 2008/03/03: CIA-RDP80-00809A000500730090-8 Approved For Release 2008/03/03: CIA-RDP80-00809A000500730090-8 (ONFfl Et L 25X1 LOCATION FACTORY Baku Mobile Machine-Tool The Baku]Machine-Tool Factory has constructed a new ex, Factory perimental department for precision measurement apparatus? (Baku, 1 November 1948) Kharkov Molotov Machine-Tool The factory, during 1948, produced six new types of Factory polishing machines. (TASS, to the USSR provincial press, 19 December 1948) During 1948. the factory produced the first machine- tools tog, work on large ball bearings. (Soviet Home Service, 22 January 1949) ~ Kiev or Gorki Machine-Tool The Gorki Machine-Tool Plant has produced. experimental Kizel Plant "drum-type" milling machines. A longitudinal four- spindle milling machine has been built; it is capable of milling four different surfaces simultaneously. (TASS, in Russian Morse to North Aaer:ca: 18 November 1948) (Note: Location not given :r. he transmission.) Leningrad Ilich Machine The factory has designed and produced "automatons' and Factory "half-automatons" which require no human supervision. (TASS, -a English Morse to the Far East, 13 November 1948) Karl Marx Machine The factory has produced a combined textile machine Factory which replaces 50 machines,. (ibid..) Sverdlov Machine- The factory has produced machine tools with a speed of Tool Construction 2,000 r.~p.m. (ibid.) Vtoraya Pyatiletka At the Vtoraya PYatiletka Plant 25 cutting lathes are being introduced for high speed of operations, (TASS; in Russian Morsa to the Far East, 26 March 1949) Molotov Dzerzhinski Machine The "Dzlrehinski Agricultural-Machine-Building Works" has Construction Works begun the serial production of motors forlvegetable garden tractors; the motors have a capacity of 3 and 4.5 horsepower. (Soviet Home Service, 8 January 1949) Moscow Krasni Proletari The Kra:3ni Prole;ari Machine-Tool Factory is producing Machine-Tool Factory the "VK10--"First Class'--lathe. (TASS, in English Morse to North; America, 10 January 1949) gi Ordzhonikidze The "Ordzhonikidze Engineering Works" is producing a Building "universal automatic machine tool." (TASS. in English Morse to North', America, 10 January 1949) Odessa Kirov Machine-Tool Factory The Ilich Works has produced a new type electric motor with a capacity of 100 kilowatts and standard type parts to simplify "serial production." (Soviet!Eome Service. 13 January 1949) The "Kirov Factory" has promised to complete the above- plan manufacture of three "universal" milling machines by the end of January. (Kiev, 27 January 1949) The "Urals Machine-Building Works" recently completed the manufacture of all machinery and equipment for the rail and steel girder shop of the Tagil Metal Works. During 1949, new types of blast furnaces: rolling mills and crushing plants will be produced. (TABS, in Russian Hellsehrieiber to Europe, 24 January 1949) The "Urals Machine-Building Works," during 1548, intro- duced the conveyor belt aystem and swift mc3thods of metal cutting,, (TASS, to the USSR provincial press, 31 January 1949) Approved For Release 2008/03/03: CIA-RDP80-00809A000500730090-8 Approved For Release 2008/03/03: CIA-RDP80-00809A000500730090-8 COIN, LOCATION FACTORY INFOLMA.TION Sverdlovsk Uralmash I The "Urals Machine-Building Works" is now building a'hy- (contd.) draulic electric un t u l Taganrog Tiflis Stalin Tool Factory i Kirov Machine-Tool Factory Voronezh Kalinin Factory Machine-Tool n o c g g ose the door of the blast furnace. It Closes the "sle- -.notch" of the largest blast furnace wi*tl one shot. (Magadan, 12 March 1949) The "Stalin Plant has begun mass production of self- propelled combines. (TASS, in English Morse to the 1 11 ''1 Far. East , 28 January 1949) The Kirov Machine Tool Factory is producing "tube- processinglatheal" (TASS, to the USSR provincial press, 12 March 11949) The "Kalinin Plau4;?J has set up facilities to manufacture 350-ton, capacity;_presses, (Soviet Home Service, 9 4anuaryl1949)'' . ~` The "Kalinin PlantQO has produced new forge equipment including heavy.modei equipment fur casting. (TASS, to the USSR provincial press, 12 March 1949) CONFIDENTIA . C ONFIDENTIAL Approved For Release 2008/03/03: CIA-RDP80-00809A000500730090-8

Source URL: https://www.cia.gov/readingroom/document/cia-rdp80-00809a000500730090-8

Links
[1] https://www.cia.gov/readingroom/document-type/crest
[2] https://www.cia.gov/readingroom/collection/general-cia-records
[3] https://www.cia.gov/readingroom/docs/CIA-RDP80-00809A000500730090-8.pdf