Published on CIA FOIA (foia.cia.gov) (https://www.cia.gov/readingroom)


CONSTRUCTION PLANS FOR(Classified)

Document Type: 
CREST [1]
Collection: 
General CIA Records [2]
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP66B00560R000100180010-5
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
November 11, 2016
Document Release Date: 
April 22, 1999
Sequence Number: 
10
Case Number: 
Content Type: 
PAPER
File: 
AttachmentSize
PDF icon CIA-RDP66B00560R000100180010-5.pdf [3]158.18 KB
Body: 
Sanitized - ApprovedYPbr Release 7RPP66~B00560 0.61001 10-5 CGS-f44/ Gj Construction Plana f _ 25X1A 25X1A, 1. The following construction plane for take into coneidoration the requirements for the project,. , 25X1 A 25X1A 2. Under FY 1963 or' prior funds (ourrently being a. An overall rehab contract of approxi- mately for utilities$ taxiwaya, and some o' f cars quarters and airmen dome buildings, b. Rehab hangar #3 and. extra ~a a for hangar # (just. starting construction) approximately TOTAL 25X1 A 3. FY 196 MCP funds (design) (funds not provided by Congress as yet; however* indications are that all will be approved and funded) e, Vehicle refuel shop b. Grounds support shop, Aviation as store (25,000 bbl d. Jot fuel store ( 5,OoO bble,) Warehouse supply and equipment Dormitory--Airmen (composite building, additional 2U0 men Dining sill (additional 5 000 square feet approximately h. Generators (2 each 1300 KW each sw 2600 K i fan tar #1. TOTAL Navy projects (Navy funded) (Hangar Construction Post index (based on.. Washington, 3.1. Sanitized- Approved For Release C1A: DP66B00560R00010d\180..010-5 25X1A Sanitized Approved For Release Q.IA-RPP66B,0056QR000100180010-5 per hundred weight. Cuff-sees son ,oast is from b.QQ to U26.Q0 per hundred weight, depending OA the amount of fuel olydered. plan ' 0-1111,:"t Is the requirement that wtX1 exist for otr.saison trsnaportation for fuel once; the project becomes 25X1A effective. The oloseet est.mate that can be made is that due to the laoI of pled or piiating etorago faoilitiea, taro off-moeeo a shipments will be requited after bee as 25X1A operational. Qurrent pries ,ion-e#a.eons, east of fuel is 0.78 6. There is one problem not ,'rovtder for in the above 7. Tor future planning beyond the pro.jeot, the 25X1A fallowing is a. run-down of hangar utilisation at 25X1A 25X1A a. Hang" 1 - Used by fair to poor 25X1A o. angar Currently raisin; roof and tixin"' Ieentos, under .311 for Mods and MAR for repaaira 25X1:A: b. iangar 2 8WQ', flood condition - Little bit. condition$ barely adequate for a "arago. needed It aircraft are to. gaIu &00048- Taxiway to be repaired. Comparable to throe after work d3. Hangar y. ? FS 1961- .for repair and raise roof. is fini3hed-'ld. Maaint. Hangar, e. Uongar must consider in operating any tutur4 aotivit.ios atr 25X1A All of these factors 'should be considered won thin ag 0 8. Attc:ohed ip a naebaga that any military or sui>ation placing a new activity at 25X1A Sanitized - Approved For Release : ,+CIA-RDP66B00560R0001w 01,8001.0 5.

Source URL: https://www.cia.gov/readingroom/document/cia-rdp66b00560r000100180010-5

Links
[1] https://www.cia.gov/readingroom/document-type/crest
[2] https://www.cia.gov/readingroom/collection/general-cia-records
[3] https://www.cia.gov/readingroom/docs/CIA-RDP66B00560R000100180010-5.pdf