Document Number (FOIA) /ESDN (CREST):
CIA-RDP69B00279R000200080002-4
Body:
Approved For Release 2002/0e/ ~iCi-RDP69B00279R000200b80002-4
25X1A
25X1A
20 May 1966
detector. Phase tour prOV2'es nor
of field en~ neerxny.
This approach circuItwvents ca g
characteristics of= the existing lead sulphide ,,~,~,~~ 1
mo wee`. sV "'^'T . 4
or
three provides for a racl~. nr, mona "' /J l r I)
c' amgn utilizing a photo-voltaic silicaza diode.
.I ? lon term aging.
Dear Jerry:
We are pleased to submit the following
quotation provide for modification of the
e,sisting o all operational
configuration for automatic activation and to
provide for flight test support of the aster.
Attachment 1 describes the work effort
in four phases. Phase covoa::: the timechlanical
modifications necessary to provide raaoru riyi.c`
mounting and co-mpatibility with the airframes
manufacturers preferred electrical connectors.
14aaa tVl? covers the redesign of a pro=Jra-minor
'in o~
card plus the ancillary ;pairing changes to
porate the mutually agreed upon control function."
including the necessary time delays, etc.
df r
f
.
-L cng
prior to 13 June 1965 with the blO
cor?wj,encing in the 13 to 20 3's. ne ti..e period.
Should additional inforratation be de ireZ,
contact the andersigned.
The quotation as outliale'-ca herein is su'a:-
mitted on the :asis of receiving a Cos `-
Fixed-wee type contract for a total price of
eluding fixed foo in the amount of
cost breakdown is +aubraitted as
ttachmebit .
acco ,a , i~ i
The first three phases are to 'be
~- ? d ? ir~eeri~?x=
3
'
Approved For Release 2002/06/13 : CIA-RDP69B00279R000200080002-4
Approved For Release 2002/06/13 : CIA-RDP69B00279R000200080002-4
JULY 1966
25X1A
25X1A
25X1A
RECEIVED I J
THIS DATE FRO
C 011 -,c
Approved For Release 2002/06/13 : CIA-RDP69B00279R000200080002-4
Approved For Release 2002/06/13 : CIA-RDP69B00279R000200080002-4
J TTTCIi:ENT 1
25X1A
TASK OUTLIkDEP
T"OR
OPERATIONAL CONEXGU11"ITIGN
al'D
1. P1!ASE I Mechanical Modifications
1.1 Provide front supporting, structure*
1.2 Provide mounting for operational configv-rat.
electrical connectors for power and
cc-.a
1.3 Provide mountings for new inter-nrogram~;e4
connector.
PHASE 11 Electrical Modifications, System Control
2.1 Redesign and modify control, and
"B" pro ramuer cards to incorporate
operational control Con-1-4
guration,
2.2 modify system wiring as necessary and
integrate new connectors.
3. I'VE III Electrical codifications, IR Monitor
3.1 Redesign and incor,orate improved IR rconikao:
into Lana) Housing.
4. P E IV Flight Test Support
4v.1 Transport equipment and personnel to tel:.
i te.
4.2 Interface system with A/C.
4.3 Support flight teats.
NOTE: RFI lox lower corner relief will r dt Lc
F~? ; va
this flight tou t as tun is : it A ez w ,
Approved For Release 2002/06/13 : CIA-RDP69B00279R000200080002-4
25X1A
L Approved For Release 2002/06/13 : CIA-RDP69B00279R000200080002-4
Approved For Release 2002/06/13 : CIA-RDP69B00279R000200080002-4