Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-02820A000800050053-0
Body:
Approved For Release 2004i04123 : CIA-RDP78-0282OA000800050Q&-0
OR IC I NA TOR I SI
c ' . U R F q"K AC
T I V E
PRUJI rT NUMBER PRIORITY CLASS
E-5217 I
25X9A2
HI.1 GET FST REPORTING PfRInr,
AYOUNT
1 - 31 August 1962
Design new receiver site buildings, 25X1A6b
Design and layout of a new "interim" receiver building should accomodate:
1) A tape relay room for 18 circuits (including ei t on-line), 2) Signal
center area for 10 ZW-26'6, 3 Tot's, 2 HW-19A'5, 3) Five CW
site maintenance, and 5) Officespace positions, for a chief, OPS officer, engineer,
security and secretarial force. A second building vill be required for adequate
"area" warehousing, plus emergency power facilities. Note that maximum single-
site purchase is legally limited to 5 acres, vhich effects antenna planning.
Full details are carried in AFD M-62-055, dated 25 June 1962.
July 1962
1. During this reporting period several meetings were held with Real Estate and
Construction representatives, and they offered several suggestions and improve-
ments to the original receiver building room layouts. In particular, the
lounge and restroomis were rearranged, and all room dimensions layed out on
16 foot centers to conform with structural requirements.
2. Originally, air conditioning was considered to be a major cost item running to
20 tons and $20,000 for a central duct system. This high coat meant com-
promising the building size, so it was decided to use window units in the shop
and offices, and floor or roof units in jhe main equipment room bringing the I
cost down to $7,950 for 20 tons. Initial installation will be 13 tons at
$4,200.
3? The generator and warehouse building includes space for 2-100 XW generators,
shop area, office and emergency transmitter area, and 750 square feet of
storage space.
251
RM 1543 -
Approved For Release 2001/04/23 : 8-02820A000800050053-0
fA9a
Approved For Release '1/04/ CIA-RDP78-0282OA00080001W053-0
E-5217
' 7f.1 .._._ 1 > i 'V
7:1RIOT
FES 1 - 31 August 1962
1. The estimated cost for the receiver building (3500 sq. ft.) and the warehouse
and generator building (1400 sq. ft.) including air conditioning and all
compound work, is $85,000 to $90,000. This is considered to be on the "heavy
side". Total amount budgeted for all construction is $100,000.
5. General work on teletype and radio circuit layout was started and the
impossibility of designing an equipment layout to please everyone was demon-
strated.
Approved For Release 2001/04/x? - -RQP~8-02820A000800050053-0