EP 66-114
TO The Files: Contract 4168, Task Order 2 DATE: 31 May 1966
doom
FROM : Mr.
25X1A9a
'IUBJECT: Inspection Report No. 3 - RS-101 with
1.. Project Description:
6. Contractor's Performance:
Payroll Savings Plan
Buy U.S. Savings Bonds Regularly on 4%e
2. Contractual Information:
a. Initial Cost: $219,945
b. Request for Procurement Action: 28 September 1965
c. Initiation Date: 12 October 1965
d. Completion. Date: 12 August 1966
e. Deliverable Items: Four service test models - 12 July 1966
Ten instruction books - 12 August 1966
Five final reports - 12 August 1966
One set reproducible manufacturing drawings -
12 August 1966
One set reproducible equipment specifications -
12 August 1966
One set reproducible production specifications
12 August 1966
3. Date of Meeting 19 May 1966
4. Place of Meeting: Cincinnati, Ohio
5. Persons Attending:
Agency
Non-Agenc
Mr Mr.
25X1A9a Mr. Mr`
Mr. Mr.
Mr.
Approved For ReleasJOO0/09/08 : -R 78-0282OA00120M30033-9
EP 66-114
$''UBJECT: Inspection Report No. 3 - RS-101 with
6. Contractor's Performance:
a. On schedule and expected to remain so: No
b. Within obligated funds and expected to remain so: Yes
c. Satisfactory technical progress: Yes
7. Project Status:
The case and front panel for the engineering model are finished,
with the exception of front panel engraving. The receiver is completely
assembled and is being tested. Tests thus far indicate that performance
is about the same as that of the RS-100 receiver, with one significant
exception. Repackaging the tuner has resulted in a lower front end
"'Q", and consequently a lower image rejection. A comparison of image
rejection for the RS-100 and RS-l01 is shown:
RS-l00 RS-101
Band 1 63 db 63 -48db
Band 2 82 - 53 db 54 - 39 db
Band 3 66 - 46 db 46 - 35 db
Band 4 51 - 31 db 30 - 22 db
M will make a halfhearted attempt to improve these figures (partic-
ularly for Band 4) though little hope is shown.
Five of the six circuit boards for the transmitter have been
built and tested; testing of the sixth was 80% complete. Mechanical
work on the heat sink module was finished and the module was ready
for wiring. The RS-l01 engineering model should be completed by
10 June. Three weeks of testing are then planned.
Work on the five service test models will start the early part
of June. Present programming calls for completion of these in late
September. This is about two and one-half months later than called
for in the contract. About six weeks of this delay is attributed
to a late start caused by indecision on our part concerning front
panel layout. Another delay could be attributed to the extra design
time devoted to the semi-automatic tuner to make it tune to within
less than one turn of the knob. The difficulty of obtaining parts
and services because of the problems in Vietnam also slowed the
program.
At the moment, the only unresolved. . . .
Approved For Release 2000/09/08 : CIA-RDP78-02
mm" Q D CT
2
Approved For Releas#JOOO/09/08: CIA- 0A0012OW30033-9
EP 66-114
'MUBJECT: Inspection Report No. 3 - RS-101 with
25X1A5a1
At the moment, the only unresolved procurement problem involves
the transmitter power transistors. The transistor type that had been
promised by RCA .(and supplied as a sample) did not get into production.
Clevite Division of ITT is about to begin production of a transistor
that will serve adequately. _ does not have any of these now, but
they do have promises that appear to be valid of delivery in time to
meet the schedule as outlined above.
Distribution:
R&D Subject File
OL/PD/PCB/CAS
R&D Lab
OC-OS
ESB
Monthly (3)
EP Chrono
ZX1A9a ?0C-E/R&D-EP bjp
Approved For Release 2000/09/08: CIA-RDP78-
X600:
utomatlc
downgradli
3 declasslticatlon
--K" V111t
(31 May 1966)