Memorandum
The Files: Contract 4017-65-R,
Task Order 4017(100,010)Ol-65-R
25X1A9a
!02820A001200040027-5
EP 66-165
DATE: 18 July 1966
SUBJECT:
Ins pection Repor
1.
Project Description:
Service Contract.
This task
provides for the performance of a
2.
variety of work order type jobs.
the prime consideration.
Contractual Information:
Engineering and shop services are
a. Initial Cost: $5,000.00 Increase in Funds: 1) $25,000.00
2) $11,600.00
b. Request for Procurement Action: 19 March 1965
c. Initiation Date: 1 July 1965
d. Completion Date: 30 June 1966
e. Deliverable Items: As described under each work order.
3. Date of Meeting: 8 July 1966
4. Place of Meeting:
5. Persons Attending:
Agency
25X1A9a Mr.
6. Contractor's Performance:
25X1A6a
25X1A5a1
25X1A5a1
Non-Agency
Mr. 25X1A5a1
Mr.
a. On schedule and expected to remain so: No
b. Within obligated funds and expected to remain so: Yes
c. Satisfactory technical progress: Yes
7. Project Status:
Approved F~~ijR( ~ z ~f wegiAl p
QD1c2OO40027-5
97EPA
Approved For Release 1909/09/07 : C1 WDP78-02820A004 00040027-5
=MW
crJB~CT: Inspection Report No. 7 - Service Contract with
--25X1A5a1
EP 66-165
25X1A5a1
7. Project Status:
Work Order No. 1 - RS-O9 S stem reviously designated Work
2 2 . The electronic sequencers control module which is used to
regulate-the motor of the KE-8 was found to be under"designed.
By changing the value of resistors in the module, acceptable
performance was achieved. New modules are being fabricated.
Components were being assembled on the PC cards prior to module
potting.
The remaining three RS-509 ELD packages are mechanically
complete. As soon as the motor control modules are ready, the
transmitter/keyer/sequences interconnecting wiring will be
started. The projected delivery date for the three packages
is 28 July 1966. It appears that the contractor has assigned
a lower priority to the completion of this work than that which
was originally estimated. Also, because of the overrun condition-
that this work was previously in, there was an obvious attempt
to reduce a portion of the work effort in certain areas of the
program. The contractor was advised of the unacceptability of
this approach and agreed to fabricate the three remaining
RS-509's in a manner equivalent in appearance to the RS/L-509-
Distribution:
R&D Subject File
OL/PD/PCB/CAS
R&D Lab
OC-OS
ESB
Monthly (3).
EP Chrono
.MW OC-E/R&D-EP/ /bjp