Approved For Release 2007/11/05: CIA-RDP80TO1471 R001300110001-6
K-6823
PETROLEUM REFINERIES AND STORAGE
BAN SI RACHA, THAILAND
1307N 10055E
1. SIGNIFICANCE:
THIS BRIEFING BOARD SHOWS THE RECENTLY CONSTRUCTED OIL REFINERY
AND THE ASPHALT REFINERY LOCATED AT BAN SI RACHA, WHICH HAVE APPRECIABLY
REDUCED THE NEED FOR THE IMPORTING OF FINISHED PETROLEUM PRODUCTS INTO
THAILAND.
2. REMARKS:
PRIOR TO 1964 THAILAND HAD ONLY ONE SMALL OIL REFINERY OPERATING AT
MUANG FANG, WHICH WAS RATED AT 50,000 METRIC TONS PER YEAR. IN 1964 AND
EARLY 1965 BOTH REFINERIES AT BAN SI RACHA WERE IN OPERATION WITH A
COMBINED OUTPUT OF APPROXIMATELY 1,900,000 METRIC TONS. THE ANNUAL
CONSUMPTION OF PETROLEUM PRODUCTS IN THAILAND IN 1963 WAS ESTIMATED
AT 1,500,000 METRIC TONS; IN 1964 COMSUMPTION WAS ESTIMATED AT 2,100,000
METRIC TONS.
3. LOCATION:
~
THE OIL REFINERY IS LOCATED 3.1 NM SOUlSOUTHWEST OF BAN SI RACHA,
NPIC/CSD 638/65
28 DECEMBER 1965
PAGE
AND THE ASPHALT REFINERY IS LOCATED 4.2 NM SOUTHWEST OF BAN SI RACHA.
THE AREA OF THE TWO PLANTS IS LOCATED APPROXIMATELY 41 NM SOUTHEAST OF
KRUNG THEP (BANGKOK).
4. COLLATERAL:
A. IN 1961 THE THAI OIL REFINERY CO. LTD. (TORC) (BAN SI RACHA OIL
These notes have been prepared for briefing purposes on!y and should not be used for detailed analytical work.
Their use should be restricted to the particular briefing boord(s) they were prepared for and must be considered valid
only for the reporting period as indicated by the date of issue.
25X1
Approved For Release 2007/11/05: CIA-RDP80TO1471 R001300110001-6
K-6823
Approved For Release 2007/11/05: CIA-RDP80TO1471 R001300110001-6
NPIC/CSD 638/65
28 DECEMBER 1965
PAGE
40,000 BARREL PER DAY REFINERY TO PROCESS CRUDE PETROLEUM IMPORTS.
SHELL OIL COMPANY THEN CONTRACTED TO MANAGE THE TORC REFINERY THROUGH 1974,
AT WHICH TIME TORC WOULD BE NATIONALIZED, THE BULK OF CRUDE OIL IMPORTS
WILL BE PROVIDED BY SHELL, WITH ESSO AND CALTEX PROVIDING SMALLER
AMOUNTS.
FOUR 2,000 D.W.T. TANKERS OWNED BY THE THAI PETROLEUM TRANSPORT
COMPANY AND SUPERVISED BY SHELL PERSONNEL ARE USED TO TRANSPORT FINISHED
PRODUCTS FROM TORC TO KRUNG THEP. THE PORT FACILITIES AT BAN SI RACHA
CAN ACCOMMODATE TANKERS UP TO 50,000 D.W.T.
LIQUID PETROLEUM GAS (LPG)
PREMIUM. MOTOR GASOLINE
REGULAR MOTOR GASOLINE
KEROSENE/hTUR
AVTAG
GAS OIL
DIESEL OIL
FUEL OIL
BITUMEN
QUANTITY PERCENTAGE
(metric tons) OF OUTPUT
2,160 0.12
99,540 5.53
-414,000 23.00
263,880 14.66
108,000 6.00
583,920 32.44
91,980 5.11
210,780 11.71
25,740 1.43
TOTAL 1,800,000 100.00
THE THAI ASPHALT MANUFACTURING COMPANY (TAMC) (BAN SI RACHA
REFINERY THAI ASPHALT MANUFACTURING PLANT,I I IS JOINTLY
OWNED BY THE SUMMIT INDUSTRIAL CORPORATION (UNITED STATES) AND THAI
INTERESTS. THE REFINERY WAS PROBABLY IN OPERATION IN EARLY 1965. IT
HAS AN ESTIMATED PRODUCTION CAPACITY OF 60,000 METRIC TONS OF BITUMEN,
AND STORAGE FACILITIES FOR 57,100 METRIC TONS OF CRUDE OIL AND 71,400
These notes have been prepared for briefing purposes only and should not be used for detailed analytical work.
Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid
only for the reporting period as indicated by the date of issue.
yr
Approved For Release 2007/11/05: CIA-RDP80TO1471 R001300110001-6
K-6823
Approved For Release 2007/11/05: CIA-RDP80T01471 R001300110001-6
NPIC/CSD 638/65
28 DECEMBER 1965
?AGE
METRIC TONS OF FINISHED PRODUCTS. THE PLANT COULD PRODUCE PRODUCTS
OTHER THAN ASPHALT BUT IS NOT KNOWN TO HAVE A LICENSE TO DO SO. THE
TOTAL PLANT CAPACITY IS RATED AT 150,000 METRIC TONS.
5., MISSION READOUT:
PHOTOGRAPHY OF REVEALS THE FOLLOWING: 25X1
THE TORC REFINERY CONTAINS TWO CATALYTIC CRACKING UNITS, FOUR
POSSIBLE FRACTIONATING UNITS, ONE COOLING TOWER, ONE SPRAY POND,
EIGHT LARGE FLOATING TOP STORAGE TANKS, SIX MEDIUM SIZE TANKS, FIFTEEN
SMALLER TANKS OF VARIOUS SIZES, AND NUMEROUS SUPPORT BUILDINGS. JUST
WEST OF THE REFINERY ARE LOCATED TWELVE SMALL BUILDINGS, ONE LARGE
L-HEAD OIL BUNKERING PIER, AND ONE SMALL PIER.
THE TAMC REFINERY CONTAINS FOUR FRACTIONATING UNITS, ONE SPRAY
POND, FOUR LARGE FLOATING TOP TANKS, TWO LARGE PLAIN TANKS, ELEVEN
MEDIUM SIZE TANKS (TWO OF WHICH ARE STILL UNDER CONSTRUCTION), FIFTY-
FOUR SMALLER TANKS, EIGHT HORIZONTAL BLIMP TANKS, AND APPROXIMATELY
FORTY SUPPORT BUILDINGS. DOCKING FACILITIES INCLUDE ONE LARGE AND ONE
MEDIUM OIL BUNKERING PIER AND TWO SMALL PIERS.
These notes have been prepared for briefing purposes only and should not be used for detailed analytical work.
Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid
only for the reporting period as indicated by the date of issue.
nrnn r a
Approved For Release 2007/11/05: CIA-RDP80T01471 R001300110001-6
Approved For Release 2007/11/05: CIA-RDP80TO1471 R001300110001-6
MINORL mIWIWRNrnu.. InI[nrn[InnUn UI.l L
PETROLEUM REFINERIES AND STORAGE
BAN SI RACHA, THAILAND
13-07N 100-55E
Approved For Release 2007/11/05: CIA-RDP80TO1471 R001300110001-6
25X1