SOVIET NAVAL MISSILE STATIC TEST FACILITIES

Document Type: 
CREST [1]
Collection: 
NGA Records (Formerly NIMA) [2]
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP79T01819A000100890001-7
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
8
Document Creation Date: 
December 28, 2016
Document Release Date: 
May 17, 2010
Sequence Number: 
1
Case Number: 
Publication Date: 
June 1, 1979
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP79T01819A000100890001-7.pdf [3]335.38 KB
Body: 
Sanitized Copy Approved for Release 2010/05/17: CIA-RDP79T01819A000100890001-7 Top Secret NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER BASIC IMAGERY INTERPRETATION REPORT SOVIET NAVAL MISSILE STATIC TEST FACILITIES (S) STRATEGIC WEAPONS INDUSTRIAL FACILITIES USSR JUNE 1979 Top Secret 25X25X1 RCA-09/0014/79 Copy 49 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP79T01819A000100890001-7 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP79T01819A000100890001-7 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP79T01819A000100890001-7 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP79T01819A000100890001-7 Top Secret RlFF UTM COORDINATES NA sile Static Test Facilities GEOGRAPHIC COORDINATES See below CATEGORY See below BE NO. See below COMIREX NO. See below See below DMA. SIG, Series 1505. Sheet NP 35. 36-15. 2r] Pd- Nov 77 cra1P 1.9F(1 000 (SF.rRFT/R .1 Geographic Category BE No COMIREX NIETB Coordinates No (MRN) No Leningrad Solid Motor 60-12-50N 030-42-18E Test Facility 2 Leningrad Solid Motor 60-15-33N 030-44-40E Test Facility 3 ABSTRACT 1. (TSR) This report describes activity observed at Leningrad Solid Motor Test Facilities 2 and 3. The current reporting periods for Test re the informa- tion cu o date, respectively. This report also updates the relevant portions, describing these facilities, of NPIC repor 2. (TSR) Between August 1974 and mid-1976, test positions 2, 3, and 4 at Test Facility 2 were dismantled and replaced by test position 6. During the current reporting period, activity at the facility was seen primarily at test position 6. Since its apparent completion in 1976, the test position has undergone a number of changes which may indicate different test phases or programs involving new technologies. 3. (TSR) A modified version of the SS-N-12 missile system is being tested at Test Facility 3. This facility has also been involved in the testing of a new and/or modified weapon system. Testing of the SA-N-1/SA-3 missile system has apparently ended. 4. (U) This report contains a location map, a table, and seven photographs. -1- Top Secret RCA-09/0014/79 75X1 25X1 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP79T01819A000100890001-7 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP79T01819A000100890001-7 Top Secret RUFF BASIC DESCRIPTION 5. (TSR) Leningrad Solid Motor Test Facilities 2 and 3 (Figure 1) have, in the past, been involved in the static testing of solid propellant motors for new and/or modified weapon systems; in some cases, the facilities have been involved in testing the same missile system. This report describes current test activity and physical changes observed at these facilities during the reporting periods. The current reporting periods for Test Facilities 2 and 3 are the information cutoff date, respectively. This report also updates the relevant portions, describing these facilities, of a previous NPIC report.' 30?45' -2- Top Secret Sergeye LENINGRAD SOLID MOTOR TEST FACILITY 3 Rog?zinka 0 LENINGRAD SOLID MOTOR 61 ,khcheolovo 25X1 25X1 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP79T01819A000100890001-7 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP79T01819A000100890001-7 Top Secret RUFF Leningrad Solid Motor Test Facility 2 6. (TSR) During the reporting period, activity at Test Facility 2 (Figure 2) was seen primarily at test position 6. This test position is double-fence secured and has been under- going construction and modifications since 1974. The precise function of the test position has not yet been determined, but its design suggests activity other than that of static testing of solid propellant motors. 7. (TSR) Between August 1974 and mid-1976, the Soviets dismantled test positions 2, 3, and 4. They were replaced by a single test position, designated test position 6 (Figure 3 and Table 1), which is unique in design to the USSR. Test position 6 consists of a revetted hardstand with a small building, a shelter, a set of tracks, optical positions, and a conduit situated on the hardstand. The conduit is L-shaped and extends from the small building through the revetment wall to a laboratory. The laboratory is parallel to the revetment wall and is connected by a pipeline to a support building. Pressure bottles have been seen stored horizontally in front of the support building, which is adjacent to a storage tank. A revetted explosives storage building and seven other support buildings are also within test position 6. 8. (TSR) The test position has undergone a number of changes since its apparent completion in 1976. Figure 3 shows the configuration of the test position as of Q 25X1 Figures 4 through 7 show changes and/or movement of objects and of structures on 25X1 the hardstand between Although the significance of the 25X1 activity is unknown, it may be an indication of different test phases or of programs involving new technologies. 9. (TSR) No significant activity was observed at test positions 1 and 5 or in the structural test area (Figure 2) during the reporting period. The double fencing around two control bunkers has been removed and the ordnance witness panel has been dismantled, further suggesting that test position 6 will be the center of activity. Leningrad Solid Motor. Test Facility 3 10. (TSR) Leningrad Solid Motor Test Facility 3 (Figure 8) has been actively in- volved in propulsion testing of a modified SS-N-12 missile system since October 1976.' On that date, an SS-N-12 missile airframe and missile crates were observed in the facility. The airframe was at test position 4 where it was apparently undergoing an integrated airframe/propulsion test phase. Test position 4 was the primary site of test activity at the facility from 1976 through January 1978. By March, testing within the facility had been shifted to test position 2, a static test position for boosters and/or sustainer motors. The shift in test locations suggests that problems may have developed in the integrated test phase which require a more extensive component test program. Upon resolution of these problems, testing would be expected to be resumed at test position 4. An indication of this -3- Top Secret RCA-09/0014/79 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP79T01819A000100890001-7 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP79T01819A000100890001-7 Iq Next 6 Page(s) In Document Denied Sanitized Copy Approved for Release 2010/05/17: CIA-RDP79T01819A000100890001-7 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP79T01819A000100890001-7 Top Secret RUFF was seen onl I On that date, snow had been selectively removed from the test 25X1 cell - a procedure that was used in a previous test conducted at test position 2. It cannot be determined at what stage of development the modified SS-N-12 missile system is, but successful completion of the integrated test phase would make the missile system available for flight testing at launch facility A, Nenoksa Naval Missile Test Center 25X1 11. (TSR) Also at Test Facility 3, an canister was seen adjacent to 25X1 the assembly/checkout building in September 1978. There were no distinguishable mark- ings on the canister, but its size was comparable to that of a canister for the SS-N-15, an antisubmarine warfare (ASW) weapon. If the canister is for the SS-N-15, then its arrival at a research and development propulsion static test facility would indicate that the propul- sion system for the weapon system has apparently been modified. 12. (TSR) The testing of components of the SA-N-1/SA-3 missile system at Test Facility 3 has apparently ended. The missile canister for the system(s), initially seen here in mid-1976, has not been seen since mid-1978, suggesting that the SA-N-1/SA-3 test program has been concluded. (TSR) All applicable KEYHOLE imagery acquired through was used in the preparation of this report. 1. NPIC.I I RCA-09/0022/77, Developments at Soviet Solid Propellant Research and Devel- opment Facilities (TSR), Sep 78 (TOP SECRET ary 1977, Apr 77 (TOP SECRET 1977-March 1978 (S), Jul 78 (TOP SECRET COMIREX J02 Project 290013DJ (S) Comments and queries regarding this report are welcome. Soviet Strategic Forces Division, Imagery Exploitation Group, NPIC, Top Secret 25X1 25X1 2.5X1 25X1 25X1 25X1 25X1 LOA-1 25X1 25X1 25X1 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP79T01819A000100890001-7 Sanitized Copy Approved for Release 2010/05/17: CIA-RDP79T01819A000100890001-7 Top Secret Top Secret Sanitized Copy Approved for Release 2010/05/17: CIA-RDP79T01819A000100890001-7

Source URL: https://www.cia.gov/readingroom/document/cia-rdp79t01819a000100890001-7

Links
[1] https://www.cia.gov/readingroom/document-type/crest
[2] https://www.cia.gov/readingroom/collection/nga-records-formerly-nima
[3] https://www.cia.gov/readingroom/docs/CIA-RDP79T01819A000100890001-7.pdf