Published on CIA FOIA (foia.cia.gov) (https://www.cia.gov/readingroom)


UNDER TASK ORDER NO. C, THE PROTOTYPE FULL-SCALE (ABOUT 3,500 CU FT) HYDROGEN GENERATOR HAS BEEN OPERATED AND EVALUATED, AND MINOR MODIFICATIONS HAVE BEEN MADE.

Document Type: 
CREST [1]
Collection: 
General CIA Records [2]
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-03642A001300010052-9
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
5
Document Creation Date: 
December 22, 2016
Document Release Date: 
May 31, 2012
Sequence Number: 
52
Case Number: 
Publication Date: 
August 15, 1958
Content Type: 
LETTER
File: 
AttachmentSize
PDF icon CIA-RDP78-03642A001300010052-9.pdf [3]198.85 KB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2012/05/31 :CIA-RDP78-03642A001300010052-9 co~v~~a~~~r~~~ In replying please addrosa3 August 15, 1958 IInder Taak Order Na. C, the prototype full-scale (about 3,500 cu ft) hydrogen generator has been operated and evaluated, and minor modifications have been made. On the basis of your technical ropresentativoa' comments during and followi~-g a recently conducted experiment in the prototype full scale unit, it appears, in general, that the unit incorporates the desired features and characteristics, and operates satisfactorily. Thus, the experi- mental activity under this Task Order has been 8ubstantialiy concluded. It is proposed herein that provision be made under Task Order No. C for additional effort directed toward the formu- 2ation of a recommended procedure to be fallosred by an operator when running the prototype hydrogen generator under actual service conditions. Aa described by your technical representatives, some of the service conditions under which a hydrogen-generator unit of this typo is likely to be used cannot be oompletely specified at this time; also, some of them could represent rigorous factors in relation to the chemical reaction or reactions on the 6aaia o! which the prototype unit has been designed and developed. It is TY~ _52.~ ~'# ~._ NeXT REY _,fi,Q.l1- ACTH WR 1s?2 Declassified in Part - Sanitized Copy Approved for Release 2012/05/31 :CIA-RDP78-03642A001300010052-9 Declassified in Part - Sanitized Copy Approved for Release 2012/05/31 :CIA-RDP78-03642A001300010052-9 co~F~a~n~T~aL August 1S, 1958 currently anticipated, for example, that variations in the amount and/or type of impurities present in the water used, and also in the temperature of the water at the time of a particular operation, must be considered and provided for in the formulation of an operating procedure for the prototype generator unit. Further, because of the limitations imposed by some of the specifications stated originally by your technical represent- atives for this development, the design of the prototype unit is such that certain steps in the procedure are critical to the effective generation operation. It is particularly essential that ouch steps be detailed appropriately in the operating procedure, so as to minimize the possibility of the operator erring in carry- ing out the instructions. In view of the above, it is contea~platefl that, in the formulation of the operating procedure, the full-scale-experiment data would be analyzed in the light of the results obtained from the 1/5- and 1/lp?scale experiments. If necessary, adjustments would be ma~3e in the previously determined relationship betvreen cataly+~t concentration and initial temperature (for a particular total-generation time of interest). Then, the prooedure far operating the prototype unit that would reflect the previously gained experience in handling the unit and conducting the basic chemical reaction or reactions would be detailed, step by step with appropriate notes and precautions included, where necessary, to facilitate the effective operation of this unit. Efforts would ~~~~~~T~~~~ Declassified in Part - Sanitized Copy Approved for Release 2012/05/31 :CIA-RDP78-03642A001300010052-9 Y '~~i Declassified in Part - Sanitized Copy Approved for Release 2012/05/31 :CIA-RDP78-03642A001300010052-9 Auggst 1,5, 195 CONFI~EI~T~AL be made to present the instructions in ffiimple, aoncise~ easy-to- understand phraseology, and to provide suitable and effective illustrations. At the aonaluaion of the proposed research period, a summary report would be prepared and submitted. This report would include a description of the experiments conducted and the results obtained, and also, in accord with the recent discussion with ?your technical representatives, the operating procedure described abavs. During the cause of the proposed effort, liaison would be maintained with your tsahnical representatives during their periodic visits and/or via telephone. It is hereby proposed that the Task Order No. C agreement be amended to provide for an additional four-month effort, as described above, directed toward the formulation of an effective operating procedure for the prototype hydrogen generator. It i,e also proposed that the amendment provide for an increase in the estimated appropriation oY $3,I19, which includes an increase in the fixed fee of ~1??? ~ general breakdown of the estimated appro- priation increase ie attached. Of course, the proposed amendment would continue our period-basis research agreement, consistent with our current contractual agreements. it is currently expected that, on the basis of the experi- mental data obtained and the experience gained in handling the experimental 1/5-scale and the prototype full-scale generator units, CC ti F ~F~T~~L Declassified in Part - Sanitized Copy Approved for Release 2012/05/31 :CIA-RDP78-03642A001300010052-9 .,,R , ?m ~ ~'_~ Declassified in Part - Sanitized Copy Approved for Release 2012/05/31 :CIA-RDP78-03642A001300010052-9 ~ ~ ~~? ~ ~ ~"CQN~I~ENTIAL August 15, 1958 it will be possible to prepare a set of simple, concise, relatively foolproof operating instructions for ultimate use in connection with actual operations. It would be extremely expedient to have available the prototype full-scale generator unit for use in connection with the proposed effort. Consequently, it is contemplated that the prototype unit would be shipped to your technical representatives toward the end of the proposed research period. Ii your technical repreaent- ativea should have need for the prototype snit sooner, then, on the basis of mutual agreement, this unit would be furnished to them as quickly as possible. ~e would appreciate any efforts that might be made to expedite consideration of the proposed amendment, ao as to minimise the lapse in continuity of our activity under Tank Order No. C. If you should have any questions with regard to the additional effort proposed herein, please do not hesitate to call us. Any inquiries of a contractual nature may be directed to Extension 159? Very truly yours, In Duplicate C~f~~~~E~iT~~~ Declassified in Part - Sanitized Copy Approved for Release 2012/05/31 :CIA-RDP78-03642A001300010052-9 25X1 Declassified in Part -Sanitized Copy Approved for Release 2012/05/31 :CIA-RDP78-03642A001300010052-9 Declassified in Part -Sanitized Copy Approved for Release 2012/05/31 :CIA-RDP78-03642A001300010052-9

Source URL: https://www.cia.gov/readingroom/document/cia-rdp78-03642a001300010052-9

Links
[1] https://www.cia.gov/readingroom/document-type/crest
[2] https://www.cia.gov/readingroom/collection/general-cia-records
[3] https://www.cia.gov/readingroom/docs/CIA-RDP78-03642A001300010052-9.pdf