Published on CIA FOIA (foia.cia.gov) (https://www.cia.gov/readingroom)


REPARATIONS ORDERS FOR DELIVERY IN 1953-1955 TO THE USSR

Document Type: 
CREST [1]
Collection: 
General CIA Records [2]
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A002700980004-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
7
Document Creation Date: 
December 22, 2016
Document Release Date: 
March 11, 2011
Sequence Number: 
4
Case Number: 
Publication Date: 
November 13, 1953
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A002700980004-1.pdf [3]318.4 KB
Body: 
Sanitized Copy Approved for Release 2011/03/11: CIA-RDP80-0081OA002700980004-1 / t --:/- /-') CENTRAL INTELLIGENCE AGENCY INFORMATION REPORT COUNTRY East Germaz{r SECRET/CONTROL - U.S. OFFICIALS ONLY SECURITY INFORMATION This Document contains information affecting the Na- tional Defeneo of the United States, within the mean- ing of Title 18, Sections 793 and 794, of the U.S. Cpde, as amended. Its transmission or revelation of its contents to or receipt by an unauthorized person is prohibited by law. The reproduction of this. form is prohibited. Reparations Orders for Delivery in 1953 - 1955 to the USSR REPORT DATE DISTR. NO. OF PAGES REQUIREMENT NO. REFERENCES THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE, THE APPRAISAL OF CONTENT IS TENTATIVE. (FOR KEY SEE REVERSE) 7 RD SECRET/CONTROL - U.S. OFFICIALS ONLY STATE _ I X I ARMY I X I IFAVY I X. l A IR I X I FB I (Note Washington Distribution Indicated By "XI I; Field Distribution By "#".) 13 November 1953 Sanitized Copy Approved for Release 2011/03/11: CIA-RDP80-0081OA002700980004-1 !14:,r Sanitized Copy Approved for Release 2011/03/11: CIA-RDP80-00810A002700980004-1 SECRI/CONTROL - U.S. OFFICIALS ONLY -2- The following additional reparations orders have been received by the East German Amt fuer Reparationen for delivery in 1953 Contractor Commodity 'Weight (tons) Delivery date VEB Sachsenwerk Radeberg, power measuring generators'.. model LMS-522'. 2 + it sets spare parts) 20 December 541.0 2 + 4 522-.' 5 + 10 " " ) " 541- 5+ 10" 3.5 551: 5p1011 VEB Sachsenwerk Radeberg 125 power measuring generators: ` model LMS-522 + 250 sets spare parts 20 15 Octobero125 15 December.-g2,50 VEB Funkwerk Dresden 10 tube voltmeters type 51[ 4) 30 sets spare stabilizers ) (30 June 22 (15 December "Laschkammern" type EL 601-NS) ( ? VEB Messgeraetewerk Zwoenitz 30 measuring instruments model LU (?) 40 Kg (each) 30 June 5 twin-beam osciliographs, type 2 84-721) 15 spare oscillograpns 15 sets spare bulbs ) 5 photo cassettes, type FE-721 ) 2 projection cassettes, type RE 721 ) 9 spare oscillograph tubes, type OR 2/100/2/6 9 spare bulbs for oscillographs, type 2 R0-721 )October=December (?)) VEB Sachsenwerk Radeberg 6 power measuring generators and 12 sets spare parts, model LMS-522 0.96 15 December 40 power measuring generators and 80 sets 30 September-4O spare parts, model IMS-522 6.4 15 November=8O VEB Messgeraetewerk Zwoenitz 5 CI transmitter ('Geber") type DN-10) 5 devices for dynamic balancing ) 5 photo cassettes, type FE 711 ) 0.24 30 August -1955 e.1 Sanitized Copy Approved for Release 2011/03/11: CIA-RDP80-00810A002700980004-1 Sanitized Copy Approved for Release 2011/03/11: CIA-RDP80-0081OA002700980004-1 Contractor VEB Funkwerk Koepenick Commodity Weight(tons) Delivery date 1 twin-bean cathode oscillograph, type OG 2-6/52 15 oscillographs, type OG 2-1/52 4 15 sets spare parts 1 twin beam cathode osci]lograph, type 2-6/52 3 sets spare tubes and stabilizers 3 mains supply cables 3 sets spare tubes and stabilizers 8 twin-beam cathode osc llu iph, type 24 sets spare tubes and stabilizers $ mmin$ supply cables 3 Neumann recorders, type DS ch lla 9 sets spare tubes 15 December 30 September 30 Sept e-r r 1 seven-loop oscillograph with 1 set accessories oscillographs 1 r r r r r r r r r 1 r r - N r ii 1 - in NW: accessories in August (paper in rolls of 35 m. x 120 a., 600 rolls) 1 seven-loop oscillograph with i set accessories oscillograph in s i (paper in rolls of 35 in. x 120 mm., 600 rolls) e Rapt, accessor in August Yessgeraetewerk ..?.. Schwermaschinenbau G. Dimitroff (SAG Amo), Magdeburg 9 recorders Model D Sch 1 1 and 27 sets spare tubes 1 single stage spurred wheel gear complete with spare parts 30 October Henry Pels (SAG i`ransmasch), 1 circular saw and 1 rectangular cuttixg machine 163.6 ? -25 November ? Schrermaschinenbau 7. October 1 chain conveyor with spare parts 45.14 30 November (SAG Amo), Magdeburg Schwermaschinenbau K. Liebknecht 1 plate stacking equipment with spare 135.5 ? 30 October (SAG Amo), Magdeburg parts S r/CONTROL - U.S. OFFICIALS ONLY Sanitized Copy Approved for Release 2011/03/11: CIA-RDP80-0081OA002700980004-1 I, Sanitized Copy Approved for Release 2011/03111: CIA-RDP80-0081 OA002700980004-1 C o n t r a c t o r Gelow3dity leight(tone) Delivery date Henry Pels (SAG Tranamasch), 2 plate truing machines, 1.5 ? 6 x 1550 m., 42.555 (?) 25 November Erfurt - co^plete with spare parts. Zeshag (SAG Transsasch), Zeits sections for rolling will equipment 160.7 Schnermaschinenbau Z. Liebknecht 1 feeding device without electrical 151.8 (SW Ammo), Magdeburg equipment VE3 Yerkstoffpraehwwcbinen, Leipzig 2 universal 1400 ton breaking test nachine model ZEWb with accessories VE8 Merkstoffpraefsaschinen,. Leipzig VE3ierkstofJraefaaschinen, Leipzig VW larkstoffpruef aschine% LejVzj VE3 ierkstoffprnehascWUmen, Le-ipsi VEH , Le lpsig VBB Yasdnnenfabrik Halle VE8 lasclnneufabrik Jobn Scheer Ieuselwmits Schuermschinen S.Y. $iram (SING Trammasch), Leipzig VE8 Leipziggerr Stahlban and Verzlawrei, Leipzig 2 machines for testing dynamic metal fatigue, complete MMht elects ie November-October i3O 30 May 1953 3.5 egWjment. 6 universal testing machines, model ZM 30b 11.14 7 universal testing machines, model = 5000 114.7 6 universal testing machines, model i130000 11.4 10 steel testing machines," model 5000 (?) 7.3 1 tube cold-rolling saehi.ne HPt-55-8, 86.14 (?) complete with electricatl equipment and spare parts 2 tube cold-rolling machines HPT 32 1, 110.676 ~ pith electrical equipment and 1 brace crane,- capacity 5 tom, 15.025 (7) span b.o m., complete with electrical equipment and spars; parts 10 depressed center flatcars, capacity 120/100 tons 610 31 May 1953 2 machines - 10 Janwr~ 14 machines - 20 August 30 MW 15 August 30 MW 15 larch 1954. 1 = 30 January 1 IM25Febrmryl 30 31 January 133 28 Februaayl954-3 31 March 195" SEM - U.S. GnmmALS OILY 50X1-HUM Sanitized Copy Approved for Release 2011/03111: CIA-RDP80-0081 OA002700980004-1 Sanitized Copy Approved for Release 2011/03/11: CIA-RDP80-0081OA002700980004-1 SI RET/CONTROL U.S. OFFICIAIS ONLY Contractor Commodity Weight(tons) Delivery date VEB Xaggonbau Dessau 2 grasps all-metal four-axle refrig~ October 1953 - 1 group erator cars - (1 group m 1 crew coach November 1953 -1 group plus mechanical equipment and 4 refriger- ator coaches) VEB Mathias-Thesen-ierft, repairs to motor vessel MARIA ULYANOVA Wi mar 1955 2. The following amendments to reparations orders have been receivedo Amendment 50X1-HUM 47(?) gearings, am tided on 21 March 1953 to 81 gearings. CVEB Peniger MaschinenfabrikD 6 automatic switching stations 50X1-HUM each 7.5 tons, amendment.of 21 April 1953 2 automatic cutters, amended on L May 1953 to 2 eccentric presses, 2.25 tons.CVEB Blechbearbeitungsmascl-.inenwerk Au0 Original order amended on 22 April 1953 to 1 sample coach for delivery 30 June (?), 50X1-HUM Setember Waggonbau Goerlitz, assenger coaches fm delivery on 30 p d 6 ('?) p an 75 passenger coached) Original order amended on 1 April 1953 to 1 sample col and 2 passenger coaches, for delivery 25 December (?), coaches) Sanitized Copy Approved for Release 2011103/11: CIA-RDP80-00810A002700980004-1 CVEB Naggonbau Weimar, 400 coal cars 20 cars on 28 February 1953 30 " " 30 March 1953 30 " " 30 April 1953 25 " " 30 May 1953 25 " " 30 June 1953 30 " " 30 July 1953 30 " " 30 Argues 1953 10 " " 30 September 1953 ch for delivery on 22 November (?)A 5 CVEB Waggonbau Goer1itz, 2 .pas 50X1-HUM eager Of this order 10 refrigerator cars have been cancelled, amerximent of 20 May 1953. L VEB Maggonbau Dessau, 1,1455 cars) According to anrdment of 26 April 1953q 200 cars were cancelled9 of the remaining 2009 delivery as follows: Sanitized Copy Approved for Release 2011/03/11: CIA-RDP80-0081OA002700980004-1 -6- Amendment According to amendment of 21 April 1953.9 150 frei d; deliveries as follows: 25 cars on 30 July 1953 25 cars on 30 August ]%3 According to amendment of 26 April 1953 cancelled. [Sehwermaschinenbau S.M. Kirow (SAG Transmasch),Leipzig, 1 crap] According to amendment of 30 May 19539 350 railroad cars cancelled; deliveries as follows: 50 cars on 30 April 1953 CVEB Waggonfabrik Ammendorf, 437 passenger coaches?] 3 b2 M M 77 u-_ , 95 23 M M 30 June 1953 50X1-HUM According to amendment of 23 April 1953 new delivery dates. I on 30 August, 1 on 10 September CVEB Kranbau, Eberswalde9 2 cranes) 25 refrigerator trains (refrigerator train comprises 1 diesel-electric generator car, 1 equipment car., 1 crew coach, 8 trains in October ) 9 M M November ) 8 M M December Original order for 1 bracket-rotary crane cancelled by amendment of 21 April 1953. Original order for 26 ships ammended on 20 April 1953 to 23 ships; delivery as follows-. 15 July 1953 P- 1 5 September 1953 1 15 October 1953 . 1 1954-55 - 20 [' Schiffswerft Fuerstenberg (Oder), 149 seat passenger motor ships] Original order for 20 ships amended on 30 April 1953 to 18 ships, delivery as follows: 25 September 19530 1 20 November 1953m 1 .1954?55 e .remainder CVEB Mathias-Thesen erft9 Wismar, motor ships for internal traffic' Original order for 38 ships amended on 20 April 1953 to 34 ships, delivery as follows: 25 August 1953 1 20 October 1953 1 1951-55 ? remainder CSchiffswerft Magdeburg., 196 seat passenger motor ships) 50X1-HUM 50X1-HUM Sanitized Copy Approved for Release 2011/03/11: CIA-RDP80-0081OA002700980004-1 Sanitized Copy Approved for Release 2011/03/11: CIA-RDP80-00810A002700980004-1 SEuRm/CONTROL - U.S. OFFICIALS ONLY -7- Original order for 8 ships ameuied on 30 April 15 July 1953 - 1 15 August 1953-- 1 15 September 1953 - 1 15 November 1953 - 1 CVEB Schiffswerft Neptun Rostock, 6620 ndment 1953 to 4 ships, delivery' as follows: ton ocean freighters) Original order for 5 ships cancelled by amendment of 30 April 1953 CEB Schiffswerft Fuerstenberg, 67.8 ton fishing cutters) Original order for 6 ships cancelled by amendment of 20 April 1953 CVEB Volkswerft Stralsund, 465 ton fishing luggers) Instead of 150o tons-of potassinn ammonium nitrate, amended on 24 April 1953 to: 31.3 - 500 tons) 30.4 - 1500 31.5 -1500 30.6 - 1000 31.7 - 800 5300 " ) According to amendment of 30 April 1953, cane CSchlrermaschinenbau Ernst Thaelmannwerk (SAG (;omment: The material is transmitted as received; the iled.for 1953; diiver in 1)54? 1 on3n May and 1 on 30 June. Amo), Magdeburg, 2 crane] year in the delivery date in some cases was not specified. SECRET/CONTROL - U.S. OFFICIALS ONLY Sanitized Copy Approved for Release 2011/03/11: CIA-RDP80-00810A002700980004-1

Source URL: https://www.cia.gov/readingroom/document/cia-rdp80-00810a002700980004-1

Links
[1] https://www.cia.gov/readingroom/document-type/crest
[2] https://www.cia.gov/readingroom/collection/general-cia-records
[3] https://www.cia.gov/readingroom/docs/CIA-RDP80-00810A002700980004-1.pdf