Published on CIA FOIA (foia.cia.gov) (https://www.cia.gov/readingroom)


BAUTZEN-LITTEN AIRFIELD

Document Type: 
CREST [1]
Collection: 
General CIA Records [2]
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A002800080001-5
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 27, 2016
Document Release Date: 
May 9, 2013
Sequence Number: 
1
Case Number: 
Publication Date: 
October 16, 1953
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A002800080001-5.pdf [3]139.04 KB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2013/05/09: CIA-RDP80-0081 OA002800080001-5 60' Fa ~'r. f~rrav~r TOM Lau-taen-Li.tten Airfield. REIARKS - E ALW\TiOi\L DATE OF COHTE1&L DATE OBTAINED REFERENCES..,, PAGES 4-ENCLO URES -REPORT DATE PREPARED 3-6 October .1951 10 Between. 16 August and Scember 1953, no ?. _,:craft or air activity was ob- served at Bautsen=-Litten airfield. Two cement mixers were used in the southwestern section of the field where a taxiway was being built0 No 14o:& i as being done or. the runway ihieh was co rered with runway rats, On some spots, grass was growing on he runway. 1:3ork on the ta.xiway was being done )nay. by Soviets, as had formerly been observed on the runway, Sand for.the taxiway was hauled on tipping tricks from Schafbbera near Niederkaii a. h F a concrete apron was located about 150 meters nor t:h of the road, that poles, 70 to 80 cm apart, with foam extinguishers were aloe the ed of the area, and. that work was 1eing accelerated there,. 77]a fuel du was under constructi.on0 .Ambulance and truck was. bei -;,.. done by the 13auunion Sued. During the day.and at night, work was conducted and a dredge; 'and four tipping trucks were used on a construction site just' be?find the wall north of Neupurschwit z, Throughout the day on 22 August, sand was being ;trucked to the section of the field north of Net ~ purschwitz At this site, four large heaps of sand, each 20 meters long and 305 meters nigh,, were observed on 31 Augusto pied by aircraft or used by aircraft from other fields. Construction work 50X1-HUM x 20 During the period from 17 August and 4 September,. the airfield was not occt > 30 The airfield was still. unoccupied on 12 Usptember. Work was under way, The two temporary buildings at the two sides of the northern entrances were torn down, the entrance gates were removed, and the gap in the fence was closed0 A sentry wearing blue collar patches and arr..ed with a rifle was posted at the southwestern entrance and a worker was charged with opening and closing the.. entrance gate in the southeastern section of the fieldo CLASSU9CATI0N STORP ,, Declassified in Part - Sanitized Copy Approved for Release 2013/05/09: CIA-RDP80-0081 OA002800080001-5 Declassified in Part - Sanitized Copy Approved for Release 2013/05/09: CIA-RDP80-0081 OA002800080001-5 I 50X1-HUM. 54 ME71 50X1-HUM ~C r t, the report indicates that construction work at Eautzers- Litten airfield apparently continues to a lignited extent. No information has been received whether repair vork was conducted on the auxiliary runway covered with '?unway rats which Q as reported pre vio-asly f, is not serviceable for jet aircraft. it is possible that, the runway will r?e- main in the present status as the VPL pilots are not trained trained in jet air- 50X1-HUM . Declassified in Part - Sanitized Copy Approved for Release 2013/05/09: CIA-RDP80-0081 OA002800080001-5 ,

Source URL: https://www.cia.gov/readingroom/document/cia-rdp80-00810a002800080001-5

Links
[1] https://www.cia.gov/readingroom/document-type/crest
[2] https://www.cia.gov/readingroom/collection/general-cia-records
[3] https://www.cia.gov/readingroom/docs/CIA-RDP80-00810A002800080001-5.pdf