I WF:FbRM-FA TI ON REPORT
This material contains information affecting the
National Defense of the United States within the
meaning of the Espionage Laws. Title 18, U. S. C.
PREPARED AND DISSEMINATED BY
Secs. 793 and 794, the transmission or revelation
f hic in any manner to an unauthorized per-
CENTRAL INTELLIGENCE AGENCY
- pr ited by law.
COUNTRY
R PO N0.
India
SUBJECT
Photos
of Construction of Butcher ]fan
ATE DISTRI
Fetr-.3leum Terminal
NO. OF PAGES 2
79- NCLS?
!-~
25X1A6a
SUPPLEMENT TO REPORT #
PLACE AC UIRED
B source)
ONSIY TO
00/G-
DAT
onrce) DATE OF INFORMATION (Date or dates, a or between which,
events or conditions described in repor existed)
may
May 54
25X1 X6 THIS IS INFORMATION
SOURCE
/On file in Graphics Register are the following photographs of construction
of fac
ilities at Butcher Island Terminal:
17-15
European Executive Homes. (Standard Vacuum Refining Co) Ci*-f53 '94-
17-19
Same as above
17-1
Small mooring caisson for Oil Berth #1 ",A -15:5104-
-17-17
Same as above C/A -I'S"3`703
17-3
Four Boiler House Stacks
17-16
Boiler House on left clad -15 3by 1
17-18
Fraction tower in center 61,9-153(093
17-2
Laying 16" pipeline. Butcher Island on left weld being made in center.
17-11
16" pipeline on shore side Butcher Island
17-14
Same as above
17-8
Same as above ci'*-i5~702
17-21
Same as 17-2 welding 16" pipeline off Butcher Island cl.1-t5 37o i
17-13
Large caisson on left being floated into position for Oil Berth #1
Butcher Island U4 -I53-10S
17-5
Large caissons in position for Oil Berth #1
17-22
Same as above
17-4
Same as above
17-12
Standard Vacuum Refining Co pumphouse located alongside Pir Pau
'
1 C-,
jetty about five hundred feet distant. CiA -1 53
17-9
Water pumphouse jetty showing Pir Pau jetty on right, water line on
left side and 20" temporary crude line on right side jetty wbihh
is connected with Pir Pau berth. CM,_, 9:5-
17-25
Tanker at Pir Pau taken from water pumphouse jetty. However reverse
side of photo is shown since Pir Pau is located on right side
of water pumphouse jetty. C/,4 -15361'1
17-7
Butcher Island jetty with #1 main caissons in position showing natives
placing fill in caisson on left side. eM-/5510(0
=17-20
Pumphouse (water) construction for Shell Refinery showing Benoto rig on
right, which consists of a hollow tube projected down into bay and
a derrick which lowers a bucket with jaws down into tube removing
sand, silt, etc to prepare bottom for pumphouse supports. The
jaws shown in black on right of picture operate similar to
mechanical catch basin cleaners used by City of New York to clean
street sewers.
17-29
Inspecting 2I+",pipeline breaks
17-6
c,.'-/5Y7&)
17-10~
Sections of 2I+" pipeline recovered from bottom of harbour.
17 -30 )
17-23()
17-24
Launching 16" line from Trombay to Butcher Island showing preparations
-
17-26
C/A -1s-s40ys
on Trombay end+]
11 ' Z~
c14 -/5369 ' -end-
25X1A2q
s/,de.$ SUpfl/Emtq F4i.7 f a
e0 ,. l8 Alm/` S - U6 0 ...- ONLY
APE V~'CT- C; Tg It It shall not be transnutted
oncerrence o the or ginating o ice has been obtained through the Assistant Director for Collection and Dissemination, CIA.