Sanitized Copy Approved for Release 2010/03/29: CIA-RDP79TO1184A000200310001-4
Top Secret
NATIONAL PHOTOGRAPHIC
INTERPRETATION CENTER
PHOTOGRAPHIC
I NTERPRETATION
REPORT
KUZNETSOVO ENGINE TEST FACILITY
USSR (S)
Top Secret
25X1
PI R-027/79
APRIL 1979
25X1
Copy 13 3
Sanitized Copy Approved for Release 2010/03/29: CIA-RDP79TO1184A000200310001-4
Sanitized Copy Approved for Release 2010/03/29: CIA-RDP79TO1184A000200310001-4
Sanitized Copy Approved for Release 2010/03/29: CIA-RDP79TO1184A000200310001-4
Sanitized Copy Approved for Release 2010/03/29: CIA-RDP79T01184A000200310001-4
Top Secret RUFF 25X1
25X1
KUZNETSOVO ENGINE TEST FACILITY, USSR (S)
1. (S) This report provides an initial description of the Kuznetsovo Engine Test Facility in
the USSR. This report includes a location map, one annotated photograph, and a line drawing.
DESCRIPTION
2. (S) The Kuznetsovo Engine Test Facility , formerly the Kuznetsovo 25X1
Probable Aircraft Engine Test Facility, is situated in a level, heavily-wooded area 32.5 nautical
miles (nm) southeast of Moscow (Figure 1). This facility is 12.5 nm east-southeast of the Ramen-
skoye Flight Test Center and 4.5 nm north-northwest of the Faustovo Aerospace 25X1
Research and Development Facility There are direct rail and road connections 25X1
between the Kuznetsovo facility and the Faustovo facility.
3. (TSR) The Kuznetsovo Engine Test Facility (Figure 2) was in the midstage of construc-
tion when last observed on imagery acquired in August 1978. At that time, the facility occupied a
partially secured area of approximately 35 hectares and consisted of 29 buildings and structures.
The facility is road and rail served with two road entrances and one rail entrance. No special
security measures, i.e., guard towers, lights, or security dog kennels, were observed. An electrical
power substation is approximately 75 meters west of the facility.
-1-
Top Secret
Sanitized Copy Approved for Release 2010/03/29: CIA-RDP79T01184A000200310001-4
Sanitized Copy Approved for Release 2010/03/29: CIA-RDP79T01184A000200310001-4
Sanitized Copy Approved for Release 2010/03/29: CIA-RDP79T01184A000200310001-4
Sanitized Copy Approved for Release 2010/03/29: CIA-RDP79TO1184A000200310001-4
Top Secret RUFF
25X1
)FY-1
25X1
2~DAI
25X1
25X1
LOA I
FOOTINGS
--- HIDDEN PARTITION
FIGURE 3. TEST CELLS AT ENGINE TEST BUILDING UNDER CONSTRUCTION AT KUZNETSOVO ENGINE TEST
FACILITY
4. (TSR) As of August 1978, 23 of the 29 buildings and structures at Kuznetsovo Engine
Test Facility were complete (Figure 2). The completed buildings included a large, oil-fired heating
plant, a large rail-served transshipment building, three shop buildings, two maintenance build-
ings, three vehicle storage buildings, a fuel oil pumping/metering station, and four general-pur-
pose support buildings. Structures considered to be complete in August 1978 included two above-
ground fuel oil storage tanks, an earth-mounded storage bunker, two masonry stacks, an under-
ground water storage tank, and two general-purpose support structures. The six buildings and
structures under construction in August 1978 included a large assembly/checkout building, a large
engine test building, an administration/engineering building, a fire station, a shop building, and
an underground water storage tank. (The inset table on Figure 2 shows the major buildings and
structures, both complete and under construction, at the facility.)
5. (TSR) The most prominent feature of the Kuznetsovo facility is the complex formed by
the engine test building, the assembly/checkout building, and the administration/engineering
building (Figure 2). Construction observed between March 1976 and August 1978 indicates that
this complex will cover approximately 6.1 hectares or 17.4 percent of the Kuznetsovo facility.
6. (TSR) The engine test building (item 2, Figure 2) was in the midstage of construction
when last observed in August 1978. Construction progress observed at that time indicated that the
engine test building would contain at least 16 engine test cells and eight control/shop sections.
However, ground scarring/survey marks observed in August 1978 indicated that this building
could contain as many as 24 engine test cells and 12 control/shop sections. This building should
contain at least of floorspace. 25X1
7. (TSR) Each test cell (Figure 3) will have an overall length of approximately
25X1
The test chamber in each test cell will be approximately Each test chamber
25X1
will have a primary and a secondary air inlet. The primary air inlet will be approximately
25X1
with an air shaft of approximately The secondary air inlet will be
25X1
approximately with an air shaft of approximately Each air
25X1
inlet will be protected by a stationary roof cover. The roof cover for the primary air inlet will be
approximately and that for the secondary air inlet will be approximately 0
25X1
Construction progress in August 1978 indicated that the roof covers on the air
25X1
intakes of adjoining test chambers will be connected and appear to be one unit.
-3-
Top Secret
25X1
Sanitized Copy Approved for Release 2010/03/29: CIA-RDP79TO1184A000200310001-4
Sanitized Copy Approved for Release 2010/03/29: CIA-RDP79TO1184A000200310001-4
Top Secret RUFF
8. (TSR) Each control/shop section will be approximately The test
control/monitoring station in each control/shop section will probably be capable of simultaneously
monitoring test activity in two test chambers. The shop space in each control/shop section will
probably be used for checkout and preparation of the test article prior to its insertion into the test
chamber, as well as preliminary checkout of the test article after the test has been completed. It
could also be used for repair and maintenance of those items that can be removed from the test
chamber.
9. (TSR) The assembly/checkout building (item 5, Figure 2) will consist of a two-story
engineering/shop section and a single-story, high-bay assembly/checkout section. When com-
pleted, this building will contain approximately of floorspace. Ground
scarring/survey marks adjacent to the western end of the building may be an indication of the
addition of a multistory administration/engineering section with at least of
floorspace per floor. The three-story administration/engineering building (item 4) will contain
approximately of floorspace when completed.
10. (TSR) The size of the test chambers and the exhaust systems under construction at the
Kuznetsovo facility indicate that the engine test cells were designed to accommodate engines
requiring a high-mass airflow. Engines in this category include the following: (a) high-bypass-ratio
engines required by the Soviet aircraft industry, (b) engines required by the Soviet missile indus-
try for endoatmospheric missiles and missile stages, and (c) a combination rocket-airbreathing
engine that could be utilized in a reusable launch vehicle. Engine test cells similar in size to those
under construction at the Kuznetsovo facility are also present at Omsk Aircraft and Missile
Engine Plant Baranova 29 and at Omsk Rocket Engine Test Facility Gornaya
Bitiya The engine test cells under construction at Tyumen Aircraft Engine Plant
are also similar in size to those under construction at the Kuznetsovo facility.
11. ~ At the present time, there is no evidence to suggest that the Kuznetsovo
facility is associated exclusively with the testing of aircraft engines or is associated exclusively
with the testing of missile/rocket engines. However, it is highly probable that the Kuznetsovo
facility is a planned expansion of the engine test facilities at the Faustovo Aerospace Research and
Development Facility and will be used as a remote testing facility for both aircraft and missile/-
rocket engines. Suggesting this association is the fact that while the Faustovo facility is the
primary testing facility utilized by V.N. Chelomey, a leading Soviet missile designer, it has also
been used as a remote testing facility by some of the Moscow-based aircraft design and testing
organizations.' Other indications of an association between the Kuznetsovo facility and Faustovo
facility include their proximity (4.5 nm apart) and the fact that direct road and rail connections
exist between the two facilities.
DMAAC. US Air Target Chart, Series 200, Sheet FP0167-5HL, 5th ed, Oct 78, scale 1:200,000 (SECRET
1. NPIC. RCA-09/0023/76,
ties, May 76 (TOP SEC
RELATED DOCUMENT
NPIC. RCA-
SECRET
REQUIREMENT
Project 130065NJ
(S) Comments and queries regarding this report are welcome. The may be directed to
Pact Forces Division, Imagery Exploitation Group, NPIC,
-4-
Top Secret
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
2bAl
25X1
2bAl
25X1
25X1
25X1
25X1
25X1
2bA-i
Sanitized Copy Approved for Release 2010/03/29: CIA-RDP79TO1184A000200310001-4
Sanitized Copy Approved for Release 2010/03/29: CIA-RDP79TO1184A000200310001-4
Top Secret
Top Secret
Sanitized Copy Approved for Release 2010/03/29: CIA-RDP79TO1184A000200310001-4