1XI 1 Reled9e,Q00AM644 ? CIAT P97" S a(5q
GROUPI
PERSON/UNIT NOTIFIED SECRET
fxCLYUfO SS.SI AYT.MIIITIC
I
(When Filled In) I/wNIUIIINS AI I
S[CLASSIFKATIIN
ADVANCE COPY ^ ISSUED SLOTTED
INDEX: ^ YES ^ NO
CLASSIFY TO FILE NO.-
X?REF TO FILE NO._y.
DISSEM BY PER
mac.. wrv
25X1 A 7 RID COPY
FILE. VR,
25X1A S E C R E T 2008172 FEB 69 CITE
25X1A
o6-S 1 S z ccs 7-
1. UPS FLYWHEEL WILL BE READY TO SET ON 24 OR 25 FEBRUARY,
HOWEVER , NYLON SLING AND SOME OF THE SPARE PARTS HAVE NOT
t(
YET ARRIVED o
2. COMPLETE INSTALLATION INSTRUCTIONS ALSO HAVE NOT
BEEN RECEIVED. THE ONLY DRAWINGS INCLUDED IN PACKAGE WERE
THREE ELEVATION AND ONE FOUNDATION DRAWING. A VERY BRIEF,
FOUR-PAGE, SET OF INSTRUCTIONS WERE RECEIVED , BUT IT HARDLY
SEEMS SUFFICIENT. IN THESE INSTRUCTIONS, REFERENCE IS, MADE
R
TO A MORE COMPLETE INSTRUCTION MANUAL WHICH WE DO NOT HAVE . c
DC
WE ALSO DO NOT HAVE A UPS OPERATION MANUAL OR ANY UPS CONTROIEx
SAC
25X1A CABINET WIRING DIAGRAMS. SUGGEST BRING THESE ITEM__.._
ART'
25X1A WITH HIM. -RO
25X1A 3 o RE THE-SYSTEM 2 SWITCHGEAR , IT APPEARS THAT 2
AP
THERE IS NO NEUTRAL BUS AND ONLY A SMALL UNTAPPED , UNINSULAT.P
GROUND BUS AT THE BOTTOM OF THE CABINET. THERE IS NO IN
PR
CONVENIENT POINT OF CONNECTION FOR LINE AND LOCAL NEUTRALS. RE
25X1A
Approved For Release 2000/06/145 T8-06505A000500040027-9
App ov-eAJF.c F,Releasec2QQQl06i E CIA-RQRt7 505A000UQQ"2?A,9 - SEEN BY
ADVANCE COPY ^ ISSUED ^ SLOTTED
25X1A
25X1A
25X1A
25X1A
25X1A
D RID COPY
SECRET
GROUP I
ERCLuOEO IOM AOTOMATIC
OOMMOMAOIM AM
0[CLASSIFICATION
INDEX: ^ YES ^ NO
CLASSIFY TO FILE NO._
X?REF TO FILE NO.
FILE RID ^ RET. TO BRANCH ^ DESTROY ^ SI
PA GE 2 1926 S E C R E T
IT IS SUGGESTED THAT -
LOOK INTO THIS AND
POSSIBLY CONFER WITH -? A NEUTRAL BUS COULD PROBABLY BE
LOCALLY FABRICATED OF COPPER OR ALUMINUM IF A MANUFACTURER'S
SHOP DRAWING WERE PROVIDED. COULD POSSIBLY BRING
THIS WITH HIM. DRAWINGS ON COPPER AND ALUMINUM WOULD BE
PREFERRED
SHOULD BE ADVISED THAT FROM THE SETTING OF
THE FLYWHEEL T O COMPLETION OF THE SWITCHGEAR INSTALLATION
WILL PROBABLY BE ABOUT 4 WEEKS. A PROJECTED SCHEDULE IS AS
FOLLOWS:
FL YW HEEL SET 24 FE B
UPS CABLING COMPLETED 28 FEB
OLD UPS REMOVED 5 MAR
DEMOLISHING AND FINISHING 10 MAR
SWITCHGEAR IN PLACE 12 MAR
SWITCHGEAR WIRING 21 MAR
SYSTEM CKOUT & TROUBLESHOOTING 7
SECRET
Approved For Release 2000/06/14: CIA-RDP78-06505A000500040027-9
,' aLA ~`rwed Releaser 200@MAI4E: CIA-RIR78mVo505AOO@5d09400217 SEEN By
C%. K C I E[CIUDE0 FROM AUTOMATIC
(When Filled In) a WNis it un NO
ADVANCE COPY ^ ISSUED ^ SLOTTED
25X1A
25X1A
D RID COPY
7
e
10
PAGE 3 4926 S E C R ET
5. PLEASE ADVISE SOONEST RE THE ABOVE SO
THAT HE CAN PLAN ACCORDINGLY. CONSIDER PRESENCE 25X1A
DURING THE PERIOD 10 MAR ON THRU FINAL CHECK OUT AS ESSENTIAL.