POL STORAGE AND PIPELINE SYSTEM
UNDER CONSTRUCTION NON GAI-TIEU GIRO AREAS,
NORTH VIETNAM
SECRET
NPIC/R-40/70
JUNE 1970
GROUP 1: EXCLUDED FROM
AUTOMATIC DOWNGRADING
Approved Fb Rf1'eaTse 2000/05/10 : CIA-RDP78BO456OA006900010027-4
Approved For Release 2000/05/10 : CIA-RDP78BO456OA006900010027-4
This document contains information affectine
the national defense or the United States.
within the meaning of Title 19, sections
793 and 794, of the U.S. Code, as amended.
Its transmission or revelation of its contents
to or receipt by an unauthorized person is
prohibited by law.
Approved For Release 2000/05/10 : CIA-RDP78BO456OA006900010027-4
NPIC R-4070
Approved For Release 2000/05/10 S9 DP78BO456OAOO69OOO1OO 7-4
NO FOREIGN DISSEM
POL STORAGE AND PIPELINE SYSTEM UNDER CONSTRUCTION,
HON GAI-TIEU GIAO AREAS, NORTH VIETNAM
1. A major POL handling and distribution system has been observed
under construction north of Haiphong, North Vietnam.
segments of construction have been observed as far west as 29 nautical
miles (nm) from Hon Gai. The system utilizes a dual pipeline network
with one major storage area and one possible storage area, both of which
were seen under construction.
2. This report contains text, selected photographs, and a location
map depicting intelligence available through
3. A new POL storage and pipeline system was recently observed
under construction west of Hon Gai and along Route 18. North Vietnam. On
25X1 D
25X1 D
photography of a POL storage area was 25x"IU
under construction at Tieu Giao, a possible POL storage area. was under
construction between Tieu Giao and Hon Gai, and a segment of dual pipe-
line was under construction along Route 18, where two segments of com-
pleted dual pipeline were also observed (Figure 1).
11
IVD SfIi d ~;F?AIR, D
,~? $AI? CRAY ,
"1 u GIA6
Y LOST R GE
z AREA IJCON
RQAD
o"" 8 UAL R1
LINE...
F, I
%
+sl~ a~ kES~ ~ ] \
ti.
iIF 0` UNION
FIGURE 1. POL STORAGE AND PIPELINE SYSTEM UNDER CONSTRUCTION, HON GAI-
TIEU GIAO AREAS, NORTH VIETNAM
Approved For Release 2000/05/10 SFAff DP78BO456OA00690001 OO27-4
Approved For Release 2006 a : CIA-RDP78B04560Ab 96001&827-4
NO FOREIGN DISSEM
4. Extensive excavating, grading, and trenching were in progress
at the POL storage area at Tieu Giao, 4.9 nautical miles (nm) west of Hon
Gai. At least seven excavations, connected by trenching for service pipe,
had been prepared for the placement of POL storage tanks. Fifty-one POL
tanks were in the Tieu Giao storage area; 17 were in excavations. Each
storage tank has an estimated capacity of 42 metric tons which is double
the capacity of the tanks normally used in the operational pipeline and
storage system in the North Vietnam panhandle.
5. Some of the POL pipe sections in the Tieu Giao storage area are
approximately approximately one and one-half
times as long as the pipe sections commonly used in the panhandle system.
Partially completed tank sections, tank end plates, and A-frame lifts
were observed in a POL tank fabrication area (Figure 2).
6. Thirty 21-metric ton (gasoline) storage tanks were in an area
near the pipeline, 3.3 nm west of Hon Gai, but none had been permanently
emplaced or tied into the line. This area may become a second storage
area.
7. A completed dual pipeline extends 4.2 nm eastward from the Tieu
Giao storage area and generally parallels the Kep-Hon Gai rail line to
the Hon Gai Naval. Base and Ship Repair Yard Bai Chay
This installation was heavily damaged during the bombing period and
appears to have no naval or ship repair function. The pipeline runs into
this yard and apparently terminates within a few feet of the shore of Hon
Gai Bay.
8. A second segment of completed dual pipeline is located south of
Route 18 and north of the Song Da Bach (River) in an area approximately
26 nm west of Hon Gai and 12 nm north-northwest of Haiphong. This segment
is probably an extension of the pipeline from Tieu Giao; however, due to
a 15-nm gap in photographic coverage, the joining of these two segments
could not be confirmed. At one point along this 3-nm completed segment,
two additional parallel pipes extend approximately 150 meters (492 feet);
any further extension cannot be determined. At another point along this
segment, stacks of two different lengths of POL pipe were observed. The
longer appeared to be the same as the pipe sections
at the Tieu Giao storage area.
9. A dual pipeline under construction extends westward from the
Tieu Giao storage area. This segment generally parallels Route 18 to the
Song Mio (River), 6.4 nm west of Tieu Giao. At this point clouds pre-
cluded further observation of this segment. When observed, construction
on this segment consisted of ground clearing and parallel trenching.
25X1D
25X1A
25X1
Approved For Release 2000/9 TCIA-RDP78BO456OA006900010027-4
NO FOREIGN DISSEM
Approved For Release 2000/05/10 :'C1144EP78B04560A0069000' 66 4 0/70
NO FOREIGN DISSEM
POL TANK FABRICATION AREA
u6wnmmtuw
PIPE SECTIONS
25X1 D
POL TANKS
FIGURE 2. TIED GIRO POL STORAGE AREA UNDER CONSTRUCTION, NORTH VIETNAM
Approved For Release 2000/05/10SEcI'RDP78B04560A006900010027-4
NO FOREIGN DISSEM
!! NPIC/R-4070
Approved For Release 20&&& fr1TT 0 : CIA-RDP78BO456OA006900010027-4
NO FOREIGN DISSEM
25X1 D
Pipe was not visible in any of the trenches; however, pipe sections
alongside the trenches immediately north of the Tieu Giao storage area
were apparently being readied for emplacement (Figure 3). This pipe has
an estimated diameter of while the pipe used
in the operational system in the panhandle has a
10. Construction techniques used in this segment of pipeline differ
from those that were used to install the pipeline in the North Vietnam
panhandle and Laos. The pipeline system in the panhandle was constructed
generally by manual labor; whereas construction and trenching machinery
was used more extensively on the system west of Hon Gai. The only pre-
viously observed instances of dual pipeline in the system in Laos have
been ingress or egress lines at pumping stations.
11. The size of the POL tanks, the size of the pipe, and the instal-
lation of a dual pipeline indicate that this system will probably be a
major POL handling and distribution system.
FIGURE 3. DUAL PIPELINE UNDER CONSTRUCTION, 'L'IEU GIAO AREA, NORTH VIP.`PNAM
25X1D
25X1 D
Approved For Release 2000/9? TCIA-RDP78BO456OA006900010027-4
NO FOREIGN DISSEM
NPIC/R-40/70
Approved For Release 2000/05/10WWDP78B04560A006900010027-4
NO FOREIGN DISSEM
25X1D
AMS. Series L7014, Sheets 6350-I, 6351-11, 6351-III, 6450-iv, 6451-III,
scale 1:50,000
USAF. Series JOG(A), Sheets NF 48-12, NF 48-16, scale 1:250,000
REQUIREMENT
NPIC Project 150066NK
Approved For Release 2000/05/10 SSRARDP78BO456OA006900010027-4
NO FOREIGN DISSEM
Approved For Release 2000/05/10 SEDP78B04560A006900010027-4
NO FOREIGN DISSEM
Approved For Release 2000/05/10 :9CRRT)P78B04560A006900010027-4
NO FOREIGN DISSEM