Published on CIA FOIA (foia.cia.gov) (https://www.cia.gov/readingroom)


POL STORAGE AND PIPELINE SYSTEM UNDER CONSTRUCTION HON GAI-TIEU GIAO AREAS NORTH VIETNAM

Document Type: 
CREST [1]
Collection: 
NGA Records (Formerly NIMA) [2]
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04560A006900010027-4
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
8
Document Creation Date: 
December 28, 2016
Document Release Date: 
February 23, 2000
Sequence Number: 
27
Case Number: 
Publication Date: 
June 1, 1970
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78B04560A006900010027-4.pdf [3]1.14 MB
Body: 
Approved For Release 2000/05/10 : CIA-RDP78B04560A006900010027-SECRET NO FOREIGN DISSEM PHOTOGRAPHIC INTERPRETATION REPORT NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER POL STORAGE AND PIPELINE SYSTEM UNDER CONSTRUCTION NON GAI-TIEU GIRO AREAS, NORTH VIETNAM SECRET NPIC/R-40/70 JUNE 1970 GROUP 1: EXCLUDED FROM AUTOMATIC DOWNGRADING Approved Fb Rf1'eaTse 2000/05/10 : CIA-RDP78BO456OA006900010027-4 Approved For Release 2000/05/10 : CIA-RDP78BO456OA006900010027-4 This document contains information affectine the national defense or the United States. within the meaning of Title 19, sections 793 and 794, of the U.S. Code, as amended. Its transmission or revelation of its contents to or receipt by an unauthorized person is prohibited by law. Approved For Release 2000/05/10 : CIA-RDP78BO456OA006900010027-4 NPIC R-4070 Approved For Release 2000/05/10 S9 DP78BO456OAOO69OOO1OO 7-4 NO FOREIGN DISSEM POL STORAGE AND PIPELINE SYSTEM UNDER CONSTRUCTION, HON GAI-TIEU GIAO AREAS, NORTH VIETNAM 1. A major POL handling and distribution system has been observed under construction north of Haiphong, North Vietnam. segments of construction have been observed as far west as 29 nautical miles (nm) from Hon Gai. The system utilizes a dual pipeline network with one major storage area and one possible storage area, both of which were seen under construction. 2. This report contains text, selected photographs, and a location map depicting intelligence available through 3. A new POL storage and pipeline system was recently observed under construction west of Hon Gai and along Route 18. North Vietnam. On 25X1 D 25X1 D photography of a POL storage area was 25x"IU under construction at Tieu Giao, a possible POL storage area. was under construction between Tieu Giao and Hon Gai, and a segment of dual pipe- line was under construction along Route 18, where two segments of com- pleted dual pipeline were also observed (Figure 1). 11 IVD SfIi d ~;F?AIR, D ,~? $AI? CRAY , "1 u GIA6 Y LOST R GE z AREA IJCON RQAD o"" 8 UAL R1 LINE... F, I % +sl~ a~ kES~ ~ ] \ ti. iIF 0` UNION FIGURE 1. POL STORAGE AND PIPELINE SYSTEM UNDER CONSTRUCTION, HON GAI- TIEU GIAO AREAS, NORTH VIETNAM Approved For Release 2000/05/10 SFAff DP78BO456OA00690001 OO27-4 Approved For Release 2006 a : CIA-RDP78B04560Ab 96001&827-4 NO FOREIGN DISSEM 4. Extensive excavating, grading, and trenching were in progress at the POL storage area at Tieu Giao, 4.9 nautical miles (nm) west of Hon Gai. At least seven excavations, connected by trenching for service pipe, had been prepared for the placement of POL storage tanks. Fifty-one POL tanks were in the Tieu Giao storage area; 17 were in excavations. Each storage tank has an estimated capacity of 42 metric tons which is double the capacity of the tanks normally used in the operational pipeline and storage system in the North Vietnam panhandle. 5. Some of the POL pipe sections in the Tieu Giao storage area are approximately approximately one and one-half times as long as the pipe sections commonly used in the panhandle system. Partially completed tank sections, tank end plates, and A-frame lifts were observed in a POL tank fabrication area (Figure 2). 6. Thirty 21-metric ton (gasoline) storage tanks were in an area near the pipeline, 3.3 nm west of Hon Gai, but none had been permanently emplaced or tied into the line. This area may become a second storage area. 7. A completed dual pipeline extends 4.2 nm eastward from the Tieu Giao storage area and generally parallels the Kep-Hon Gai rail line to the Hon Gai Naval. Base and Ship Repair Yard Bai Chay This installation was heavily damaged during the bombing period and appears to have no naval or ship repair function. The pipeline runs into this yard and apparently terminates within a few feet of the shore of Hon Gai Bay. 8. A second segment of completed dual pipeline is located south of Route 18 and north of the Song Da Bach (River) in an area approximately 26 nm west of Hon Gai and 12 nm north-northwest of Haiphong. This segment is probably an extension of the pipeline from Tieu Giao; however, due to a 15-nm gap in photographic coverage, the joining of these two segments could not be confirmed. At one point along this 3-nm completed segment, two additional parallel pipes extend approximately 150 meters (492 feet); any further extension cannot be determined. At another point along this segment, stacks of two different lengths of POL pipe were observed. The longer appeared to be the same as the pipe sections at the Tieu Giao storage area. 9. A dual pipeline under construction extends westward from the Tieu Giao storage area. This segment generally parallels Route 18 to the Song Mio (River), 6.4 nm west of Tieu Giao. At this point clouds pre- cluded further observation of this segment. When observed, construction on this segment consisted of ground clearing and parallel trenching. 25X1D 25X1A 25X1 Approved For Release 2000/9 TCIA-RDP78BO456OA006900010027-4 NO FOREIGN DISSEM Approved For Release 2000/05/10 :'C1144EP78B04560A0069000' 66 4 0/70 NO FOREIGN DISSEM POL TANK FABRICATION AREA u6wnmmtuw PIPE SECTIONS 25X1 D POL TANKS FIGURE 2. TIED GIRO POL STORAGE AREA UNDER CONSTRUCTION, NORTH VIETNAM Approved For Release 2000/05/10SEcI'RDP78B04560A006900010027-4 NO FOREIGN DISSEM !! NPIC/R-4070 Approved For Release 20&&& fr1TT 0 : CIA-RDP78BO456OA006900010027-4 NO FOREIGN DISSEM 25X1 D Pipe was not visible in any of the trenches; however, pipe sections alongside the trenches immediately north of the Tieu Giao storage area were apparently being readied for emplacement (Figure 3). This pipe has an estimated diameter of while the pipe used in the operational system in the panhandle has a 10. Construction techniques used in this segment of pipeline differ from those that were used to install the pipeline in the North Vietnam panhandle and Laos. The pipeline system in the panhandle was constructed generally by manual labor; whereas construction and trenching machinery was used more extensively on the system west of Hon Gai. The only pre- viously observed instances of dual pipeline in the system in Laos have been ingress or egress lines at pumping stations. 11. The size of the POL tanks, the size of the pipe, and the instal- lation of a dual pipeline indicate that this system will probably be a major POL handling and distribution system. FIGURE 3. DUAL PIPELINE UNDER CONSTRUCTION, 'L'IEU GIAO AREA, NORTH VIP.`PNAM 25X1D 25X1 D Approved For Release 2000/9? TCIA-RDP78BO456OA006900010027-4 NO FOREIGN DISSEM NPIC/R-40/70 Approved For Release 2000/05/10WWDP78B04560A006900010027-4 NO FOREIGN DISSEM 25X1D AMS. Series L7014, Sheets 6350-I, 6351-11, 6351-III, 6450-iv, 6451-III, scale 1:50,000 USAF. Series JOG(A), Sheets NF 48-12, NF 48-16, scale 1:250,000 REQUIREMENT NPIC Project 150066NK Approved For Release 2000/05/10 SSRARDP78BO456OA006900010027-4 NO FOREIGN DISSEM Approved For Release 2000/05/10 SEDP78B04560A006900010027-4 NO FOREIGN DISSEM Approved For Release 2000/05/10 :9CRRT)P78B04560A006900010027-4 NO FOREIGN DISSEM

Source URL: https://www.cia.gov/readingroom/document/cia-rdp78b04560a006900010027-4

Links
[1] https://www.cia.gov/readingroom/document-type/crest
[2] https://www.cia.gov/readingroom/collection/nga-records-formerly-nima
[3] https://www.cia.gov/readingroom/docs/CIA-RDP78B04560A006900010027-4.pdf