Published on CIA FOIA (foia.cia.gov) (https://www.cia.gov/readingroom)


ICBM COMPLEX, YEDROVO, USSR LAUNCH AREAS C AND G

Document Type: 
CREST [1]
Collection: 
NGA Records (Formerly NIMA) [2]
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04560A002800010023-3
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
6
Document Creation Date: 
December 28, 2016
Document Release Date: 
January 5, 2004
Sequence Number: 
23
Case Number: 
Publication Date: 
September 1, 1964
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78B04560A002800010023-3.pdf [3]304.45 KB
Body: 
Approved For Release I0fr/02S6Cf RDP78B04560A002800010023-3 NPIC/R-851/64 September 1964 Copy t" P 4 Pages ICBM COMPLEX, YEDROVO, USSR Declassification Review by NIMA/DoD NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER GROUP 1 TOP SECRET E.dudsd Ir?m uurom?nc Approved For Release 2004/02/11: CIA-RDP78B04560A00280001002 ?`?????/ LAUNCH AREAS C AND G 5X1 25X1 pproved For Rq ease 004R/02/1 NPIC/R - 851/64 ICBM COMPLEX, YEDROVO, USSR LAUNCH AREAS C AND G This report presents information on Launch Areas C (5)* andG (7)*, YedrovotCBMComplex, updating that given in NPIC/R-224/64, dated April 1964. jJ 25X1 D Launch Area C (57-48N 33-07E) consists of a completed Type IID launch site and a site support facility (Figure 1). It is situated in a heavily wooded area 17.7 nautical miles (nm) west-southwest of the complex support facility. area was first seen in 25X1 D and can be negated on photog-- 25X1 D raphy of It was con-- 25X1 D sidered complete by 25X1 D ^ Security fencing is not apparent around the launch site. There are 16 buildings in the launch site. An earth-mounded missile-ready building, canted outward about 15 degrees, is 600 feet behind the right pad. Two earth- mounded missile-ready buildings serve the left pad: one is 600 feet behind the pad and canted outward about 10 degrees, and the other is 625 feet behind the pad and canted inward about 25 degrees. Two canted earth-mounded buildings are inboard of each pad and three earth-mounded buildings are in line down the center of the site. An erector /shelter is on each pad. Three buildings, including a T- shaped building, are northeast of the missile- ready building which serves the right pad. An earth-mounded building is 800 feet south of *TDI site designators are indicated in parentheses. the left pad, adjacent to the site access road. The left pad and the road connecting it to the two missile-ready buildings appear darker in tone than the other roads in the area. The buildings adjoin the launch site near the pair of missile-ready buildings serving the left pad. The site support facility is divided into an administration and housing section and a prob- ble construction /support section. This site support facility may also be utilized by Launch Site 11, which is located approximately 4,200 feet north-northwest. The administration and housing section is 2,705 feet southeast of Launch Site C. It contains 50 buildings, in- cluding 15 barracks-type buildings, 2 L-shaped buildings, and 33 buildings of various sizes. The probable construction/ support section is 4,790 feet southeast of the launch site. It contains 25 buildings, 9 of which are barracks type buildings, and a vehicle/equipment pool. Judging by the location, the probable con- struction/support section may possibly be an auxiliary support facility for the western half of the ICBM complex. 25X1 25X1 25X9 25X1 Approved For Release 2004/02/11: 002800010023-3 25X1 TOP SECRET 25X1 Approve For Release 2000/02771 E CI - 25X1 D LAUNCH SITE Pad orientation Pad separation 3Missile-ready buildings 1 Building 1 T-shaped building 2 Center buildings 4 Canted buildings TOP SECRET L-shaped building 140 x 30 60 x 30 5 Barracks-type buildings 140 x 45 4 Barracks-type buildings 110 x 30 Approved For Release 2004/02/11: CIA-RDP78BO456OA00280001 2900+ 5 ? 980 170 x 60 150 x 50 120 x 40 90 x 30 110 x 40 90 x 30 4 Buildings 160 x 45 2 Buildings 155 x 35 1 L-shaped building 140 x 45 90 x 30 4 Barracks-type buildings 140 x 45 3 Buildings 120 x 65 1 L-shaped building 110 x 30 90 x 30 11 Barracks-type buildings 110 x 30 FIGURE 7. LAUNCH AREA C. _ 2 _ Road - - - - Trail Cableway SITE SUPPORT FACILITY PROBABLE ^ CONSTRUCTION/ Probable building SITE SUPPORT FACILITY ADMINISTRATION PROBABLE CONSTRUCTION/ AND HOUSING SECTION SUPPORT SECTION 25X1 25X1 25X1 25X1 25X1 D pproved For Release 2004/02/1 02800010023-3 Launch Area G (57-47N 33-01F) consists of a completed Type IID launch site and a site support facility (Figure 2). It is situated in a heavily wooded area 21.2 nm west-southwest of the site support facility. The launch area was first observed in 25X1 D I I and can be negated on photography of 25X1 D It was considered 25X1 D 25X1 D complete by I LAUNCH SITE Pad orientation 2900+ 5? Pad separation 980 3 Missile-ready buildings 170 x 60 2 Center buildings 110 x 40 4 Canted buildings 90 x 30 1 Building 80 x 45 1 Building 45 x 45 The launch site is enclosed by a double security fence. Fourteen buildings are within the site. An earth-mounded missile-ready building is 600 feet behind, and in line with, the right pad. Two earth-mounded missile- ready buildings serve the left pad; one is 600 feet behind the pad and canted outward about 30 degrees; and the other is 625 feet behind the pad and canted inward about 30 LAUNCH SITE ADMINISTRATION ND A HOUSING O SECTION ~/ SITE SUPPORT FACILITY Road HOUSING SECTION i" Cableway Earth-mounded Ill building FEET (APPROXIMATE) SITE SUPPORT FACILITY ADMINISTRATION AND HOUSING SECTION HOUSING SECTION 17 Barracks-type buildings 140 x 45 1 L-shaped building 140 x 30 1 Building 120 x 45 110 x 30 2 Buildings 105 x 40 1 L-shaped building 140 x 30 2 Buildings 100 x 35 60 x 30 Approved For Release 2004/02/1 A00280q TOP SECRET !/ ---- Trail - Fece 25X1 25X1 25X1 25X1 25X1 Approves For Relea?~0 1U~'/'I'IE C A-RDP781304560A0 2800010023-3 25X9 25X9 degrees. Two canted earth-mounded build- contains 26 buildings, including 17 barracks- ings are inboard of each pad and three earth- type buildings. The housing section is 3,800 mounded buildings are in line down the center feet southeast or the launch site. It contains 21 buildings, including 14 barracks-type build- ings and 2 L-shaped buildings. Six barracks-type buildings are 4,500 feet south of the launch site. Three buildings have been removed from this area since section. The administration and housing section area. is 2,380 feet southeast of the launch site. It The site support facility contains anadmin- istration and housing section, and a housing 25X1 D 1. NPIC. R-224/64, ICRRP Comp ex, ) edrovo, I;SSI1, :Apr 61 (TOP "ECRET TOP SECRET[ 25X1 25X1 25X1 D 25X1 D 25X1 25X1 Approved For Release 2004/02/11 : - 800010021 25X1 Approved For Release]- Q /02 RDP78BO456OA002800010023-3 Approved For Release 20(T4F/11S CP78BO456OA002800010023-3

Source URL: https://www.cia.gov/readingroom/document/cia-rdp78b04560a002800010023-3

Links
[1] https://www.cia.gov/readingroom/document-type/crest
[2] https://www.cia.gov/readingroom/collection/nga-records-formerly-nima
[3] https://www.cia.gov/readingroom/docs/CIA-RDP78B04560A002800010023-3.pdf