TRANSLATIONS ON USSR RESOURCES
(FOUO ~.6/79)
U. S. JOINT PUBLIC~?TIONS RESEARCH S~RVICE
FOR OFFiCIAL USE ONLY -
~
APPROVED FOR RELEASE: 2007/02/09: CIA-RDP82-00850R000100060060-8
APPROVED FOR RELEASE: 2007/02/49: CIA-RDP82-44850R000100064460-8
NOT~
JpR5 publicaeions contai.n information primarily fr~m foreign
newspaper~, p~riodic~ls ~nd b~dks, but ~leo �rom n~ws ag~ncy
- rransmissions ~ttd bro~dcas~s. Mae~rials Ernm forei~n-lan~uc~ge
sourc~~ are Cranslated; ehd~~ from ~ngliah-language snurces
ere transcribed or reprineed, wirh the origin~l phr~sing and
other char~ceeriseics r~tained,
Hpadlines, ediCorial reports, and maeerial enclosed in brackeC9
[j are supplied by JPRS~ Processing indicACors such as [Texe)
or [Excerpr] in the firse line of eaah ie~m, or followin~ the
, last line of d brief., indicate how the original informaeion w~s
processed. Where no processing indicneor ia given, the infor-
maCion was summarized nr extract~d.
Unfdmiliar names rendered phonerically or transliterated are
enclosed in parentheses. Words or nAmes preceded by a ques-
tion mark And enclosed in parentheses were not clear in the
original buC have been supplied asaupropriAte in context.
9 Other unarrributed parenthetical notes within the body of un
item originate with the source. Times within items.are as
giver by source.
The conCents of this publication in no way represenC the poli-
cies, views or attitudes of the U.S. Covernment.
COPYRIGHT LAWS AND REGUI.ATIONS GOVERNING OWNER5NIP OF
MATERIALS ItEPRODUCED HEREIN ItEQUIRE THAT DISSEMINATION ~
OF TNIS PUBLICATION BE RESTRICTED FOR OFFICIAL USE ONLY.
APPROVED FOR RELEASE: 2007/02/09: CIA-RDP82-00850R000100060060-8
APPROVED FOR RELEASE: 2007/02/49: CIA-RDP82-44850R000100064460-8
~OI2 OFF~rC:LAL US~ ONLY
JPRS L/8549
- 2 8 June 1.9 79
. TRANSLATIONS ON USSR R~SOURCES
(FOUO 16/79)
- CONTENTS PAGE.
_ ELECTRIC }~'OWER AND POWEE2 EQITIPMENI'
� Pawer Machine Building in 1979 Di~cussed
(V. V. Krotov; E1~RGOMASHZNOS2'ROYENIYE, Jan 79) ' 1
$ydroturbine Equipment for Sayano-Shuahenske,ya (}ES
Deacribed
(G. A. Shishov, et al.; ENERGOMASHIMOSTROYENIY~,
Jan 79) 8 "
Modernization of the ~ydrotu~rbine Equipment of the
Cnirchik (3ES Cascade
(V. V. Ba.l$gurov, M. A. Tevetkov;
ENF;RGOMA3~iINOSTROYENI'YE, Je,n 79 ) � � � . � . � . � � � � � . . . . . . 20
Baeic Queations of Designing TETs of Increased Pla~t
Readineas "
~ (V. I. Savin; TEFLOFTKATSIYA SSSR, 197?) 23
PTJELS AND RELATED ~QUIPNIEI~
Institute OPfers New Principles and Plana for Mine Operation
(A. F. Ostapenko, et al.; t~OL' UIQtAINY, a~ 79) 42
Tablea of 1978 Ukrainian Coa1 Production ~ -
( UGOL~ UI~t~P?IMt, AP~' 79 ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52 -
Bit for Drilling Cement Plugs Deacribed
(S. M. Danelyants, et al.; BURFN IYE, Nhr 79) ;i7 _
- a - (III - USSR - 37 FOUO]
, FOR OFFICIAL USE ONLY
APPROVED FOR RELEASE: 2007/02/09: CIA-RDP82-00850R000100060060-8
APPROVED FOR RELEASE: 2007/02/49: CIA-RDP82-44850R000100064460-8
~OEi O~FICIAL USE ONLY
~ ~
~LrC'TnIC POWCR AND POWER EQUIPMENT
POWCR MACHINE BUiLDING IN 1979 DISCUSSED
Moacow CNERGOMASNINOSTROYENIYE in Rusaian No 1, Jan 79 pp 1-3
[Article by MinisCer of Che Power Machine Building xnduetry of the USSR
V. V. Kroeov]
[Text] The fourCh yeAr of Che Tenth Five-Year Pl~n ia an importanr stage
along Che road toward itis auccessful completion. Zo acnieve Chis, it is ~
necessary to raise the level of labor organization, and the intensity and
pace of work in sll labor units af Che induatry, and to concentrate the ef-
forts and means on the main directions. If in this connection we turn to -
the goals se~ for our secCor of. industry by the "Guidelines for the Develop-
_ m~nC af the National Economy of the USSR for 1976-1980," it ia posaible to
say Chad moar of them are being consiatently achieved. Production associa-
tions and enterprises of the ministry are achieving the main indexea of the
State Plan for Economic and Social Development: che pace of growth, i~,crease
of the production volume, and incr~ase in labor productivity. This ia ex-
pressed c~ncretely in further equipment of domestic electric power engineer-
ing, gas industry, and other sectors of the national economy with modern,
reliable equipment.
ParCicipating directly in solving the problems poaed by the development of
the fuel and energy complex of the country, production asaociations and enter-
prises of our industry have created a complete set of Chermomechanical equip-
ment for an energy unit of 1200 MW which will be inatalled at Koatromekaya
GRES. The firat custom-made hydraulic unit of 640 MW for the world's largest
Sayano-Shushenskaya GES has been delivered. The production of Che second
unit is nearing completion. The delivery of equipment for hydroelectric
power stations which are under construction in Siberia and in ~he Ear East
is also nearing completion: for Uat'-Ilimekay GES and Zeyakaya GES, as well
as for the Central Asiatic Nurekskaya GES. Power units have bpen manufao-
- tured for the new blocks of Leningradskaya, Rurakaya, and Chernobyl'skaya
AES; equipment of the ffrat unit with a water-moderated water-cooled reactor
of 1000 MW which will be inatalled at Novovoronezhskaya AES.
Designera and technologists of our industry invested much work, creative
energy, and knowledge into the creation of thia unique unit.
- 1
FOR OFFICIAI. USE OtJLY
APPROVED FOR RELEASE: 2007/02/09: CIA-RDP82-00850R000100060060-8
APPROVED FOR RELEASE: 2007/02/49: CIA-RDP82-44850R000100064460-8
~OIt nFFYCIAI~ U5~ ONLY '
Our indugCry pnrticipures among other ind~isCriea in the strengrheni.ng of
ineernational economi.c Ciea of the U55R find m~lc~e l~rge deliveriea nf hy-
drttulic turbine equipment Co Can~de, Argen~ina, I3r~zi1, equipmenC ~or AES,
gnd nCher producC~ oF the power mAChine building indusery eo eoci~li.sC coun-
Cries, ~s well as Co oCher countries develop~.ng their nAeional economy,
Tlie Cechnic~l lcvel ~tnd operaCionA1 reliabilitiy Of g39Mpumping uniCs produced
by rhe enCerpriaes of this indusrry continues en rise, Wh~.Ctl is indicueed by
the fact th~C one of Chem, GTK-10-48, was ~twArded Che SeACe Cmblem of Quxlity.
~ This ig the reault oF ehe achievements of deaignera and ehe furCher improve-
menC oF technological standards, primarily in the produceion association
"Nevskiy zavod" imeni V~ I~ Lenin.
In the course of tl~e rhree years of Che Tenth ~ive-Year Plai~, oiir industry
has been reconaCructing ~nd reequipping the opernting enterprises attd ~vns
sCeudily incrensing the output of power equipment, primurLly for ttComic elec-
tric power atationa.
SCriving d~tily for rhe improvement of effecrivenes~ i~t tl~is imporC~tnC work, ~
~he collecCives of as~ocinCions and enterprises }iuve opreud n larse-acale
socialisC competiCion and concentrated their efforts and creative energy on
the fu1fi11menC und overfu1fi11menC of Che planned gonls. The producCion
_ association "Krnsnyy koCel'shchik" orggnized a campaign for on-time produc-
tion and high quality of ateam generators and heaC-exchunge equipmenC and
initiated a compeCition under the slogan "eo work without lagging workera".
This iniCiaCive of Taganro~ boiler manufACturers was supported by Che Ministry
Board and Preaidium of the Central Committee of the industry's trude union, _
Taganrog city committee and Rostovskaya flblasC cortunittee of the party. On
16 April 1977, "PravdA" newspaper published a letter of the Secretary Ceneral
of the CPSU Central Committee Comrade L. I. Brezhnev to ttie workers of Che
Don area in which he stresaed the importance of the campaign "To worlc with-
out lagging workers" for the country and for the fulfillment of the goals of
the national economy. An All-Union conference-seminar was tield in Roatov to
discuss Chis effective trend in socialist competitions. It muat become one
of the guidelines in labor competiCions umong the collectives of our indusCry :
in the fourth year of the Tenth Five-Year Plan in conformity with special
characteristics of production and conditiona of each enterpriae.
Production associations "Leningradskiy r~~tallicheakiy zavod", "Izhorakiy za-
vod" imeni A. A. ZhdAnov, "Turbomotornyy zavod" imeni K. Ye. Voroshilov, and
other enterprises formed creati.ve cooperation teams and started a lgrge-scale
campaign for economical uae of inetals and materials, and for improving the
- effectiveness and qualiCy of labor at each work place. `
Those who are introducing the experience of the Leningrad workers b~sed on
an integraCed solution of organizational and technical problems and on coor-
dination of the actions of all participants of constructLon pro3ects, from
the design to its delivery, can see clearly that the road to the final re-
ault becomes conaiderably shorter when the builders and the deliverers of
_ 2
FOR OFFICIAL USE ONLY
APPROVED FOR RELEASE: 2007/02/09: CIA-RDP82-00850R000100060060-8
APPROVED FOR RELEASE: 2007/02/49: CIA-RDP82-44850R000100064460-8
H'OR OI~"~ICT.1L USL ONLY
ecluipmenr conclude un agreemene on snciulist cooperatioc~, Sucl~ agreements
~nre now used effecCively Eor ~cceLer~tl.ng rhe conserucCion nf Snyuno-Shuahensk-
n.yc? C1;5 ~u~d "A~onunr.ish" which is known uLl ovQr the counCry,
Sc~cl;.ilis~ competiCtone und Che tniriuelves ot et~e workera a~ nur indugtry hiive
mndc ct subsCantiAl contribution to tl~e Culfillment of the prnduction program
oE rhe ehird year oE rhe Tenth Five-1'e~ir Plan, which has opened real possi-
bilities Cnr tt~e Eulfillment of Clie goals wirh respect to the producCS list
o~ p~irCicularly imporCant power equipmenC. Ir is not simple, but possible Co -
;ict~ieve tt~is ~C rhe present sCnge of rhe development oF power machine build-
ing if we raise rhe level of producCion, planning, organization, nnd clariry
in solving eechnical problems on the bASis o� close inte~raCed connecCion of
science with production, For this, iC is necess~nry to improve the effecCive-
- ness of rl~e work oE aecCori~l scientific and production orgnniz~tiona and in-
sCi~u~es, ~s well as of Che design and rechnological departmenCa of producCion
~lssnci~iCions and enter.prises.
In 1978, the CPSU CenCral Committee and the USSR Council of Ministers p~ssed
an import~nt resolutioi~ on further development of machine building whicti ex-
panded and concretized the basic ideas contnined in t}~e decisions oC the 25t}~ -
CPSU Congress whic}i defined rhe ways for the improvement oE productiar. m~n~ige-
ment ~1nd Eor ratsing t}ie technical level of power equipment produced by the
en~cr.prtses of ttie Ministry oE the Power Muchine F~uilding IndusCry, '~his re-
sol~ition oE the CPSU Central CommitCee and ttie Council of MinisCers is a new
stimulus oE our entire pracCical work in solving the fuel and et~ergy prol~lema
on tl~e hasts of a wider uttlizAtion of the considerttble coul resources of ttie
Kansko-Ac}~insk and EkibASCuz fields and of the not yeC exhausted possiUilities
- oC the rtvers in ttie central part of the country and the increasing construc-
tion of AES and ATETs [ato?nic heat and electric power stations]. In order to
- increase the effectiveness of the use of solid fuel of the eustern regions,
it is necessary to build highly productive boiler units with new merhods of ~
coal burning and achieve an increase in the unit power of units, which pro-
mises great savings in metals an~i operational expenses. �
~ne oE the immediate problems of our industry in the Tenth Five-Year Plan is
. further increase of the output of equipment for atomic electric power stations.
To ensure its fulfillment, we must, by the end oF the five-year plan, to cre-
ate complex capacities necessary ior the production outpur in the volumes set
_ hy the Cuidlines for Che Development of the National Economy of the USSR for
1976-1980. The real way of accomplishing this is: acceleration of tt~e pace
of construction of "Atommash" and installation of equipment at the prepared
construction sites, creation of capacities in the production association "Izh- ~
orskLy zavad" imeni A. A. Zhdanov, as well as ae a number of orher enterprises
participating in the production of equipmenC for AES. The USSR Gosplan has -
; not yet produced such plans for the latter, and this could hinder the develop-
ment of power engineering and the utilization of capacities already cre~ted
in the country. In the production assccir~tion "Izhorskiy zavod" imenL A. A,
Zhdanov, in 1979, we must complete the reconstruction of the sl~op manufactur- '
ing hull par[s, complete the first section of the forge and press shop, where
a 6000-ton-force press must be installed, as well as to start the construction
3 _
FUR OFFICIAL USE ONLY
APPROVED FOR RELEASE: 2007/02/09: CIA-RDP82-00850R000100060060-8
APPROVED FOR RELEASE: 2007/02/49: CIA-RDP82-44850R000100064460-8
~"OEt O1~"FICIAL iJ5~ ONI,Y
,of u uniC in ehe shop Eor manufncrurin~ hull ~ssembliE~s of re~ctors, Wc huve ~
eo implemenl ~ddirional meayures in order ro nccaler~~~e rhe munuf~ntuxing
end Che consCrucCion of ~"5000" sheeC mi11 cumplax, ~ -
Ar ~he Krumutorsic Foundry nnd ~'orging Pl~ne, it is necess~ry eo acoeler~Ce
Che insr~lla~iun oEa prFSS of 15,600 eon-foxce with manLpulutors, as ~oe11 ~s
to speed up the consCruction of a thermgl eCripping unit o~ the shop, ~nd Co
Cake ~11 me~sures for delivering a block of auxtlinry nl~ops for operation.
As Eor the production of equipmenC for AE5, designers, ~ect~nol~gisCa, and pro-
duction workers, in cooperation with instieutea, muse accelerate considerably
research and design work on individual asaemblies oF rt~e 8-1000 (aeries) unit,
the 1000 MW higt~-speed Curbine, Che sream turbine TK-500 for utomic heat and
nnd electric p~wer stnCione, as well as on an RDMK [expansion unlcnown] reacCox
wiCh an elecCric capaciCy of one ttnd a half million lcilowuCt wl~ich will be
installed ar et~e Ignnlinskuya AES. .
Hydroelecrric power sCaCions are an importan~ pnrt oF ~l~e C~?el and energy
balance of Che country. buring Che fourth and fifth years of ~he Tenth Five-~
_ Year Plan, we have to organize Che outpur of equipmeti?: Cor hyuroelectric power
sCations in such a way that the capacities of Say~no-ShushenskayA CLS,Nizhne-
kamskaya GES, and Cheboksarskaya GES would be put into operarion on time and
thaC Che delivery of t}~e equipment will be completed during the Tenth Five- ~ -
Year Plan for UsC'-Ilimskaya, VarCsikhskaytt, Kurpsayskaya, Ingurakaya, Zey-
skaya, and other GES.
For heat and power engineering whicli is oriented chteEly tc~~a~rd solid fuel of.
Kansk-Achinsk and Ekibastuz coal Eields, the enterprises cf our industry m~!st
supply in the next few years turbines with a unit power of 500 and, primarily,
800 MW, (small size) boiler units for burning complex ash coal and moist
coal of the eAStern regions of the country equipped with grinding fans and _
medium-speed grinders with a capacity of 65-70 Cuns an hour. At the TroiCsk-
aya GRES, studies on steam generators for unita of 500 MW under indusCrial
1 conditions have been completed. It is planned to use the.;n at the new GRES
whici~ are under construction in rhe regions east of t}ie Urals. The obtained
J data conf irmed that ttie selected design and technological. solueionc were
basically correct, and now we have to perfecr the design of t}~ese boiler
units in the shortest poasible time and to organize Cheir series product;on.
Just as before, ocie of the most important problems is thc problem of uninter-
rupted supply of heat to the population and enterprises of. various sectors of
tiie national economy. The production association "Turbomotor Plant" imeni
K. Ye. Voroshilov must continue the production of T-250 turbines for district
heating systems in large cities and to set up the production of a turbine af
175 MIJ as soon as possible.
In the course of Che last ten years, our gas industry h~s become a large- ~
sacle independent industry. Its needs in gas-pumping units have increased
and coneinue to increase. The requirements for their reliability and longe-
ity are increasing. The production associations "Nevskiy Plant" imeni V. I.
4
FOR OFFICI~I. USE ONLY
APPROVED FOR RELEASE: 2007/02/09: CIA-RDP82-00850R000100060060-8
APPROVED FOR RELEASE: 2007/02/49: CIA-RDP82-44850R000100064460-8
~ FO[t U~FIC?AL USE dNLY
Letti.n und "Turbmm~~or 1'lanr" imeni K. Ye. Voroshtlov, wl~o c~re the m~nin aup-
pliers ot equipmene fnr compressor sCuCions, are unable to cope fully witii
the orders. rn 1979, ir is necessury Co uccelerat~ the implementACion of -
- the complex of planned measures tor perfeceing gAS-pumping units with capa-
ciries of 6, 16, and 25 MW so ~s ro start their aeries producCion ~t Che end _
of rhe Tenth Five~YeAr Plan and Che beginning of Che ElevenGh Five-Year Plan.
Our industry hus been entrusCed with khe anlvin~ of anoeher problem whicl~ is _
very in?portant for the nAtional economy; tio develop the production of diesel
engines for qu~rry dump trucks and other l~rge Crucka. The designers of the
~roduc~ion association "TurbomoCor PlAnt" imeni K. Ye. Voroshilov have de-
signed and teated engines ChN6 21/21 and ChN8 21/21, Production workers have
eo seC up their production in rhe shorteat poasible tim~ and in Che required
J volume. DurLng Che fourCh yeur of the Tenth F'ive-Year Plan, deaigners have
Co cre~Ce a prototype of the ChN12 21/21 engine. At the same time, iC is
necessary to complete Che construction of a block of special casting stiops
and to starC the consCruction of a dieael engine production com~lex plAnning '
Co puC its firsC secCion inCo operation no later Chan 1980. This will make ~
it possible to starC the producrion of the engines which are necessary Eor
Che national economy at Che beginning of the next five-year plan,
In the rhree years, we were able, Co a certain degree, to replace our fixed
c.apital, Co obtain and install new rechnological equipmenC, and ro raise the
level of production sCandards and organizaCion. This makes it possible ~o
solve the main problem: to increase the producCion volume oF high-quality
power equipment. During the fourth year, our industry will not only continue
t}iis important work, but will also strive for its acceleraCion by c~ll posei-
ble means at all enterprises of the industry without exception.
_ It is also necess3ry to conCinue the development and improvement of rhe �acil-
~ itt~s for the production of unfinished articles, to use their existing capac-
ities more fully, and to supply rational billets to the industry, which
will reduce rhe consumption of ineCal and labor input in the production. E~r
the production association "Izhorskiy zavod" imeni A. A. Zhdanov and at the
: Kramatorsk Casting and Forging P1anC, modern eyuipment was installed for oh-
; taining high-quality steel and alloys of various classes. However, theae
~ capacities are not used to the fullesr.. The main cause is the fact that
when designers create new power zquipment and modernize the equipment which
_ , is in production they rarely use particularly pure metals with higher mech-
- anical properties and service characteristics in their designs.
- The associations and enterprises of our industry acquired a large amount of
' domestic and foreign wtlding equipment in recent years, however, its adjust-
ment is unj~istifiably delayed and it is not used effectively. The quality of
welding in the industry still remains to be one of the most important problems,
- therefore, speedy introduction of new welding equipment will considerably
accelerate t:~e production of power eyuipmenti and improve its quality.
A large volume of woric was done in the three years of the current five-year
plan ~n the area of. capital constri~ction. However, a still larger volume of
5
FOR OFFICIAI, USE ONLY
APPROVED FOR RELEASE: 2007/02/09: CIA-RDP82-00850R000100060060-8
APPROVED FOR RELEASE: 2007/02/49: CIA-RDP82-44850R000100064460-8
roK ~~~zr,i~ ~~sH: ONLY
wark hus Co be do~ie by r1~Q end o~ rhe �ive-yenr. plan, ~r~ 1979, i~ Le neces-
s~ry to ~ccelerute the construction of ehe secand secL.ion u~ "Arommash"; _
buildings 1, 2, 4, ~nd 6, construcCion cenCnr of ehe ~;~~neral. contrMCCor, sec-
ond p1anC for large-panel housing consCr.ucCion, nnd u pl~~n~ oE metal atruc-
Cures. SCarting nexe year, ~bouC one million rubles of cupi~M1 invesrments
mus~ be aysimi.lated daily in Che conatr~icCion of Che Volgodonsk AComic Power
Machine Building Plnnt And the city, IC is planned eo sl~rC Che construcCion
of ttie second plant in Volgodonsk: "Energomr~sh" [power machines].
We hope th~C Chere will be substanCial improvemenL in the c~nsCrucCion of the _
branch of Che Nevskiy Machine-Building i'lane imeni V. I. Lenin in Che city of
Chudovo, Novgorodskaya Ob1asC, and iCs first sectioti will be put ineo opera- _
tion in 19g0~ This will m~tke iC possible to inereuse I:l~e outpuC of gas pump-
ing units. -
In accordance with Che new technical and economic substanriation, Che produc-
tion association "Leningrad MeCalworking Pl~nt" has to speed up Che recon-
struction work in the main area of Che plant, and Ct?e formation of cap~cities
for the production of the planned number of gas turbines must be completed
at the "Northern SiCe" in 1980.
In production associations "Khar'kov Turbine Planr" imc?ii S, M, Kirov, "Kr~s-
nyy kotel'shchik", Syzran' 'Turbine-Building Plant, Belgorod r~nd Chekhov power -
machine building plants, as well as in a number of other enterprises of the
industiry, simultaneously with the implemenCation of a complex of organizaCional
and technic~l measures for the improvement of producCion, acceleratton o~ its
pace, and ensuring the fulfillmenr of volume indexes in tl~~ fourrh year of
_ the Tenth Five-Year Plan, it is necessary to assimilnte tt~a a11oCCed capital
investments and to take all measures to put the pl.anned capacitiea into oper-
ation. -
The needs of the national economy of the country in indusrrial boilers,
small-capacity boilers, utilization turbines, as well as in other equipment
for industrial power engineering increase every year. AlOilb with increasing
the output of these products, it is important to raise their technical level
and quality.
One of the main tasks of every work team of our industry in its competition
for improving the effectiveness and quality of work in the fourth year of the ~
Tenth Five-Year Plan is economical use of material and t~chnical resoUrces,
primarily, metals, electric energy, heAC, and fuel. All enterprises must
= analyze the remaining merchandise and materials and to take concrete and ef-
fective me3sures for Cheir rational and most effective involvement in produc-
tion. Unfinished production has to be thoroughly analyzed and its poten-
t~fiality must be used morc fully for increasing the output of power equipment.
The collectives of the associations and enterprises of the minisCry must, from _
the very first days ~f the new year, to spread widely socialist competitio ns
for further implementation of the resolutions of the 25th CPSU Congress and -
the fulfillment of the State Plan for economic and social development of the _
6
FOR OFFICIAL USE ONLY
APPROVED FOR RELEASE: 2007/02/09: CIA-RDP82-00850R000100060060-8
APPROVED FOR RELEASE: 2007/02/49: CIA-RDP82-44850R000100064460-8
FOR OFFYCIAL USE ONLY
- USSR For 1979 noC only with resper.C to ira volume bur al~o in Accordance with
nc~ producCs liat r~nd ~greemenrs,to fulfill ehe plnn for export deliveriea,
n~ wcll ;i~ Che plnn for new equipmenC.
COPYRIGHT; Izdatel'sCvo "Mashinoaeroyeniye"~ "Energomashinoatroyeniye", 1979
~ 10,233
CSO: 1822 ,
~
FOR OFFICIAL USE ONLY
APPROVED FOR RELEASE: 2007/02/09: CIA-RDP82-00850R000100060060-8
APPROVED FOR RELEASE: 2007/02/49: CIA-RDP82-44850R000100064460-8
~
FOR OrFICIAL USE ONL1'
ELCCTRIC POWER AND POW~R CQUIPMENT
wc bz1.224
HYDROTURBIIV~ EQUIPMENT FOR SAYANO-SHUSHENSKAYA GES DESCRIB~D
Moscow ENCRGOMASHINOSTROY~NIYE in Russian No 1, Jan 79 pp 4-8
'[Article by General Director of rhe Turbine-Building Production Aasociation
"Leningrad MeCal Plant" G. A. Shishov, and engineers A. P. Ogurtsov, P. V. ~
Kruglov, 0. S. Babanov, S. N. AnConov, V. V. Merkulov, V. N. Khokhulin, and
V. S. Slyn'ko] ~
[Text] Tn accordance with the decision of the parCy, the Sayanskiy territo-
_ rial production complex is being created in the south oF Krasnoyarskiy Kray.
Its energy basis will be the Sayano-Shushenskaya GES with an inaCalled capac-
- ity of 6400 MW. The Sayano-Shushenskaya GES is being built on Che Yenisey
River in the narrow Karlov Stvor not far f rom Shushenskoye, th~ place of ~
V. I. Lenin's Siberian exile. ~
The Sayano-Shuahenskaya GESis the world'slargest hydraulic development which
is unique in size and complexity. Nine million cubic meters of concrete will
be poured into a 24 5 m high dam. The spillway structures are designed for
leCting through and suppressing high water flow rates: 13,600 m3/aec. The
annual ouCpur of electric energy will be 23.5 billion kWh. The hydroturbine !
equipment for the Sayano-Shushenakaya GES was developed for the following
conditiona:
- Head in meters:
max imum 220
rated 194
minimum 175
A turbine with a rated power of 650 MW, with a wheel diameter D1 = 6.77 m,
and rotarion frequency n= 142.8 rpm has been developed. Its maximum ef- -
ficiency is about 9 6%. At a head of 212 m and higher, rhe hydroturbine is
capable of attaining its maximum power of 735 MW.
A~cording to the design assignment of the Minenergo [Ministry of Power and
Electrfficationj, the iniCial power of the turbine was set at 540 MW.
8
� FOR OFFICIAL USE ONLY
;
APPROVED FOR RELEASE: 2007/02/09: CIA-RDP82-00850R000100060060-8
APPROVED FOR RELEASE: 2007/02/49: CIA-RDP82-44850R000100064460-8
FOR OFFICTAL USE ONLY
The production ~sadci~Cion oF Curbine building "Leningrad Metal Planr" ex- -
~ amined the possibility and practicaltCy of creaCing a turbine wiCh a uni.t ,
- cupacity of 540-1500 MW for the condiCiona or the Sayano-Shushenekaya GES.
Studies sl~owed rhe technicttl poeaibiliCy oF creating a high-power turbine.
Power machine builders proposed to equip this GE5 with turbinea of $15 MW.
Ay the complex of the technical and economic inrlexes of rhis G~S as a whole,
it was found Chat the power of 650 riW was optimal.
Ir was possible ro increase the power of Che Curbine to 650 MW without chang- -
- ing rhe dimensions o� a 540 MW machine by increasing its speed of operaCion,
which made it possible to reduce the number of units from 12 ro 10, to obtain
a noticeable economic effecC, and to lay out the enCire hydraulic development
more raCionally, In the narrow passage of the GES, in ~he presenc~e ~f 12
_ units, the spillway was located above Che GES builc~ing, as a result of which
Chere was no reliable suppression of energy of the efFluent water. By re-
_ ducing Che number of units, it was possible ro place the spillwAy next Co Che
GES building,
The developed wheels make it possible ta begin the operation of Che Curbines
wiCh a head of 120 m. The first two turbines are equipped wiCh replaceable
_ wheels capable of working aC Che heads of 60-140 m and to develop the power
of. 150-400 MW. This makes it possible to increase the effectiveness of cap-
ital investments by pukting the units into operation while the conatrucCion
of the dam is nat yet completed. During the operaCion of the units with re-
' placeable wheels at the heads of 60-140 m and units wirh standard wheels ul�
lower heads of 120-175 m, additional 16 billion kWh o~ electric energy wi11
be produced.
The hydroturbine equipment for the Sayano-Shushenskaya ~ES developed wiCh
consideration for the latest achievements of Soviet and world hydroturbine
building on the basis of complex scientific research an~ technological de-
sign studies has marked a new step in the development of Soviet hydroCurbine
building. Many fundamentai design and technological "Sayan" solutions have
become basic standard solutions of the association and the industry.
The hydroturbine equipment ~~as created in close cooperation with many insti-
tutes, associations, and plants of the Soviet Union and, primarily, with the
Gidroproyekt [All-Union Planning, Surveying, and Scientific Reaearch Insti- -
tute imeni S. Ya. Zhuk], LPI [Leningrad Polytechnic Institute] imeni M. I.
Kalinin, VNIIG [All-Union ScienCific Research InstituCe of Hydraulic Engi-
neering] imeni Vedeneyev, TsKTI [Central Scientific Research, Planning, and
Design Boiler and Turbine Institute], TsNIITmash [Central Scientific Research
Instttute of Machinery-Manufacturing Technology], Izhorskiy Plant imeni A. A. -
Zhdanov, plant "Elektropul't", and many others. Zn addition to developing
, hydroturbines, the production association "Leningrad Metal Plant" partici.-
pates in solving many other problems confr~nting the builders of the Sayano-
Shushenskaya GES,
9
FOR OFFICIAL USE ONLY
APPROVED FOR RELEASE: 2007/02/09: CIA-RDP82-00850R000100060060-8
APPROVED FOR RELEASE: 2007/02/49: CIA-RDP82-44850R000100064460-8
1~'U!t ni~ 1~ IC f AL U51. (INLY
5ctentiCi~ Resenrch
'The d~vclopmettC ~f the hydroeurbiil~ equipmene for ehe 5~_~yano-Shueh~n~k~ya
GE:S, which hug no ~n~logue~ in che w~rld prac~i~c df Che cong~ruceidn df
hydr~ulie faeilihi~~, wag u ch~nllenKing ~ngine~ring, teehnie~l, und eeiCn-
ttti~ prdblcm. Duc tn the rel~~ttvEly smnll lEttg~l~ d~ the frone nf Che l~ydrn-
c+.n~;[nccrin~ ~truCtureg hnd th~ 6400 MW pnwer nf ~fi~ geution, ri~id req~ic~em~nC~ '
w~r~ imposed Ga . s... _
~ ~ ~ ~ ~ ~ .s: ra ,_a. i
I + ~ i ~ I
-t ('-a + ? f� '
_ . _
. ~--w ~ � II . � �T-
j ~ , ~ i; ? ~ , ~ . ~ ~ , ~ z----
~ y ( .'t
1
I Cg~ ~ s ~ ~I . ~ I ~ ~
F~"'1�Atfnuu~i : a 'I i~ ~'A ~ ~"p r+ ( ~ ~
1~ �1 I 11 ~ I I I�
{ ~ ;1 ~ ~ ~ . ; t~ I
r ~
~ N ! _ ~ ..ic.
~ .k~~- ' _ _ _ .~c=
~
-rr'``~
~ w i.~~ ~ ~
~igure 4. Coinbined P1an o~ Preparation witn Alt~rnate Ilriving of ~xcavation
Drifts from Duplex Drifta I,ocated on Wings and In Canter of
Sh~ft
ie ld
Keys
a~ first~ se~ond~ third~ fourth section
central= intermefliate in the middle of the xing are extinguished as the aupplier~ ,
are worked off~ The plan can be em loyed on nex gas and deep shafts xhen
there are (made during construction~ xing shafts that can be used diaing
operation t~ drive exc:avation drifts~ For this purpose during operation
instead of a bucket lif.t a doutile-ladle (holding capacity of the ladle 6 m3)
or single-ladle (9 m3) lift is used. All the listed problems are aolved xith
this plar,..
plan 3--combined (fig 3)~ the coal is transported to the central inclined
drifts. In the rtciddle of the xing connected intermadiate inclinded drifts
are driven that ase designed only for making e~avation drifts. Due to this
diar~ersal and specialization of the inclined drifta are guaranteed. As the
levels aze xorked off one of the inc].ined connected drifts is eliminated "
xhile the other after its overaorking if necessary is stopped for repair until
passage of the excavation drifts. This is possibl~ because the length of the
excavation drifts is txo times shorter than the length of the panel Ning, and
- consequently there is a sufficient supply.of time for the preparation of the
layer. For this same reason the plan guarantees rapid preparation of the
excavation sections~ It can be used in very gaseous and deep nex or recon-
~ structed shafts.
Plan 4--combined (fig 4). The shaft field is divided into three sectionss
central txo-sided and�txo King one-sided. T he first excavation sections
are prepared on tho xing sections xith their subsequent xorking off Kith
~ -
- ~9
FOR OFFICIAL USE OrTI.Y
APPROVED FOR RELEASE: 2007/02/09: CIA-RDP82-00850R000100060060-8
APPROVED FOR RELEASE: 2007/02/49: CIA-RDP82-44850R000100064460-8
i
r'Olt 0~'FICIAL U3~ ONLY
~ ~Y ~ _ ~ . ;
i~-~.~..~~~~__~ ~ _.~.~___m , ;
~i ~ ~ II ;
,
I~ ~ + ;
I j I ~
`~i~ i ~i
~ i
ii ~ ~ ;~i ,
'~t ~
~ ~ ; i
, , f
' ~ ~ ~ >~..:.3i I i
i
I j r ;
~ .w ~ i
~
} ~ '
4 ~ +
/~~1~ ~ r~~ .
_ I I
- ~ ~ _
~ L
~
Figure 5. Combined Plan of Preparation with Driving of Excavation Drifts
behind I~ongwall ~
i
transporting of the coal from the longwalls to the inclined drifts driven on
the boundaries of the central aection= the drifts here are overworked. Then
the xorking faces begin to be serviced by those excavation drifts that pre-
viously xere driven in the central section. Consequently, the plan guarantees ~
rapid aervicing of the longxalls by the incline.d drifts and excavation drifts '
(at .first xing, then central) = the ehange of functions of the inclined ~
drifts is also guarantsed (for servicing first the woxking faces, then the '
preparatory) ~ These drifts made on the boundaries of the central section are
eliminated by the sections after their overworking, at the end of which ~
driving of the excavation drifts begins. In order to ventilate the longwalls
and drifts additional single inclined drifts are made that are eliminated
as the levels are xorked off, as a result of xhich the plan can be employed
also on dsep shafts.
The pla,n makes it possible to completely solve five of the first taain problems
and partially the sixth. Plan 4 is designed only for new shafts with great
(8 km and over) length of the shaft field xith respect to extent on the non- ~
blox-out-dangerous beds~ as xell as on the blow-out-dangerous~ preliminarily ~
diacharged or with angle of incidence less than 10~. Ir. the given case the
movement of the sfi.ream of air coming from the working faces is dascendingi
xith ascending movement the plan can also be used on blow-out-dangerous beds~
50
FOR OFFICIAL USE ONLY
~ _ . _ . _ _ _ _ _ _ _ ~
APPROVED FOR RELEASE: 2007/02/09: CIA-RDP82-00850R000100060060-8
APPROVED FOR RELEASE: 2007/02/49: CIA-RDP82-44850R000100064460-8
F'OR OFFICIAL USE ONLY
Plan 5--combined (fig 5~, In the cen�ter of ~the shaft field and in the middle
of eaoh wing f~.old inc].iro.d ~ri:fts are driven (on ~he boundaxies of the
~ahaft wing connacted drifts are drivon)~ T he levelg ase worked off in an
aecc~nding ord~r~ Wii;h ra$pect to extent th~jrA arn four longwalls oper~ting
and one upwall in the center of the field under whose drift space fie 1d ~
inollned drifts are driven~ The excava-tion drifts are driven bahind the
longwalls and are reused as txans ort drifts.
P The plan makes it possible
to speciallze the inclined drifts, and gua.rantees tha r~,pid sexvic3.ng of ~;he
working faces by the inclined drifts and a high level of concentration of �the
worlc~ The rocks ~om the driving of the dxift rema,in in the shaft~ and
therefoxe the use of the plan is expedien-t wherever the 11ft and the rock
managment is the bottleneck.
_ A.11 the plans permit freshening of the outgoing stream of aix be:fore it is
- removad wlth the help of sectional pipes by means of general-shaft depression
or dilution of inethane in the drifts with respect �to the sources of i-ts
entr ance, T hus, as compared to the plans used the plans given gua,rantee
a higher level of concentration of mining, simplify~ the technology of pre-
paring and working off of the beds, and reduce the contact of the workers
with adverse and dangerous phenomena of nat~m e,
B IB LIOG RAPHY
1. Foss~ N, "Working Off of Beds by Downwalls and Upwalls on Sha~ts of the
FRG and France," GZYUKAUF, No 16, 1973�
- 2. Demeshko, B. F, "Increase in the Effectiveness and Safety of Working Series
of Ruptured Beds Prone to Dyna,mic Phsnomena, UGpI,~ , No 2, 197?�
COPYRIGHT: Izda-tel'stvo "Tekhnika", "Ugol',Ukrainy", 1979.
90 35
CSO: 1822
_ 51
~ FOR OFFICIAL USE ONLY
APPROVED FOR RELEASE: 2007/02/09: CIA-RDP82-00850R000100060060-8
APPROVED FOR RELEASE: 2007/02/49: CIA-RDP82-44850R000100064460-8
~ rtlEt 0~'~IC~AL USt, tlNLY
FU~LS ANU Ft~LA'~~U ~QITrf~N'r
;
~
TA9L~S OF 19~8 UK~AINIAN COAL pRODUCTION ~
I
' Kiev UGOL' UKitA2NY in ltusgisn No 4, Apr 79 pp 46-47 ~
(Tabl~s Listing Coal SCaCisY.ic~J
:ab1e 1
~ - ' ' .
~ 2~ Ko~�~o , ~ Cpr~ur~~ce~v~ CytovM~~ n~~pry~~, t
~A~~Y~~ +?c~~t~yp' e eACAtt� ~~u? (IU~MNf~11M1
WNf1 OYM� ~yNW~M ~MIIA~ ~t1111Y IUWN~ N~ ~fatt� 1~~
ui~~11' ~
nPON1~03tt~CN11Y! OO1lAN~lNNI yM/~ TYt. y~MtillVi S~~ ~ ~ i~;~ ~~�y
* GTN1~1 IIINt111U~ !1� YyIUWMA S ~
OOl'~~ NM OYQY~ Y i OA (~;Y� 1�AN�
' � NIIyL t
~ IloucuKyroad 21918 179 32,03 31,5 3G2 2~J1lJ' '
MaKCCOyro~~ ~ 15718 140 21~79 32,4 327 ~II1 ~
I~p8CH00PNC1~CKy nb 1.~1~. 13696 7b 12,96 ~S,Z 519 :1Gti9 ~
AoOponon~cy oa~12 11035 42 7,42 G2,1 834 ;lG4li
ApTewyron~ ~.1~ . . 11759 249 21~94 38,5 ~ lb6 4JIG -
O~~~oiixKn~ucyro 6295 100 10,83 31,4 178 18~4
II~~XTCpGK~11TQa N 1Z888 ~ 103 17,O1 35,0 369 .1~;~l1
TUpq~MTP~QMT ~1~ . . . . . 11181 90 13,78 , 33,1 ~ ' 367 19~3
OopowunoerpaA co ~].7~ . . 11~86 75 12,00 ~0,3 ~60 ;!0]0 ;
CTaxaMOryronb ~1~. . 9903 Il? 19~11 2tl,~ 244 1L;lt i
IlrpnowaRcKy .~i9~ 9~97 78 15,63 28,4 338 18U7
Kpac?roAOnyron~i
R?p~. . 9080 59 7,62 48,7 491 273J j
11oi~3accaHrpau~n' Z2288 154 26,37 34,1 433 '1147 ;
CDCP,A.IOD~HTQ~LL 9265 41 5,86 ' S9,8 693 2115 ~
Ilaenorpaatyronb~~ . 8812 53 7,87 57,5 520 ;i?�I~
YKp~anapyron~ ~ . 15084 9~ 11,62 52,9 538 :1�I~i
AneKCeeApuayrar~ .(25~ 10979 13 0,98 G3,9 862 �1W7
A1nNyrnenpou YCC~26~ 21094~1 1622 2~4,83 37,1 370 25SG ~
_.r..~
Key:
1. Frodu~tion asscciations 9. Donetskugol'
2. Coal output, thousands of T 10. Makeyevugol' ~
3. Number of active Norking faces 11. Krasnoarmeyskugol'
4~ Average active line of xorking 12. Dobr~pol'yeugol'
faces, km 13� Artemugol'
5~ Average monthly advance of active 14. Ordzhonikidzeugol'
_ working facea, m 15. Shakhterskantratsit
6. Daily load~ T 16. Torezantratsit
- far active face 17. Voroshilovgra,dugol'
_ 8~ for shaft-pit (adm. unit) 18. Stakhanovugol'
[Key continued on next page]
- 52
FOR OFFICIAI. USE ONLY
APPROVED FOR RELEASE: 2007/02/09: CIA-RDP82-00850R000100060060-8
APPROVED FOR RELEASE: 2007/02/49: CIA-RDP82-44850R000100064460-8
~OR O~FTCIAI. U3E ONLY
ig~ P~rvomay~kugol' 2~~ Pavl.dgr~,duga~'
20~ Kragnodonugol' 24, Ukxzapadugol.' ~
21~ Donbaesat~at~it 2~~ Alek~an~riyaugol'
22, Sverdlovantratalt 26~ Ukr~3nian SSR Ministry o~ the
Coal Indus~try
'Cable 2
\ `~,KONIIA~IttNO Mt~~~IN~11Q091NMM~ f~EON, GOOpy~Ol~IINN! k011O~A111YN
M ttQyNMM N~ OAItt1~ C yfAOM t11AlNM~ AO ,S~
~IQOMl~OAttrlNMMt Oafl,~MMlMN~' K Aob~ve Nf AeRet�
' KawV!lT~O I 6 Y41~ TYC~ t ~rp1UNt 04NC1MUR 1~� H~~NylM~ NI
I ~oN:tl~IZt I L ~r),T ~
� O
,QuNeu?cyronb ~ . . . ~ . . . 47 10~98 ' ~8~~ G58
~ hiaKeenyronb ~ . , . . , 38 74~4 b1,6 G47
KpacHOap?~cAcKyro b~~ ~5 8477 GS,~ 690
,~n6pononbcyroab ~.0~ , , . , 31 8218 80,5 gp~
WaxtepcKaurpa ~,1~~ 18 3200 . 28,2 yZ�1
Topeaai~tpauNr ~2~. 37 b712 56,7 5SG
BopowunourpaAyrons ~ 13~ 22 b268 53,8 715
CT87t8H00yP0Ab Elj~~' ~3 ' 72~b ~S~
ClepeoweflcKyron .,~],5~ 14 2187 258 5~9. '
KpeceoAONyronb~l . . ~ . . , 30 ' 6331 86;2 7Zq
- ,LlOH6YCC8Nipat(NT ~ : . , 43 . 9681 ~8 0 gg~
- � Cecptl~nea?~rp~uHr . . 34 8007. 92,4 ~ 794
noenorpaAyronb . , , . ~b ?675 gl,l 571
Y?cpaanaAyroab ( p~ , b5 10960 74,9 700
AneKCaHApuAyrolTb al~ 13 Z889 l00,0 � 8G7
b1NHyrncnpoM YCCP ~.22~ 483 9793b b7,8 G70
Key~
1. Production associations 10~ Dobrop~l'yeugol'
2. Comprehensively mechanized faces 11~ Shakhterskantratsit
equipped xith combines and 12. Torezantratsit
graders on beds xith angle of 13. Voroshilovgraflugol'
incidence to 35~ 14~ Stakhanov ol'
3~ Number 15~ Pervomayskugol'
4. Output, thousands of T 16~ Krasnodonugol'
5� 4~ of output from active xorking 17~ Donbassantratsit
faces on beds xith aCjSo 18, Sverdlovantratsit
6� 1~oad on longftall, T 19, pavlo adu ol'
7~ Donetskugol~ 20, Ukrzapadugol'
8~ Makeyevugol ~ 21, Aleksandriyaugol'
9. Krasnoarmeyskugol 22~ Ukraini~n SSR Ministry of
the Coal Industry
53
FOR OFFICIA:. USE ONLY
,
APPROVED FOR RELEASE: 2007/02/09: CIA-RDP82-00850R000100060060-8
APPROVED FOR RELEASE: 2007/02/49: CIA-RDP82-44850R000100064460-8
FOit O~FICIAL U9~ ONLY
- mab~.e 3
� .r
~ 2 tipo~ueuNC ao~rotorwtearNia~ oup~botoK
.
I~QON~IO~lf~laNM~ OOIIANNlNN~ ~�Y tNQ401qLLtNt N IIOlMt1~Al1~~q111MR _
' nA Y T.~ kM OA~My fl kM NY ~My
AnHeuKyrorb ~8~ 490,0 493,~ t01,1 ~10,0 214,3 101,1
Mak~cryroa~(~~ , 213,6 217,0 101,8 ,148,b 149,3 1UO,G
Kpocaoap~ieAcNyro b~~D~. 172~4 1b3,2 88,9 1b4,3 132,1 d~~,d
Ao6pononeeyr nb 1). . I79~0 170,8 95,3 119,7 105,9 8~,b
AprcMy~oab ,~12 339,0 ~39,0 100,0 1a5,b 185,1 IIH1,1
0~~ pA~OHIIKIIA3ey~0 b 139,0 138,9 98,4 7~,7 71,6 OJ,~1
WoxTepcKanrpa r 4.~ 144,0 148,8 101,8 518,0 98,8 1t1U,b
TopnaaKrp~uNr ~~,~5. 127~4 133,2 104,6 85,4 ~,8 I~11,:
- Bopow?+nnnrpa;ayr b(~.~ 174,8 170,% 97~7 08,0 9,9,5 1U0,3
CraxaHOeyronb . . I... 2 '100,5 122, ~
2t4,2 215, 0 143,8 1111,~
~eproMailcKyronb . 8~ 1b9~0 150,1 94,4 112,0 10Y,9 Jt~,;i
hpaeHO,~onyronb (1 132~0 129,~ 97,8 70,8 7~i,8 I~~~~,i1
AoN6accaurpauNr . 4~ Z76,6 268,2 96,8 14a,4 138,7 Uf~,l
Coepanouaii~rpauNr 103~9' 107,8 103,7 72,0 71,3 ;w~,U: �
IlaOnorpanyronb ( 22~ . 112,8 112,8 100,0 1Q5,9 106,0 IINt,~;~
YKp~ana,nyrnnb 3~ 134,2 139,6 104,0 115,6 119,4 IU:1,;t
AAlKCBHApIIpY~~onb ~~l~~ . 29,9 31,b 105,4 ~7,4 49,1 Ith~;:
MHNyrnenpoM YCCP (.2~~ 2940~4 2912,A 99,06 1931,2 1898,7 !�,2
Keys _
1. Production associations
2. Driving of preparatory drifts
3. a11
4. stripping and preparatory
5~ ~lannea, km.
6, actual, km
7. 9~ of planned
8. Donetskugol'
9� Makeyevugol'
10. Krasnoarraeyskugol'
11. Dobropol'yeugol' -
12. Artemugol'
13� Ordzhonikidzeugol'
14. Shakhterakantratsit
15� ~orezantratsit
16, Voroshilovgradugol'
17� Stakhanovugol' "
18. Fervomayskugol'
19~ Krasnodonugol'
_ 20. Donb~ssantratsit
21. 5verdlovantratsit ~
22. Pavlogradugol'
23� Ukrzapadugol'
- 24. Aleksandriyaugol'
25� Ukrainian SSR Ministry of the Coal Industry
5~+
FOR OFFICIAL USE ONLY
APPROVED FOR RELEASE: 2007/02/09: CIA-RDP82-00850R000100060060-8
APPROVED FOR RELEASE: 2007/02/49: CIA-RDP82-44850R000100064460-8
~OR OFFICIAt, US~ ONLY ,
Tab~e 4 r
I~tU11~Ae11H! t1tlAltittluNTCAL111+A IiU IEUtON C 1~ra~1111JH~lUI~111U~1t1 Ifhl~i)dM1iI1
~,1~ (2~ yr~~~N uunueu
~~~~~~U~u~r.1~~11n1111~IQ U/iL~~,1HIN'llqq l. ~ h tlG11l~II~All111 tl~Q.~~
` It~dCNNN M1.~ I T~~~~1~1111M1)
nA~ll~ N~I I ~ORty k4 I eGu~uh, .
re cG?~~trN uw~y,?,
_ - - .~.._...r..~_.~ - - ~~~~.u_AI I._._.~ AM I4~~/ A_u_ ,
Jluu~iu,yru,nt,~9 . , , _._233,0 7~3,7 7y,5 v-~-
~~I,u,~ ~ u~ i uni~ ~~0~ , I ~ I~d 153,9 yq~a 77,0 7y,U
I~~~,~~ uu;i~~~ti il~ky~ u1~b~~],~ 122,U I 15,b 75~4 3G 6 3U 7
,l~~r~~~~niu:t~,c rb IGS,U IG4~1 ~JG,7 115,0 IIU,7
1~~~~~aiyinnt~l3~ , 16U,U IG0,1 99,J IU,U 7,U
tt~~,~,i~uuuKUA~Cy~~nnb ,1.4 tib~U 68~~ 95,5 ~~p ~~y �
Ill.i~~,~~ri,uuipa iit ,15; y3,U 94,5 G4,5 l8,0 Itl,i
I'U~h.I,1111~ti111IIT ~16 . . b3,o 84,~ ~3,~ 9~5 ~,b
il~~~~wiu~n~ur~ianyr nb 1'j~ 1~2,0 122,U 76,3 73,0 21,U
~:i;~~;~~wnyron~ , 1a 14~1,0 IA6,7 79,8 IU,O U,y
I I~~~~nu~~;~iirK~~ron 103,0 9G~~ G9 2 8~U b,a
_ K~i,~run1jnii~'rCnb ~ ~ , . , $7,0 88,b $3,4 16,5 17~1
, l~niunrrau i Nauut 135,0 127,0 54,8 8 0 G U
~:n~p~tnuua~iipail~ir~ G8~0 6G~2 G1,4 2~0 0,1
il;ii~:wrpanyron~ ~a3~ . 109,0 109,7 97,5
~'K~~.~;u~any~onb , ~ . , I10,0 113~4 812 ~5~5 ~GUH
~\:a~~,c~~ntipus+yron~ ~2~j~ 25,0 25,5 81,0 25,Q 25,b
- ,~liuiyrn~~iipvH J'CCp ,~z~~ . Iy~5~0 1969,0 77~3 S68,0 SS7,7
Key:
1. Production asaociations
2~ Driving of preparatory drifts with mechanized ~oading of coal and rock
3. P lan, km
4. Actual, km
5. ~b of total length of driving drifts xhere loading is required
~ 6. including by combines
7. P lan ~ km
8. Actual, km
9. Donetskugol'
10. Makeyevugol'
11. Krasnoarmeyskugol'
12. Dobropol'yeugol'
13. Artemugol'
14. Ordzhonikidzeugol'
- 15. ShaIchterskantratsit
16. Torezantrat~it
17. Voroshilovgradugol'
18. 5takhanovugol'
19. Pervomayskugol'
20. Krasnodonugol'
21. Donbassantxatsit
22. Sverdlovantratsit
23. Pavlogradugol'
24. Ukrzapadugol'
25. Aleksandriyaugol'
26. Ukrainian SSR Ministry of the Coal Industry
55
FOR OFFICIAL USE ONLY
~
APPROVED FOR RELEASE: 2007/02/09: CIA-RDP82-00850R000100060060-8
APPROVED FOR RELEASE: 2007/02/49: CIA-RDP82-44850R000100064460-8
FOR OF~LCIAL U9~ ONLY : -
`f able ~
,
.+A , tiac Ubnu li? INr n~~H/~~
C 1C I1tIK11nti~AH ~ I t T Il1~Al~Hr If~ ~ NJ~7 f.
tlerepaGotKa yrnp uay ,
nGc,rntnirn~uwx ~?aGl7~
pnknx 3777U 133~17 9t3,8 U~,3
llcp~paGurka yran ua~8
yCt:1111tUKp% MCXpNH311�
pnununoA nnpn,~unW� ~
GnpKN , , , , . 11236 11471 102,1 ~d,8 -
C3w~1ycK kduuci~rpara~9~ 8J78U 8075~ 97,U 97,8
UWIIyCK yraeA kpy �
- IILIX N C~ICANNX KJ18C� ~ 10~
26'740 75308 94,G 9G,7
H r. ~i ANtp~uNT08~~ 1900U ~7650 g3,9 95,0
KAys ~
1~ Indices
2~ P1an, thousanda of T
3. Fulfillment of plan
4. thousands of T
. 5~ 9b of plan
6, ~ of 1977
7� Processing of coal in enrichment plants
8. Proceasing of coal on units of inechanized sorting
9� Output of concentrate
10. Output of coals of large and medium c],asses
11. Including ar~thracites
COPYRIGHT: Tzdatel'stvo "Tekhnika"~ "Ugol' Ul~ainy"~ 1979�
9~35
CSOs 1822
56
FOR OFFICIAL USE ONLY
APPROVED FOR RELEASE: 2007/02/09: CIA-RDP82-00850R000100060060-8
APPROVED FOR RELEASE: 2007/02/49: CIA-RDP82-44850R000100064460-8
~OR OFFICIAL US~ dN1.Y
~'IJEL3 AND itELA'~~U EQUIPM~N'T
UDC: 622.24.051
BIT FOtt D~tILLING C~ME~N'T PLUGS DESCRIBEll
Mogcow BUtt~NSYE in Russian No 3, Mar 79 p 9
(Article by S. M. D~nelyanee, A. A. Loginov, and A. A. Chernik: "Bit for
thilling CemenC ~luge"
(TexC~ CemenC plug drilling ie a crlCical operation which completes the
well construction cycle. This operaeion frequenCly ende in hard-to-repair
breakdowng, such as breaking of drill pipe. The main difficuley in repair-
ing Che consequences of auch occurrenceg lies in the impoeeibility of either
wiChdrawing the dxill bit or destroying it during eubaequent drilling due
to the high strength of the materials from which bit componenea are manufac-
tured. As a result it is necesaary to drill a new borehale section, and
this involvea considerable time and money. -
~
.
�
~
a: r
t
~
~
' ~ '~,r,~'4 w ~ .
,d
',:a.
:
~~~s~~k. , .
t~, ~
` ~~~y
. ~
Y~. Y
~T w
.r d
~n- y
~4~~ ~aF ~f
t~ fi - , .
General View of TsP Drill Bit
57
FOR OFFICI~L U5E ONLY
APPROVED FOR RELEASE: 2007/02/09: CIA-RDP82-00850R000100060060-8
APPROVED FOR RELEASE: 2007/02/49: CIA-RDP82-44850R000100064460-8
i
- COR OI~'~ICIAL US~ ONLY
M~riCin~ arteneinn in ~onneeCion a~eh ehi~ i~ Ch~ dev~lopm~nt ~f g~p~cinL
bie whiah h~~ b~en given eh~ prnvi~ional de~igngtion 'Tsp. On~ uf ehe ,
principal fe~Cure~ o� Chig biC is ehaC Che body i~ m~de of maeerials which -
can be ~a~i1y deseroyed (drilled rhrough) wieh pre~ene s~~ndard biCe.
'~~P bite 118 gnd 93 tmn in diamerer hav~ been built and reated by epecialiete
ar eh~ A11-Union ScienCific Re~egrch IneCituCe of Petroleum Technology and
eh~ Kuybyehevburmash Production Agsociation. The TaP are bits of abra~iv~-
curting aceion wieh gn gluminum ~lloy body into which hard-alloy teeeh have
been cold pres~-�it ineo mounting recesses fsee phoCoRrgph). Lf n~ceeg~ry -
ehes~ bitg can e~gily be subs~quently drilled through wirh gtgndard bitig.
The regults of tests on TsP bies performed by Che Neftegorsk brilling Opera-
tions Admini~traCion of ehe Kuybyshevneft' Aesociation ae we11 ae comparison
of these bits with bita normglly ueil~zed for drilling cement plugs indica~ed
a auf�iGiettely high ~fficiency of TsP biCs frnm Che standpoinC of principal
technical-enonomic drilling indices �ootage drilled and drilling rate (gee
table).
TsP Bit Num- Number of Total To~al Average ~
ber (Diameter, Well on ~ootage Drilling Drilling
mm) Which Test Drilled, m Time, Rate, m/h
Was Per- Hours
formed -
1
(118) 52 196 38.0 5,1 -
2
(118) 11 154 24.5 6.2
3
(93) 11 608 120.0 5.1
Note: Rotary drilYing was performed, with bit loading of 1.5-4.0 tona.
Work is presently in progress on determining the most efficienC shapes for
the working surfacea of the TsP drill bit body.
COPYRIGHT: Vsesoyuznyy nauchno-issledovatel'akiy institut organizataii,
upravleniya i ekonomiki neftegazovoy promyshlennosti (VNIIOENG),
1979
3024
CSO: 1822 END