_SIGNATURE RECORD AND ,COVER SHEET
DOCUMENT DESCRIPTION
REGISTRY
SOURCE
C I A CONTROL NO.
DOC. NO.
O
Jp
DATE DOCUMENT RECEIVED
DOC. DATE 0 j0e_V
f
COPY NO. 4
LOGGED BY
NUMBER OF PAGES IF,
NUMBER OF ATTACHMENTS
ATIVTION: This form will be placed on top of and attached to each Top Secret document received by the Central Intel-
ligence Agency or classified Top Secret within the CIA and will remain attached to the document until SI,ch time as it
is downgraded, destroyed, or transmitted outside of CIA. Access to Top Secret matter is limited to Top Secret Control
personnel and those individuals whose official duties relate to the matter. Top Secret Control Officers who receive
an{j/or release the attached Top Secret materiel will sign this form and indicate period of custody, in the left-hand
columns provided. Each individual who sees the Top Secret document will sign and indicate the date of handling in the
right-hand columns.
REFERRED TO
RECEIVED
RELEASED
SEEN BY
OFF ICE
SIGNATURE
D A T E
T I M E
D A T E
T I M E
S I GNAT UR E A N D O F F I C E
DATE
25
to
S
NOTICE OF DETACHMENT: When this form is detached from Top Secret material it shall be completed in the appropriate
riate
spaces below and transmitted to Central Top Secret Control for record.
DOWNGRADED
DESTROYED
DISPATCHED (OUTSIDE CIA)
TO
BY (Signature)
TO
BY (Signature)
WITNESSED BY (Signature)
BY (Signature)
DATE
Declass Review
DATE
OFFICE
DATE
Approved For Release 2006/04YOP: GKRb '03TO2228ROO0100230001-0
i
lid-.1 -3/
at~4, D-)~
PHOTOGRAPHIC. INTELLIGENCE REPORT
RUSTAVI CEMENT PLANT
2U DECEMBER 1957
RR-GP/DP-6-57
AfWvecl Re1M 201?4112WA-RUS3T0lWR0fW02 1-0 ft
TOP SECRET
BiAUi0h1Ai FlLE_COP~f
CENTRAL INTELLIGENCE AGENCY
Copy N
t
Im 11100
25X1
25X1
' AfMvedfMRe1W 201 /17 A-RM3TOJWROV*02 1-0 ^~
. TOP SECRET
Copy No.
PHOTO INTELLIGENCE REPORT
RUSTAVI CEMENT PLANT
December
RR-GP/DP-6-57
TOP SECRET
AgWved ft RelpW 20 11 3T0vWR0M022W1-0 '>? U
TOP SECRET
A~vedM Rely 20V /12MA-RM3TOIWRO1 O2 1-O M M
TOP SECRET
This photo analysis of the Rustavi Cement Plant is based on small
format photography
d has been prepared by the Photo
Intelligence Division of ORR. This plant was previously reported in
RR-GP/DP-1-57
. However, additional photo cov-
erage has made possible this more detailed analysis.
TOP SECRET
AMvedIft ReIM 20TWIl2MA-R?M3T0JWR0W02331-0 a
TOP SECRET
The Rustavi Cement Plant, probably built since 1950, * is
situated on the southeast edge of the Rustavi industrial complex
(see orientation map and map of Rustavi, USSR ). It occupies an
area approximately 3, 000 by 1, 1000 feet and is completely en-
closed with a high wall. The plant uses the wet process in the
manufacture of cement.
The following is a description of the probable flow of mater-
ials through the plant (numbers in parentheses refer to location
numbers on the accompanying flow chart).
Crushed material is brought in by railroad cars and stored
in six large silos which are adjacent to a grinding and mixing build-
ing (1) located southeast of a tall stack (3) (see accompanying photo-
graph). In this building the material is pulverized and mixed with
water, forming slurry. This sludge-like material is carried to
two tanks (2) west of the mixing building where the slurry is mixed
and stored? Water for this operation is provided by a probable water-
treatment building and two underground water-storage tanks (15)
located nearby. From the slurry tanks the mixture moves to the
filter building (4), where it is partially dried and fed into two rotary
kilns (5). Heat for the kilns is supplied by coal which moves from
open storage (13), probably by overhead crane (16), to a coal pul-
verizing and drying building (14) before being fed to the kilns. In
the kiins the partially dried slurry is changed to clinker, which
A search of available collateral has failed to disclose any mention
of the Rustavi Cement Plant prior to 1950,
TOP SECRET
Approved For Release 2006/04/12 : CIA-RDP03T02228R000100230001-0
A vedt"Rel 20{ 112OW-Rf 3TO ROtQO231ft1-0 - -
TOP SECRET
rrtt'v?es O t_h-P clia r c. l 'a J (6) d 15100 ixto
Ux 1 s.ta 'age
b,didirxg (7) at tie x~rte~st e*d. tie :tw! leis From fi
bud1di*g to ti er is e t to, ,a, -1*4er bin dip.~g' (8) *i
mize.d wit atker mal rial a*d ~ l i ;; d try bi c a m,
cerneat. r +h x ru ed by
r (9 *tv pwc i 'acct sla p
ova h a ( Q') Or t o s to r e ! X r a of 14 :c exh S t s itos: (13 )
cOr y4r a tezds from the J' bq d shipping wtrV`h, iO
$m l b i dht (121 ea red by dr e-tkr sigh r "act wh re h er t
is prb,al,
r ded o this trite l
Th-e fol ? w i W g additto fsciliti:ee axe visible 4x the y i side
Of
the 1
~ "t: a s.cixraiai,str*ti bsldij~g ('17)~ e lard w~r~h~;e
( 8) d ~ e gmal ex wsreh a ('18) witia passible air ge is pr3c
try, ice g$)ae ee [ter of the roof. O.sr th:e east side the, '
Moro Is a lard x? e* t rag ax 'a. (19.) with *u.m2R';f r s r s ` zld.
facet to a. sm "adl wsreeh` ise 8), l t ;g the 'ix nth W 1I ire
large .reh: usa (18) aad a sibl.e POL
b;ildijtg w#ti the pTaxt area sre..cerid with white dust
Rail ser rice is `y.de., i b t ,ap rx .s One ate : h> n
the aat ai*d aeries all rr . j*, -r p
fa.ltes: `Texhx er i~ifixi
the rth, v+ ,`ti uee ai :o, th.e .,nth W41, aid e.Xits k the Wbst .side
A rpRr`1 irr tely 25 railroad et" are isibjt.t* the plaZt area :=
ox-t ti ;ia, ili`ties alai a~cluci hard a r ~t rwacls ~qki 1 as i tid,
Out in a r io~t `g4ls r pa terns. Thy plat has ly two r:' i.cl _ k 'd eta
,
o~,e a the West eid# aid the Wtker fike s'*uShesst:
YARDS
Approved For Release 2006/04112: CIA-RDP03T02228R0001,00230.QQ -0
CEM'EN'T
PLANT
Apprp, d orRelease' 006/04/1'2 ?Pq,~ 1 3000
NITROGEN PRODUCTS
PLANT
RUSTAVI, USSR
COMMERCIAL / RESIDENTIAL AREAS
3000
Approved For Release 2006/04/12 : CIA-RDP03T02228R000100230001-0
11
HUSTAVI CEMENT PLANT
0 100 200 400 600 800 1000 FEET
Approved For Release 2006/04/12 : CIA-RDP03T02228R000100230001-0
61
1. GRINDING, MIXING AND STORAGE BUILDING
2. SLURRY TANKS
3. TALL STACK
4. FILTER BUILDING
5. ROTARY YILNS
6. CLINKER COOLERS
7. CLINKER STORAGE BUILDING
8. GRINDER BUILDING
9. CONVEYOR
10. PACKING AND SHIPPING WAREHOUSE
11. STORAGE SILOS
12. BOXCAR AND TRUCK LOADING POINT
13. OPEN COAL STORAGE
14. COAL PULVERIZING AND DRYING BUILDING
15. PROB WATER TREATMENT AND STORAGE TANKS
16. OVERHEAD CRANE
17. ADMINISTRATION BUILDING
18. MAINTENANCE AND SUPPLY BUILDINGS
19. OPEN STORAGE AREA
TOP SECRET
M Anvedf=Rel~ 20{111211,-RW3TOJSROt023j1-0 _ -
AWvecc Re"M 20=41140IA-R~3T0~R0~02~1-0 '.~
TOP SECRET