RETENTION OF AIRCRAFT 124 THROUGH 31 MAY 1968

Document Type: 
CREST [1]
Collection: 
General CIA Records [2]
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP71B00399R000600090007-8
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
4
Document Creation Date: 
December 16, 2016
Document Release Date: 
September 21, 2004
Sequence Number: 
7
Case Number: 
Publication Date: 
February 5, 1968
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP71B00399R000600090007-8.pdf [3]180.31 KB
Body: 
Approved For Release 2004/12/15 : CIA-RDP71 B00399R000600090007-8 THIS DOCUMENT REQUIRES SPECIAL HANDLING OXC 0017-68 Copy 1 of 6 THIS DOCUMENT CONTAINS INFORMATION REGARDING A HIGHLY CLASSIFIED ACTIVITY. PERMISSION TO TRANSFER CUSTODY, OR PERMIT ACCESS TO THIS DOCUMENT MUST BE OBTAINED FROM THE ORIGINATOR. HAND CARRY PROCEDURES WILL BE APPLIED TO ANY INTER-OFFICE OR INTRA-AGENCY MOVEMENT OF THIS DOCUMENT. 3 ~l c i ED2 11:H r tM1, rte, yea REFERRED TO RECEIVED RELEASED SEEN BY OFFICE SIGNATURE DATE TIME DATE TIME NAME AND OFFICE SYMBOL DATE D/M/OSA TOP SECRET Approved For ease 2004/1 /15 : CIA-R471 8003900600090007-8 25X OXC 0017-68 Copy I of 6 5 February 1968 MEMORANDUM FOR: Deputy for Materiel, OSA Comptroller, OSA SUBJECT: Retention of Aircraft 124 through 31 May 1968 1. The attachment provides a projection of sorties/flying hours available versus sorties/flying hours required during the period 15 April 1968-30 June 1968. This projection is based on the assumption the Deployed Task Force has been redeployed with the following: a. Five J-58 operationally-ready A-l2 aircraft (one additional aircraft will remain in hangar storage b. One trainer A-12 aircraft. c. Six operationally-ready Project pilots. d. maintenance capability to deliver five sorties/ month per available operationally-ready aircraft with an average sortie length of 2. 5 hrs/ sortie. This sortie rate is based on actual flying activity since deployment of the OXCART in May 1967, and it is considered to be a valid planning factor through June 1968. 2. Following is the desired and minimum A-12 sortie rate per month for each operationally-ready Project pilot: 25X 25X Sorties/Month 6 4 Average Sortie Length 2:30 2:30 G!'DUP 1 Excludec trDra autor.iati: downgrading er.d Approved For Release 2004/f 5 1 B00399 0006&QPAQQQt74 25X TOP SECRET Approved ForSease 2004/1115 - - P71 B0039S00600090007-8 OXC 0017-68 Page 2 3. Notwithstanding Paragraph 6 of DNRO Decision No. 19, January 1968, the dual-seat J-75 equipped trainer will be required through 31 May 1968 to maintain proficiency and operational readiness for Project pilots. The trainer is required through at least 31 May 1968 to provide following mandatory flying/training. This flying training can only be conducted in the two-seat trainer and will be accelerated as necessary to insure proficiency and operational readiness through 30 June 1968: a. Instrument checks b. Standardization checks c. Night air refueling /proficiency 4. Operational pilot sortie/flying hour requirements will be augmented as necessary in the assigned F-101 aircraft. 5. In view of hangar storage of one operational aircraft, request necessary reclama action be initiated through DNRO to retain Aircraft 124 through 31 May 1968. 25 25 'Deputy for Operations, OSA ATTACHMENT: as stated 25X1 OXC/O/OSA #1 - D/M/OSA #2 - Compt/OSA #3 - OXC/O/OSA #4 - D/O/OSA #5 - RB/OSA #6 - Chrono Approved For Release 2004/ 25 TOP SECRET Approved For ease 2004/1 71 B0039*0600090007-8 OXC 0017-68 ATTACHMENT 1. Following is a projection of flying hours available /required for period 15 April to 30 June 1968: Flying Sorties Hours 25 (1) (2) Five A-12 aircraft at 12. 5 hours per month (2. 5 hours per sortie) One J-75 equipped trainer at 15 hours per month (1. 5 hours per sortie) 75-DAY PERIOD TOTAL b. REQUIRED (MINIMUM ACCEPTABLE): (1) A-12 Flying - operational or training (Six operationally-ready pilots at 4 sorties per month--2. 5 hrs per sortie) (2) A-12 Flying Training in Trainer (Six operationally-ready pilots at 1-1/2 sorties/month) 9 13:30 75-DAY PERIOD TOTAL 83 183:45 RECAPITULATION: 2-1/2 Month Total Available 88 193:45 2-1/2 Month Total Required (Minimum) 83 183:45 NOTE: 1. "Available" computation is well within planning parameters outlined in Paragraph 7, DNRO Decision No. 19. 2. Trainer utilization to increase slightly in May to complete pilots' night requirements, instrument and standardization checks prior to phase-out of OXCART on 30 June 1968 Approved For Release 2004/1 /15 : CIA-RD 71 B00399R000600090007-8 25 T SECRET

Source URL: https://www.cia.gov/readingroom/document/cia-rdp71b00399r000600090007-8

Links
[1] https://www.cia.gov/readingroom/document-type/crest
[2] https://www.cia.gov/readingroom/collection/general-cia-records
[3] https://www.cia.gov/readingroom/docs/CIA-RDP71B00399R000600090007-8.pdf