Approved Fd~elease 0 78B047~14001400040027-4
C~ ~~ ~L
duly l~, 1966
ontract ng car
SubJect: Contract
Gentlemen:
#ncTosed $re three,.() copies Qfi the Mbnthly Status Report for
sab~ect Contract, covering the period from l dune to 3Q Jung
1966.
if there are any questions concernln,; the re~rt, please contact
the undersigned,
Very truly yours.,
25X1A
25X1A
Hager 25X1 A
ontract m ~ stratTon
JEH/~~
Enclosurest. 3 affi stated
Declass Review by NIMA / DoD
rskavr = ~
'~?G4,Up~C?,p'ROM AUTOir1Yi'TfC !-OWNc3lIAt~~t+1C
w1~ ~.,~ ~?~4~ICAT~o1L ~- This document coirtaius information
affecting the national defense of the Uxxited
States within the meaxxing of tix: Yspionage
I:aw~, Title 18, U.S.C., Sections 7S`3 and 794.
The transmission or the revelation of its
contents in any manner to an unauthorized
~"'~ ~ person is prohibited by law,
Approved For 2 DP78B04747A001400040027-4
'Approved Felease 2002/06/17
TO: Customer
DATE: 12 July 1966
SUBJECT: Monthly Contract Status Report #12
Advanced Liglit Tables
Period: 1 June t~o 30 June 1966
I> Objective
To design and develop three .A.dvanced Light Tables.
II. Summary of Work Performed During the Reporting Period
A . Table # 1
The table was inspected on 1 June 1966 anc~accepted y the COTR and
delivered to the Customer's facility on 8 June 19b `.----~h instruction manual
and engineering drawings have been written and printed.
B. Table #2
This table was inspected and deliver,ect with Light Table #1. The
engineering drawings are printed and the in~;truction manual is in publications
being copied and bound.
C. Table #3
The effort this month has been to complete the assembly of the table
and to design a suitable ventilating port design. The instruction manual for
this table is being typed by Publications. A]:1 engineering drawings are printed
and ready for shipping to the Customer.
III. Work Schedule Conformance
Delivery of Tables #1 and #2 have been made. Table #3 is assembled
and awaiting the COTR visit on 15 July 196b for inspection.
IV. Analysis of Work Covering the Reporting Period
We have come up with a suitable ventii~ating port design as the variation
in illumination of the High Intensity Trackin;; Light Sources was reduced from
30% to 13?jo. Also an electrical design than?;e allowed us to reduce by 2 the
number of leads from the transformers to tYie tracking light sources. This
reduces somewhat the bulk of this wiring and the wiring problem
V. Changes in Key Personnel
There have been no changes in key personnel during this reporC'ing period.
Approved For Release 2002/06/17 :CIA-RDP78B04747A001400040027-4
25X1A -
Approved Fc~elease 2002/06/17 : C -RDP78B04747A001400040027-4
Monthly Contract Status Report #12 (Cont'd)
VI. Trips, Meetings and Special Conferences
12 July 196b
25X1A The Customer visited n 1. June 19b6 and inspected Li ht
Tables #1 and #2 and signed t e > orm 250. On 13 June 196b
25X1A visited the Customer's facility to make adjustments on a shade an - ra ce.
VII. Plans for Next Reporting Period
1. After the Customer in.sper.ts Table ~#3 on 15 July deliver it to their
facility.
2. Complete the instruction manuals.
3. Ship the instruction manuals and engineering prints to the Customer.
Approved For Release 2002/06/17 :CIA-RDP78B04747A001400040027-4
Next 2 Page(s) In Document Exempt
Approved For Release 2002/06/17 :CIA-RDP78B04747A001400040027-4
Approved For Release 2002/06/17 :CIA-RDP78B04747A001400040027-4