Kirov Instrument and Electric Motor Pgant.
No 266 I I-re located in the
northern suburbs of Kirov, USSR, at 58-37-45N
49-39-10E, approximately 1.5 nautical miles
-northwest of the center of he city (Figure 1).
The plant is -rail served and surrounded by a
security fence. Over 246,700 square. feet of
floorspace, including a high-bay assembly build-
ing, were added to the plant I
Q Although the plant was -eyed by
photography in this
report is based on photography of
(Figure 2) because of its better quality; there
were no significant changes in plant facilities
between
Dimensions and descriptions of significant
iuV, uaan -
siructures in Plant No 266 are presented in
Table 1, which is keyed to Figure 3; Figure 3
also includes-perspective and plan views of the
new high-bay assembly building.
When first observed in II Plant No
266 consisted of 7-major buildings and IS minor
structures, containing- approximately 970,925
square feet of floorspace. A comparison of the
^ photography with photography ofII
reveals a. considerable -amount bf new-
construction. .During the period between
the high-bay assembly
building (item 1, Figure-3), a workshop (item 2)
-a steamplant (item- 3), and 2- administration
buildings (items 9 and 1-1) were all completed.
The total floorspace in the plant, including the
High-hay a=-embly bldg'
A-=embly--ection
High-bay section
Irregular
G,0 ~ 120 ~ 90h1
~O,AUO
(lorkshop
Irregular
,4-500
Ahrehau-e -
550 x (i 1
12,00
Rarehou-e
33. c a.
15.075
15hrehou-e
110 ~ ~ i
~(~
Forge foundry
Irregular.
-Gf, in
11 ork-hop
1(10 y '0
- ^.U1i0
Admini=tration
blda,
21: ~ (I 50
:S -ton'
Adn:ini-tration
b ldg,
4 G(I
44.1(,
tore
?
\lachine -hop
_ 21+?-5 130
... 0
new buildings, is approldmately 1,217,625 square
feet.
Construction of the high-bay assembly
building and the steamplant was undertvar in'
F_ I The
workshop and I of the administration buildings
.-\rl c-.ini-tration hld_. .Irregular
-tor,
\--o;:-.bly bldg. 4 -torn- 7,.-, v "I
.Adc,.n.-tration hld ? ? 1-1..' 45
(lurk-l,op - Irregular .
(larohou-e 15(1 \ 75
AeseeWly bldg :cork-hop Irregular - -
\bur,ire -i.op cork-hop Irru gubtr
Total fluor-pac?c of nunilu r?d?
_ building- -
Total floor-pace of other
buildings
Totes l'fluor-pace of Plant Ni _66
item 14) were first observed under construction
in. the workshop was complete
in. and Building, l4 in
The other administration building ;iteni al
was under construction in
complete- r,r - n
14
10 16
L2 _. 75 17 18
/
a
.
11 - 13 _ Hicy-eAr
/SECT AY
6 1 5 2
4
Railroad
Road
Fence
o Building
io0 0 500 ReIindicates new construction since 0
FEET (APPROXIMATE) Item numbers a& keyed to Table I
25X1
670'
_--235'-- - -
FIGURE 3. LAYOUT OF KIROV JNSTRUMENT AND ELECTRIC MOTOR PLANT NO 266 AND PERSPECTIVE ANDF"S
BUILDING I.
MAP,S OR CHARTS
SAC. CS Air Target Chart, S rice 900, Sheet 0155-NHL. {th ed. Sepg:i. ~ealc 1.200.000 (SECRET)