Published on CIA FOIA (foia.cia.gov) (https://www.cia.gov/readingroom)


CHINESE POWER PLANTS TSINGHAI PROVINCE

Document Type: 
CREST [1]
Collection: 
NGA Records (Formerly NIMA) [2]
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05161A000700010009-3
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
146
Document Creation Date: 
December 28, 2016
Document Release Date: 
February 25, 2003
Sequence Number: 
9
Case Number: 
Publication Date: 
June 1, 1966
Content Type: 
IR
File: 
AttachmentSize
PDF icon CIA-RDP78T05161A000700010009-3.pdf [3]13.4 MB
Body: 
0700010009 -3 MAGERY Chili CHIINESE -301NER PLANTS ISIING -{AO PROVONCE ALYS1S 0\4 ISION Declass Review by NIMA/DOD MP MOW PAGES 10 65147 DATE JUNE 1966 COPY Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 25X1 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 RECORD ICOPY NO. IPUB. DATE I COPY LOCATION MASTER DATE RECEIVED LOCATION D I SPO SIT ; DM D Al; s ApproveuEFol. Release 2003/05/C5_gvulA-RDP781tMA0001700010001-J -STOCK 441 MUM 6 CUT TO ,.., u COPIES DATE 7/7,, CUT TO COPIES DATE COPIES DESTROYED CUT TO COPIES DATE CUT TO COPIES DATE CUT TO COPIES DATE MASTER DATE DATE RECEIVED OR ISSUEDRECEIVED NUMBER OF COPIES DATE OR ISSUED NUMBER OF COPIES MO. DAY YR. REC.() ISS .0 BAL MO. DAY YR. RECO iSS'D BAL r 4 ^ ''.-1-, lin't W!? -AA I. i 4 i' Ac,)-? a; pj,(1-# I ,S g i _X 1 j _.?, /,zv,-/--9-'-i-le' 5 & /Y /el , 25X 1 Aoorovcd For RcIcNasc 2003/05/05 : CIA RDP781-05161A000700010009-3 TI TJ-F SEC. C ?(7, ?:":? .77 " Are-a saaaaa ASS. LOCATION 9C117 X1 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 211 REQUIREMENT C-RR5-83,218 CIA/IAD PROJECT -0647-6 ed For Release JL (L 'X -RDP78T05161A000700010009-3 CIA IMAGERY ANALYSIS uiv IJIUN CHMESE POWER PLANTS CIA/PIR 65147 TSINGHAI PROVINCE (A) Hsin-chen Thermal Power Plant (B) Hsing-lung Chuang Thermal Power Plant Approved For Releas; sautE-11. A-RDP78T05161A000700010009-3 5X1 443/05/ 05161A000700010009- CIA PIR 651L75 FIGURE 1 tll, 25 i ?.??/"' VU-men I rTihg-hsin Lao- un-Irnia II eng-hu Ta?ch'ai-tan T'a-erh-tm Pa-lung II Kan-tzu Batang Ya-a a sienlu 'ang-ting 0- ung-4 Tsethang TOP SH,RE T Appplved FoyReleas 2003/05 0010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 For Release? CIA IMAGERY ANALYSI A-RDP78T05161A000700010009-3 HSIN-CHEN THERMAL POWER PLANT CIA/PIR b5147 The Hsin-chen Thermal Power Plant is located on the western bank of the Po-ko Ho (River) in the southern sector of Mao-shan at coordinates 36 54 40N - 101 41 10E. The facility is rail-served, coal-operated, and includes a sub-station with two transformers, control house, large oil storage tank, pumping station, and numerous support/storage buildings. It is impossible to ascertain the number of boiler units because there are no dust-catcher units or flues visible on the available photography. There appears to be one set of three-cable power leads from the generator hall to one of the transformers. There has been no new construction during the period from 1962 through 1965. -1- Approved For ReleasICAOaT CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIATREPTIT05161A000700010009- TOP SECRET HSIN-CHEN THERMAL POWER PLANT CIA PIR 6514725E FIGURE 2 25X1 Approved For Release 200 051P5S:ECCRIAELUI-1 ii15161A000700010009-3 0 I 25Xll 25Xii Approv J1 11 1 1 1 ed For Release r4119; JL REF' -RDP78105161A000700010009-3 2 CIA IMAGERY ANALYSIS DIVISION HSIN-CHEN THERMAL POWER PLANT CIA/YIE b714( PHOTO DATA CONSTRUCTION ACTIVITY LEVEL OF PRODUCTION None None None None None Approved For Releas1C460 -2- ir r ID) Light smoke from stack A. Light smoke from stack A. Light smoke from stack A. Light smoke from stack A. Light smoke from stack A. IA-RDP78T05161A000700010009-3 2 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 11 5X1 11 5X1 211 the d For Release-Fej:?/ A-RDP71 CIA IMAGERY ANALYSIS DIVISION T05161A000700010009-3 HSING-LUNG CHUANG THERMAL POWER PLANT BE NUMBER - U1A/YIE t))141 Hsing-lung Chuang Thermal Power Plant is located within the confines of The facility is rail-served, coal-operated and includes two separate powerhouses, control house, sub-station with two possible trans- formers, six small oil storage tanks, administrative building, a bank of eight forced-draft cooling towers, and coal handling and treatment facilities. The newer and expanding plant appears to consist of five boiler units. Photography showed two widely spaced flues connecting the partly finished powerhouse to stack B, indicating that two units were in- stalled; subsequent expansion suggests that three additional units could be housed in the boilerhouse. The flue system for the entire plant has apparently been covered making it impossible to assess the number of boilers from the number and placement of flues. No power-cables could be discerned from available photography. An older and much smaller second plant is located east of the new facility. This power plant consists of one boiler-generator unit serviced by masonry stack A, a small sub-station with one probable transformer, three small water basins, and a spray pond. [ Extensive additions to the new powerhouse, erection of several su. ort buildings, and completi n of the new sub-station occurred between Approved For Releaa - 3- -CIA-RDP78T05161A000700010009-3 25X1 Approved For Release 2003/0itor ger T05161A000700010009- HSING-L1JNG CHUANG THERMAL POWER PLANT C.I.A/ PIE b5 14' (15 FIGURE 3 25f Approved For Release 2003/00B DP78405161A000700010009-3 II 25/1 25 HS ING -LUNG CHUANG THERMAL POWER PLANT .SECET Approved For Release 20013/0o/uo . UAIRIfflaffIT95161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP 1A000700010009-3 TOP SECRET 751 CIA IMAGERY ANALYSIS DIVISION HSING-LUNG CHUANG THERMAL POWER PLANT CIA/PIR 65147 2511 251 PHOTO DATA CONSTRUCTION ACTIVITY LEVEL OF PRODUCTION Boiler-generator sections for at least two units appear to be completed. Control building is finished and cable trenches and bus-bars are evident in the sub- station. The coal handling and processing facilities are complete and work is nearly done on a bank of eight forced-draft cooling towers. Construction of six small POL storage tanks is under- way northeast of the old power plant. None Uprights for three probable boiler-generator sections appear to be in place. ApprovedFor Release nommgE Light smoke from stack A. Light smoke from stack B. Possible light smoke from stack A. Poor quality photography/haze preclude analysis. Light smoke from stack B. Possible smoke from stack A. Vapor may be coming from cooling systems. ,DP78T05161A000700010009-3 211 Approv ed For ReleaseMpg REfrn7DP7 CIA IMAGERY ANALYSIS DIVISION T05161A000700010009-3 HSING-LUNG CHUANG THERMAL POWER PLANT CIA/PIR 65147 PHOTO DATA CONSTRUCTION ACTIVITY LEVEL OF PRODUCTION A support/storage building east of plant appears com- plete as is a new building south of the coal stockpile. Three new boiler-generator units appear completed, but may not be connected to stack B. None A covered flue system appears to be completed. Shadows preclude detailed assess- ment. Clouds preclude analysis. None -5- Approved For Releaskiik .Tc Light smoke from stack B. No vapor from cooling system apparent. Moderate smoke from stack B. Poor quality photography precludes further analysis. Light smoke from stacks A and B. Moderate vapor from at least two cooling units. Clouds preclude analysis. Very light smoke from stack B. Possible smoke from stack A. IA-RDP78T05161A000700010009-3 Approved For Release 200 Approved For Release 2003QP: CL: 61A000700010009-3 T161A000700010009-3 Approved For Release 7 0010009-3 HMAGERY NALYSIS PINEDITEDign,PH ORTN11 ?Ma (PCIYT RA LROAD CONS RUCTDON ACTM Y N SOFHWEST CHINA ISION GROUP I Excluded from automatic downgrading and declassification CIA/PIR DATE SECREY COPY PAGES Approved For Release 2003/05/05 ? CIA-RDP78T05161A00070001.000.9-3 35 25X 25X 25X1 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 RECORD ICOPY NO. IPUB. DATE I COPY LOCATION DATE RECEIVED ILOCATION MASTER DISPOSITION DATE (S) Approved For Releasa 2003/05/05 : STOCK MINIMUM MAXIMUM 10 OFAERDP78T0 161A000700I310009 CUT TO COPIES 0 DATE 1-73 CUT TO COPIES DATE COPIES DESTROYED CUT TO COPIES DATE CUT TO COPIES DATE ' CUT TO COPIES DATE MASTER DATE DATE RECEIVED OR ISSUEDRECEIVED NUMBER OF COPIES DATE OR ISSUED NUMBER OF COPIES MO. DAY YR. REC'D ISS.D DAL MO. DAY YR. REC.') ISS.D BAL 11 2 66 Pie t, Unit #39-48 10 10 , I q CA ci.- A/Pi c 4/ e79 /6 / ,i7 lS 1 , ,'i 7: 'Ll:)-L,,,,i-.7#7 ?- #.'? iP 1 0 6i) ' , P GI - r"---1 G L ' , - J ? ?3. 1 Mk No my ? ? ? 1 ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? TITLE 1 at a.. AKAIWAIL -111 /86A, Oct 1966 SEC. CLASS. LOCATION /ban r^-3 , - X1 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved For Release 20umf,5tttkftiDP78T05161A000700010009-3 CIA IMAGERY ANALYSIS DIVISION RECENT RAILROAD CONSTRUCTION ACTIVITY IN SOUTHWESTERN CHINA _tux 65148 Approved For Release 2d-daRMSECR:EI- RDP78T05161A000700010009-3 25 25 ?30. BURMA ?2o- THAILAND/ Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 /2 ? CH ENG-TU I-PIN /i H EI-CH IAN G TOP SECRET - V1I-C-00 146 FIGURE 1 25 25 giver NE1- CHIANG SOUTHWEST CHUNGKING CHINA r, HSIANG-TAN SH AO-YANG SH UI-CH ENG H ENG-YANG WEI-NING ? KU El-YANG / KUN- MING KUANG- TUNG LAOS TU-YUN KU EI-LI N LIU-CHOU LAO KAY NAN-NING NORTH VIETNAM Standard gauge railroad Standard gauge railroad under construction Meter gauge railroad ---- Abandoned construction GULF OF TONKIN 5.1 TOP SECRET - 100 0 100 200 300 NAUTICAL MILES aill Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 ilai NM inill 1111111 MI 11?111 IIIIIII Ell Mil 11111111 11?111 IIIIII Ink RDP78T05 Approved For Release 20136p5Necker CIA IMAGERY ANALYSIS DIVISION SUMMARY 161A00070001000 Recent aerial photography reveals that the Chinese have resumed significant railroad construction in southwestern China during the past 18 months. The construction effort has been concentrated on railroad lines that would directly link southwest China with the main railroad systems. The railroad lines covered in this report are the Cheng-tu (30 40N - 104 04E) to Kun-ming (25 04N - 102 41E), the Kuei-yang (26 35N - 106 43E) to Kun-ming, the Chung-king (29 34N - 106 3)4E) to Kuei-yang, the Hsiang-tan (27 51N - 112 54E) to Tu-yan (26 16N - 107 31E), and the Nei-chiang (29 35N - 105 03E) to Kun-ming Railroad Lines (Figure 1). All of the railroad lines covered in this report are standard-gauge and single track. Both the northern (Cheng-tu) and southern (Kun-ming) segments of the Cheng-tu/Kun-ming Railroad Line are under active construction. The Line is operational for 4 nm westward from Kun-ming with evidence of construction extending west and north for approximately 120 nm. On the Cheng-tu segment, the line is operational southward from Cheng-tu for approximately 130 nm with evidence of construction extending an additional 170 nm. The Kuei-yang/Kun-ming Railroad Line has been under intense construction during the past year, and is now probably complete. This rail line directly links western Yunnan Province with the main railroad network of China, thereby eliminating the need of using the North Vietnamese railroad system for rail service between these two areas. Photography datedi Irevealed that the Chung-king/Kuei-yang Railroad Line was complete. This rail line directly connects the Szechwan Basin with southwest China and North Vietnam. The proposed 500 nm Hsiang-tan to Tu-yan Railroad Line would provide a more direct rail line between southea.t and southwest China. Ninety nm of this railroad line had been completed Construction on this line 25 was halted during the retrenchment period and there is no evidence that construction has been resumed. The Nei-chiang/Kun-ming Line was designed to provide a second line between the Szechwan Basin and Yunnan Province. Seventy-two nm of this railroad line had been completed Construction was halted during the retrenchment period and there is no evidence that construction has been resumed. - 1 - Approved For Release 30904KREI RDP78T05161A000700010009-3 Approv 1 ed For Release tdp/OSEREr -RDP78- CIA IMAGERY ANALYSIS DIVISION r05161A0007000 10009-3 rin Railroad facilities are being expanded at Kun-ming. The Kun-ming Railroad Classification Yards and transfer site is being enlarged and a new standard- gauge yard has been constructed on the south edge of Kun-ming. Cheng-tu/Kun-ming Rail Line Page 3 Kuei-yang/Kun-ming Rall Line 4 Chung-king/Kuei-yang Rail Line 5 Hsiang-tan/Tu-yan Rall Line 6 Nei-chiang/Kun-ming Rail Line 7 Kun-ming Rail Facilities 8 - 2 - Approved For Release 21101:850360M- RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 TOP SECRET CIA IMAGERY ANALYSIS DIVISION CHENG-TUIKUN-MING RAIL LINE PIR 65148 Northern Segment The northern segment of the Cheng-tu/Kun-ming Rail Line is complete and operational from Cheng-tu southward to 29 28N - 103 31E, a distance of approximately 130 nm (Figure 2). Railroad cars were observed near the southern terminus of this segment in a yard at Chia-chiang (29 44N - 103 35E) (Figure 3). Active construction was observed from the present railhead south and southwestward to the end of construction at Hsi-chang (27 53N - 102 18E), a distance of approximately 170 nm. Roadbed grading, tunneling, and bridge construction can be traced almost continuously from the railhead to 29 14N - 102 55E. Several large construction camps were observed along this portion of the line (Figure ),I-). Intermittent areas of construction were observed from this point southward to Hsi-chang (Figures 5 and 6). Southern Segment The southern segment of this line has been completed from Kun-ming to 24 59N - 102 36E, a distance of approximately 4 nm. Active construction has been observed from this point westward to Kuang-tung (25 10N - 101 45E) and then northward to the Yuan-mou (25 41N - 101 51E) area, a distance of approximately 125 nm. Construction in this area consists of roadbed grading, tunneling, and bridge construction (Figure 7). Several large construction camps, vehicle parks, vehicles, and pieces of heavy construction equipment were observed along this segment of line (Figure 8). There is approximately 75 nm seperating the northern and southern segments of the line where no construction activity was found. The terrain within this gap is quite rugged and will necessitate many bridges and tunnels. - 3 - Approved For Release 2IPSP055g:RSII- RDP78T05161A000700010009-3 Approved For Release CiFfPg14-RDP78T051:1 o es 0009-3 ? 14ILIAN(.3 At: Cheng-tu C!, 44 :-..44HA CH/4':4;13 PM-65148 F_GURE 2 T I 3.35'j4 CH I M C'4I 41_14...YANG IC -5 H A e. .- 30? Zhia-chiang 1575x 1_ I CHAN-I K ang- ung , I An-nunrer 5tartdard guge completed r? StaadatthgaugelOgLabriitritClion = - - Meter gaugp-complp1ed,,,,r1j 5110 I -- 10 26 ?46---- so [Approved For ReleaSe'2003/0t/05 TOP SECRET A-Mil-1 to I 1/0 .44 ed'For Rel 004 5/0,5 : CIA-ROP OTO5t51A090700010009-3 Approved For Release '2003/05/05 : CIA-RDP78T05161A000700010009,3 7. Apprwv ea,e /05, ?,c Rp,p7, Pir4e,;?` 4c Otli0430MW0 Release 2003/05/05 : CIA-R0P78T05161A000170004:0009-3 ...,-to,;?47/0?)umv F 0 ri d For Release 2Erertiftelk- RDP78T051 CIA IMAGERY ANALYSIS DIVISION 61A000710010009-3 KUEI-YANGIKUN-MING RAIL LINE PIR 65140 The Kuei-yang/Kun-ming Rail Line has been under intense construction during the past year. It has been confirmed photographically that the entire line is now complete with one exception;/ \In order to show the difficult terrain through which this line was constructed Figures 10, 11, 12 and 13 are enclosed. The rapid rate of construction through this extremely rugged terrain indicates that the Chinese have placed great importance on this rail line. The following factors may have contributed to this fact: (1) a direct rail line to Kun-ming from eastern China eliminates the need of using the vulnerable, often interdicted North Vietnamese meter-gauge railroad system and the time-consuming transloading facilities at Ping-hsiang, China and (2) the Chinese now have the option of directly shipping material by rail from Central or eastern China via the Kun-ming - Lao Cai - Hanoi Rail Line. - 4 - Approved For Release 20TIM/FIECRIETPDP78T05161A000700010009-3 25 25 4 elease 2003 78T05 61A000700010o90 x 5100 1, 6540 10225, 10369 ---, -, Is 1. /4 ' I i , / 4 /.? . 1 / --.... . ( -, .1 ?-._ ..,-- -, '1-, /-- ft f??'1._ 1 It ?"., 1 `i 1 e,11..,... Ia ,1_ ji, il J 1 -.....- ?NI? .r)....t) / Wei.ning 7900 e.io A ? ... Shui-cheng .? , , , i 4 ?\4. ? __l_.,.,) ,...;) 1 erc?ou lisuantwei /1 t 219 9416 20 ? )...,? I t I i t I L _I I I I --- I i--11 1 11 /------" , 1 260 , ' - - -`,. _ _ ,, . / 41 s. c3 i _ ? -1%..'-' , ?,,, _ ..../."4"-.';:1---\ x i - CI' ' ?" ? -, ) Chan-) / , ..--...- ..../ r 1 .9006 t_,,,., t 14 ...,____.?, ? 1 /4- f 1.,..., ..Y.ANG _ --" --I/ 1 t \ 1 rl' , ? ...) 7941. / /I / / / I -1 \ ? 4., l / t Ft ) IF I' ? 5990 X , t1) f i (t- I \ 1,5900 45600 8250 Approved fib r lease-200319m5 ur ; I i 1 i 6796 I Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A0007000100 ApproVed,Fo Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 BEST COPY AVAILABLE Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 ? y1-6. For Release 2003/05/05 : CIA-RDI.711)416'WR:700010009-3 d For Release 2003/05/05 : Cl05161A00070001 TOP SECRETr912441 CIA IMAGERY ANALYSIS DIVISION CHUNG-KING/KUEI-YANG RAIL LINE 0009-3 PIR 6514b The Chung-king/Kuei-yang Line is the northernmost line of a rail system directly connecting the Szechwan Basin with southeastern China and North Vietnam. Photography revealed the presence of rolling stock in several yards along the railroad line - indicating that the line had been completed and was in use. The line extends from Chung-king to Kuei-yang, a distance of approximately 210 nm (Figure 14). Traffic can now move directly from Szechwan Province to western Yunnan Province utilizing both the Chung-king - Kuei-yang Line and the probably complete Kuei-yang/Kun-ming Rail Line. Approved For Release -5. ?HERE -RDP78T05161A000700010009-3 Approve 1 d For Release Direp5XWt- RDP78T05161A000700010009-3 CIA IMAGERY ANALYSIS DIVISION HSIANG-TAN/TU-YAN RAIL LINE PIR 65148 This line was projected to extend for approximately 500 nm in a westerly direction from Hsiang-tan to Tu-yan. The line would provide a more direct link between southeast and southwest China than the present rail line through Liu-chou (24 19N - 109 24E). This line has been completed from Hsiang-tan westward to the east bank of the Tzu-shui (River) (27 39N - 111 26E), a distance of approximately 90 nm (Figure 15). A spur branches from the main line at 27 49N - 112 02E and extends southward to Shao-yang (27 14N - 111 27E), a distance of about 60 nm (Figure 15). Evidence of abandoned construction exists from the railhead at (27 39N - 111 26E) southwestward to the Yuan Chiang (River) at 27 52N - 110 22E, a distance of 8o nm (Figure 15). On the western end of the rail line, evidence of abandoned construction extends from its junction with the Kuei-yang/Liu-chou Rail Line at 26 12N - 107 30E, approximately 30 nm eastward to 26 32N - 107 48E. - 6 - Approved For Release Agg0?/EcREIrek -RDP78T05161A000700010009-3 ET IA-R DP78TO 5161A000760 7t7 PIR-65148 FIGURE 1 ?N.,ei01-1f-ang 5? ? ,_,_ I d Pp,r?reles4 2003/05/05: CIA RDP78051614000700 -,--- 0 SEC ET 1, 10009-3 AUVC AL MILES 25X1 , -WM WT-WW ? ?? ? ? OF ? ? ? ??? ??? ??? - ? 5. ? PI.A115 Y II ' CII10.4.11SS P.0 PA DS 911. - - TOP. SECRET . F 3 - I' .. PIR-65148 . FIGURE t . ...... _ -... ...., UL'...... 4800' 8900 - . _ .... Z.7.0e 1.....L. ;6900 r i , i t ? ? . I ?. . ..., ....? ...?, ..... ...... ."... .. -"-- 1100 , et -1.-....--:?.1.-1-..,--1-.H...7? s - .. , 6700 - , " .... 4,7 00. 7 ."*.? . _,... ?...,:, . ..... ..?,? : ..... ',-.. : ..-. I , - . 580 :. 0. ..- 7,1,9 , ? I? ..4530 I , V!2* . 5137 _ . -:141,4,1 H , -- :" ' % Ian* 76 8 I . 28? . t i I ? 28 tang*, 45 . 2r\ _ \ ..tp,A, ? :. ? _ \ _ ilsin-hua a a 0,nt rotimatis% - I .- I ) .1 L' .6/67 ,... 81 88 _ .. - . _ 108" . . 7:3020 - _ .: .. 0 X. ........-----." I Sada ? I I .41177 1 1 1* . ....._ --- Shao-y 4152 , "--. ar a ,t, 111 a. 11 ...._ 11 .1 .4.,6, l ?, .., Ij / ;)'''' I S Il ?i`r-- - 1'; ' I1 t...", , .1 CH ' LI.CrIOU ' A0ADONED 0 9 94 .d ? ?-? .7/ t2 . _i.-- . 1179 88 i. ., L. - HSIANG-TAN , 4( , .... - _ ... R ft, A , I 26?,'r'--' ' I --- .- k , ' 5455 . 5118 26* .0550 . I J sr1 , .,.. karst I I : .... t '..` d construct' sa . LI . ^. -P C.,,. '.., t* ... , V , ... I . I , 637 I , . : I 67,26 ' . r 1 .,C1 41{4 t.4 ' A.'' . smciez. 1 00,0114..* T } eAPi.,/, I ...F, I A.,!" "1 '.,i ' NAUTICAL 11, k I S .,-.._ " . ''' * . . I , . h , NS, ..,.., ? MEgiifl ,...? tint, i, ,, : .,,, r)c,. < __ . I + 'LI 41, ' ' ' , ? . . `.. iMMIggOklr'ker.a.fr7)7t.:-.:,. r-- Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 TOP SECRET CIA IMAGERY ANALYSIS DIVISION NE11-CHIANG/KUN-MING RAIL LINE i-'11-( 0)140 This line has been completed from Nei-chiang southwestward to An- pien-chang (28 39N - 104 26E), a distance of approximately 72 nm. Abandoned construction extends from the railhead southward into the Ta-Lou Mountains to 28 23N - 104 15E, a distance of approximately 22 nm (Figure 16). The Kun-ming segment of the line may be one of two areas of railroad construction. The first alternative is a segment of abandoned rail construction extending from the Kuei-yang/Kun-ming Line at 26 39N - 104 32E northward for 5 nm. Abandoned ground scarring and bridge construction has been observed along this segment (Figure 17). The second alternative is an operational segment extending from the Kuei-yang/Kun-ming Line at 25 17N - 103 15E northward to 26 02N - 103 12E, a distance of 35 nm. There is light construction activity beyond the railhead northward to 26 11N - 103 07E, a distance of approximately 13 nm (Figure 19). - 7 - Approved For Release M/A0gA -RDP78T05161A000700010009-3 _Apkoved.FO11.. Release , Ts5 Hsuan-wei 0 1669 BA-RDP78T051-81-AOGO7O90150094-3-L-1--"Ellt43)f 46 FIGURE 16 Tzu-I iu-thing I-pin An-pien 0 Wei-ning Nei-chiang Shu-Cheng 1 0)(1 5X1 An-shun Hsun-tien Chan-i Kun-ming Approved For Release NEI-CHIANG/KUN-MING RAILROAD Completed _ Active construction ---- Inactive construption ,7zA Josibly complete 05161A000700010009-3 50 NAUTICAL MILES 25X1 r-- 1 11 R.9 LI Og JHI 1L 6,4f1P) yed or Re ,711 f s ? , 61A09 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 ved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 1ZE 19 W1)) OYF COM PICT DON tt, '40M) 26-lifl 103 Approved For Release 2003/0570 CIA-RIDP78T05161A0007000100g 25 I Approved For Release 2003/05/05 : Cl TOP SECRET=161A000700010009-3 tall 02140 CIA IMAGERY ANALYSIS DIVISION KUN-MING RAIL FACMTIES Recent aerial photography reveals that the rail facilities at Kun- ming are being expanded (Figure 20). The facilities are described below. 1. The -ming Railroad Classification Yards and Transfer Site (Figure 21). This installation contains two yards: a a classification yard consisting of 8 standard-gauge tracks and (b) a transfer site consisting of 4 meter-gauge tracks and 3 standard- gauge tracks. Other facilities in these yards include a turning wye, storage areas, and repair facilities. A large construction area indicates further expansion of this installation. The Kun-ming Railroad Car Repair Plant Southeast is located just south of the yards. uge Kun-ming Railroad Station Yards and Shops North I I(Figure 22). This installation consists of a 7-track passenger freight yard, a 10-track holding and storage yard, repair shops, and a turntable. 3. The Kun-ming Railroad Station and Yard South (Figure 23), is possibly being used for both meter and standard-gauge equipment. The yard consists of freight and passenger sidings and a 4-track storage yard. 4. A new standard-gauge, 5-track yard has been constructed on the south edge of Kun-ming (Figure 24). A construction area just east of this yard suggests further rail facility expansion. Approved For Release - 8 - f?!letk RDP78T05161A000700010009-3 OP SECRET Approved For Release 2003/05/05 : CIA-RDP78T0 161A000700010009-3 SOUTH STATION AND YARD NEW YARD NO 1 KUN-MING RAILROAD FACILITIES CONSTRUCTION AREA NO 1 / \\/ / \ / \ / \ / \ / \ / \ \ \ N \ \ NORTH STATION AND YARD 9 PIR-65148 FIGURE 20 RAILROAD CLASSIFICATION YARD, SHOPS AND TRANSFER SITE \ N \ \ \ \ \ \ \ \ \ ?.STANDARD GAUGE RAILROAD METER GAUGE RAILROAD 1000 0 Approved Fors&lease 2003/05/05 : CIA-RDP78 FEET (APPROXIMATE) -UP SERE- 161A0 10-0100 25 U9-.3 5 TOP SECRET' Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 FIGURE 21 DUN-MING RAILROAD CLASSIFICATION YARDS, SHOPS AND TRANSFER SITE CONSTRUCTION AREA ----- CONSTRUCTION AREA CLASSIFICATION YARD T NAPES SITE TO WORN NIETN RAILROAD CAR REPAIR PLANT STANDARD GAUGE RAILROAD METER GAUGE RAILROAD FEET l? ...MATE) TOP SE E ?RDP78T35161A000700010009-3 FIGURE-22 KUN-MING RAILROAD STATION YARDS AND SHOPS NORTH FEET (APPROXIMATE) A600700010009 3 Ariproved For Release 2 Fi PLT KUN-MING RAILROAD STATION AND YARD SOUTH 500 0 1500 FEET (APPROXIMATE) RDP78TO 161A000700010009-3 FIGURE 23 Approved For Release 2003/05/05 : CIA- TOP SECRE- RDP78T05161A000700010009-3 25X1 X1 Approved For Release 2T0003P/05s/MIA N KUN-MING NEW RAILROAD YARD NO 1 AND CONSTRUCTION AREA 500 0 1500 FEET (APPROXIMATE) -RDP78T 05161A000700010009-3 NEW RAILROAD YARD NO 1 0, ( I )1 \ I CONSTRUCTION AREA 1 (1 FIGURE 24 X1 Approved For Release 20031 05lEgigfl I P78T05161A000700010009-3 25X1 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approv d For Release 2 MAPS AND CHARTS RDP78T05161A000700010009-3 CIA IMAGERY ANALYSIS DIVISION REFERENCES PIR 65146 ACIC. USAF Jet Navigation Chart, Brahmaputra River JN 37, Scale 1:2,000,000, 4th ed., October 1965. (UNCLASSIFIED) REQUIREMENT c-RR6-83,781 CIA/IAD PROJECT 30079-7 - 10 - Approved For Release 20WitiatagTPDP78T05161A000700010009-3 25 25 Approved For Release Approved For Release I amsi 7T05161A000700010009-3 T05161A000700010009-3 Approved For Rp:. r 07/05 :e?el-/OK90 e. 4 t D 6 t 41, Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved For Releas rri 519tMl TO5161A PHOUCD?RLONOC ORM110?MCM G2MPOW o=_MoiCcl m?m? CHNESE POWER PLANTS HOPEH PROVNCE 00010009-3 HMAGERY ALYSIS VISION GROUP I Excluded from aurora:Rio downgrading and declassifIcation SERU PAGES 57 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 CIA/PIR 65150 25 25 DATE JUNE 1966 COPY 25X1 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved rc REQUIRENENT C-PR5-83,218 CIA/I0 PROJECT 30g7-6 r Release 200136ligngteittilUP (8 I 051 61A000700010009-3 CIA IMAGERY ANALYSIS DIVISION CIA/PIR 65150 CHINESE POWER PLANTS HOPEH PROVINCE (A) Han-tan Thermal Power Plant (B) Hsia-hua-yuan Thermal Power Plant (C) Hual-lai Hydro Power Plant (Kuan-ting) (D) Lin-hsi Thermal Power Plant (E) Mi-yun Hydro Power Plant (F) Pao-ting Thermal Power Plant (G) Peiping Heat and Thermal Power Plant MTS (H) Peiping Thermal Power Plant (Chang-hsien-tien) (I) Peiping Thermal Power Plant (Kao-china) (J.) Peiping Thermal Power Plant (Shih-ching-shan) (K) Ping-shan Hydro Power Plant (L) Shih-chia Chuang (Shih-men) Thermal Power Plant (N) Tang-shan Thermal Power Plant Tientsin Thermal Power Plant No. 1 (0) Ting-hsien Hydro Power Plant T1Approved For Release 200r301B/dECCRI DP78T05161A000700010009-3 25 25 25X Approved For Releaee 2003/05105 : CIA Hsi-tin TOP SECRET (Pei- IA PIR 5150 - FIGURE, 1 Erh-lien ? ,P'ang-pai fi-u,,erh-ch'a-han no-erh 0 Ta-erh Su-ni-t'e-Yu-ch'i ? (Hsi-su-ni-Ve-wang-fu) ei-ch'ang uan ? ho-hao-t'e Chi-ning ?Chang-pei Kaigan ? (Chang-chia-k"ou)_. uan-hua oFeng-chen Ling-ch' i u TIENtS1 ai Via '2 Pao-te i4YUan-p'ing ? Hsin-ting (Hsin-hsien) toTs'ang-hSien yang_ch,uan T:Al_y_e)AN`p oyu_tz,u H N Fen-Yango 1/P0 'ing-yao Hsing-t'aio TSINAN fr) ,z.- \ --': Ch'ang-chih , P 0 ? , ' '0 Lin-fen Wei-tang (wei-hsien) 0 Tzu-po (Po-shan) ANT U An-yang ? .? Hao-pi ? Hao-pi-chi) Cr...varlEP TOP SE e o Hsin-hsiang Chiao-tso h ? -f OU 0(Tzu-Yang) Chi-ning DP78T0 161A000700010009-3 / -- Lien- 0 it RECORD 'COPY NO. IPUB. DATE COPY LOCATION MASTER DATE RECEIVED LOCATION D 'APW6M9393F tkiease 2003/05/05 : dgf1DP78T0 Ygl' Adbomobi0009- MAXIMUM7 CUT TO COPIES 0 DATE 7-72 CUT TO COPIES DATE COPIES DESTROYED CUT TO COPIES DATE CUT TO COPIES DATE CUT TO COPIES DATE MASTER DATE DATE RECEIVED OR ISSUEDRECEIVED NUMBER OF COPIES DATE OR ISSUED NUMBER OF COPIES MO. DAY YR. REC.() ISS 'D BAL MO. DAY YR. RECD IBS'D BAL 8 9 68 DeLt. Unit # 41,43-48 7 7 e- Aparoverl For Release 2003/C5105 ? ciA_Rnp78Tns1 Ai Annn7nnni WV1-3 . TITLE Ii!IC 1 21A 63150 JUlai: 1966 SEC. CLASS. Tsr---1 LOCATION 24940 25X X1 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 -ik-riroved For ReleasiedOgittEiCIA-RDP78 CIA IMAGERY ANALYSIS DIVISION HAN-TAN THERMAL POWER PLANT 111.1_1/4, JAupLui,JA - T05161A000700010009-3 CIA/PIR 65150 Han-tan Thermal Power Plant is located in the northeast sector of Han-tan at coordinates 36 36 10N - 114 26 30E. The facility is rail- served, coal-operated and consists of a sub-station with at least five transformers, a control house, settling pond, coal handling and processing facilities, and numerous support/storage buildings. Coverage was poor over Han-tan and it was impossible to ascertain the number of dust-catchers and flues serving the boilerhouse; however, the size of the boilerhouse indicates that there could be at least five units connected to stack A and at least two units connected to stack B. Power cables could not be detected leading from the generator hall. There has been no significant change during the specified period from 1963 through 1965 -1- Approved For ReleaROBVERET : CIA-RDP78T05161A000700010009-3 2 Approved For Release 2003/05/0.5 ? CIATDP7i8T05161A000700010009- TOP SEuRET HAN-TAN THERMAL POWER PLANT 25)(1 JJ/?'.L1- b315025! FIGURE 2 Approved For Release 2003/0 TOP RI 5161A000700010009-3 15 25X1 Appro 21 ved For Releasettp/Sktitttr-RDP7E CIA IMAGERY ANALYSIS DIVISION T05161A000700010009-3 HAN-TAN THERMAL POWER PLANT CIA/PIR 65150 PHOTO DATA CONSTRUCTION ACTIVITY LEVEL OF PRODUCTION None None apparent. Poor quality photography precludes assessment. None apparent. Poor quality photography precludes assessment. Poor quality photography precludes analysis. None None -2- Approved ForReleasna AffdiElb Light smoke from stack A. Light smoke' from stack A. Heavy smoke from stack A. Appears to be light smoke from stack A. Moderate smoke from stack A. Moderate smoke from stack A. IA-RDP78T05161A000700010009-3 Approved For Release 2001b5()0W1 1A000700010009-3 U1A/f111. 0)1)J CIA IMAGERY ANALYSIS DIVISION HAN-TAN THERMAL POWER PLANT PHOTO DATA CONSTRUCTION ACTIVITY LEVEL OF PRODUCTION None _ Approved For Release 200TOP0?EM-12 Light smoke from stack A. DP78T05161A000700010009-3 251 251 25X1 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 For Release 21:6$95?rcife-RDP78T01161A000700010009-3 HSIA- CIA IMAGERY ANALYSIS DIVISION NPIC NUMBER - 38 CIA/PIR 65150 The Hsia-hua-yuan Thermal Power Plant is located within Hsia-hua- yuan proper at coordinates 40 29 CON - 115 15 55E. The facility is coal-operated, rail-served and includes three natural draft masonery or reinforced concrete cooling towers, a sub-station containing one transformer, a probable cooling pond and extensive coal handling and processing facilities. The powerhouse is of several distinct designs, having been enlarged several times. The boiler house probably contains three units, and has space for at least two more in the newer and larger western section. The generator hall has only one set of power leads; these connect the newer generator hall section to the single transformer. No new construction occurred during the 1962 through 1965 period. Approved For Release 2iltragrcqt -R0P78T05161A000700010009-3 25 25 25 25 Approved For Release 209161:5?theillA-RDP'8T05161A0007000100 HS IA -HUA -YUAN THERMAL POWER PLANT 09-3 CIA/ PIR 65150 FIGURE 3 Approved For Release 20 05161A000700010009-3 25 1 12 Approve d For Release 2Crip5/gte kEl CIA IMAGERY ANALYSIS DIVISION 5161A000700010009-3 HSIA-HUA-YUAN THERMAL POWER PLANT CIA/PIR 65150 PHOTO DATA CONSTRUCTION ACTIVITY LEVEL OF PRODUCTION None None None None None Approved For Release 215 -5- osiocReqk Light smoke from stack A. Moderate vapor from cooling tower A. Light smoke from stack A. Light vapor from cooling tower A. Light vapor and inflow at cooling pond D. Light smoke from stack A. Heavy vapor from cooling tower A. Light vapor from cooling tower B. Light vapor from cooling pond D. Light smoke from stack A. Moderate vapor from cooling tower B. Light vapor from cooling pond D. Light smoke from stack A. Heavy vapor from cooling tower A. RDP78T05161A000700010009-3 Approve d For Release 208f0g/Ete -RDP78T05161A000700010009-3 CIA IMAGERY ANALYSIS DIVISION HSIA-HUA-YUAN THERMAL POWER PLANT U1A/YIE b)l)U PHOTO DATA CONSTRUCTION ACTIVITY LEVEL OF PRODUCTION None None None Approved For Release -6 - /SEER Fici Light smoke from stack A. Moderate vapor from cooling tower A. Light vapor from cooling towers B and C. Light smoke from stack A. Light vapor from cooling towers A and C. Probable light smoke from stack B. A-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 d For Release 18ti0ntAf.t4-RDP78T05161A000700010009-3 CIA IMAGERY ANALYSIS DIVISION HUAI-IAI HYDRO POWER PLANT (MAN-TING) NPIC NUMBER - 45-A CIA/PIR 65150 The Huai-lai Hydro Power Plant is located approximately 0.75 nm south of the Huai-lai Dam at coordinates 40 13 05N - 115 36 40E. The water appears to enter an intake located on the eastern sector of the Huai-lad Dam and is carried south approximately 0.75 miles to a possible buried surge tank (located within the sub-station) and then dropped through buried penstocks to the generator hall. It is difficult to ascertain the number of turbines because the discharge outlets cannot be seen; however, the size of the plant indicated that there is adequate room for two or three turbo-generator units. Two or three possible transformers appear to be located adjacent and immediately north of the generator hall. The sub-station is located above the plant and is connected by a probable elevator shaft. Of the missions that covered this plant, provided the only coverage that showed turbulance There has been no change or construction during the specified period from 1963 through 1965. Approved For Release 2 ifsta r r - 7- RDP78T05161A000700010009-3 X1 Approved For Release 2003/i ThiMA-RDr78T05161A0007000100091 D HUAI -LAI HYDRO POWER PLANT (KUAN -TING) II 0.75 nm from inlet to power plant Approved For Release T [') ' RIET II .1 a A re. ; T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Appro ed For Releasfdrrn CIA IMAGERY ANALYSIS DIVISION tIA-RDP7 8T05161A000700010009-3 LIN-HSI THERMAL POWER PLANT NPIC NUMBER - 133-A CI.A/PJd- b1 The Lin-hsi Thermal Power Plant is located in the center of Lin-hsi at coordinates 39 43 lON - 118 26 30E and is coal-operated and rail-served. The complex includes three large cylinderical cooling towers and a probable cooling pond. The plant is located adjacent to a large coal mining operation. The powerhouse is old and has been enlarged several times. The resultant heterogeneous construction makes a detailed analysis of components questionable; however, there are twelve small stacks on the boilerhouse roof suggesting that as many as twelve boiler units may exist. No power cables or other indications of generator capacity were observed. There has been no new construction during the specified period from 1963 through 1965. Approved For Release -8- eCigr-R froT A-RDP78T05161A000700010009-3 2 Approved For Release 2003/05/05 : CIA- 05161A000700010009 TOP SECRE LIN HSI THERMAL POWER PLANT CI.A PIR 515025f 25 FIGURE 5 Approved For Release 200 05161A000700010009-3 211 Approve d For Release 20Mr/SIERFT RDP78T05 CIA IMAGERY ANALYSIS DIVISION 161A000700010009-3 LIN-HSI THERMAL POWER PLANT CIA/PIR 65150 PHOTO DATA CONSTRUCTION ACTIVITY LEVEL OF PRODUCTION None None None None None None -9- Approved For Release gait, X- No smoke observed. Moderate vapor from cooling towers B and C. Appears to be moderate smoke from stack G. Moderate vapor from cooling towers A; Bs, and C. No smoke observed. Possible light vapor from cooling towers A and B. No smoke/vapor observed. No smoke/vapor observed. Moderate smoke from stacks A or B and G or H. Heavy vapor from cooling tower C. RDP78T05161A000700010009-3 25 25 25 Approv ed For Release p/QA-RDP78T CIA IMAGERY ANALYSIS DIVISION LIN-HSI THERNAL POWER PLANT 5161A000700010009-3 CIA/PlE (D)1)U PHOTO DATA CONSTRUCTION ACTIVITY LEVEL OF PRODUCTION None None -10- Approved For Release No smoke/vapor observed. Light vapor from cooling towers A, B, and C. A-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 lxi 25X1 Appro ved For Releampgr 05161A000700010009-3 CIA IMAGERY ANALYSIS DIVISION -.MN umpn PnWTP PT.LATM IT BLEW NUMBER - 39-A. The Ni-yun Hydro Power Plant is located 6.7 nm north of the center of Mf-yun at coordinates 40 28 45N - 116 49 15E. Water enters an intake pump house west of the dam and is then tunneled south 0.7 on to a probable buried surge tank and then dropped through buried penstocks to the power house. The plant contains six tailwater outlets which suggests that there are six turbo-generator units. A sub-station with possible control house is situated immediately west of the power house; no power cables or trans- formers could be discerned on the available photography. An analysis of the 1965 showed no signs of missions covering this plant from 1963 through turbulence Approved For ReIe from the spillway outlets or new construction. -11- : CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/0?jp GME4OP78TO 161A000700010009-3 MI-YUN HYDRO POWER PLANT 25X1 254 CIA/PIE b5i5o FIGURE 6 Approved For Release 2003/05/05 : CIA-RDP78T05 61A000700010009-3 TOP SECRET Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 25X1 roved For Releampatitt [et-A-Itll78T05161A000700010009-3 CIA IMAGERY ANALYSIS DIVISION PAO-TING THERMAL POWER PLANT NPIC NDYBER - 2 CIA/PIR 65150 The Pao-ting Thermal Power Plant is located 4.5 nm northwest of Pao-ting Airfield at coordinates 38 52 40N - 115 25 40E. The facility is coal-operated, rail-served, and includes six small oil-storage tanks, sub-station with at least six transformers, two spray ponds, extensive coal handling and processing facilities, and numerous support/ storage buildings. The powerhouse is being expanded and apparently consists of two operable boiler-generator units. The boilerhouse is equipped with two sets of dust-catchers and is connected by two sets of four-duct flues to masonry stack A. Space for a third boiler unit exists but there is no dust-catcher unit installed and the flue system is still incomplete. Two sets of three-cable power leads are visible leading from the generator hall to the control house. One boiler-unit and a probable maintenance building were added during the period from 1963 through 1965. -12- Approved For ReleaaadS% CIA-RDP78T05161A000700010009-3 IMENIMMMIII=1=1111IMEMIIMEMINFINI Approved For Release 2003/05/0519FIM 61A000700010009-3 PAO-TING THERMAL POviER PLANT ( CIA/PIR 65 ]2X 11 FIGURE 7 1 Ii Ii Approved For Release 2003/05/0RM 78T 5161A000700010009-3 ii Ii Ii II II 251 25X1 21 Approved For Release 2f(0306ffi. ClAiRDP78T05161A000700010 PAO-TING THERMAL POWER PLANT CIA PIR 6510 FIGURE 8 I5X1 Approved For Rel TOP SECRET se 20031051 -RDP78T05161A000700010009-3 CIA-RDP7 App roved For ReleasKypOSTEIRT CIA IMAGERY ANALYSIS DIVISION 8T05161A000700010009-3 PAO-TING THERMAL POWER PLANT [10 PHOTO DATA CONSTRUCTION ACTIVITY LEVEL OF PRODUCTION The boilerhouse addition appears to be largely completed except for in- stalling a dust-catcher and connecting the new unit to stack A. A second coal conveyor has been constructed alongside the first. No apparent change. -14- Approved For ReleMP2OW613g Moderate smoke from stank A. Sevensprinkler units are in operation in spray pond A. Six units are in operation in spray pond B. Moderate smoke from stack A. Two spray units are in operation in spray pond A and B. : CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 roved For Releattipant 1CI-A-R151178T05161A000700010009-3 CIA IMAGERY ANALYSIS DIVISION PEIPING HEAT AND THERMAL POWER PLANT MTS CIA/PIR b5150 Peiping Heat and Thermal Power Plant is located in the southeastern sector of Peiping at coordinates 39 54 40N - 116 28 10E. The facility is rail-served, coal-operated and consists of a sub-station with ten probable transformers, control house, steam line running eastward, bridge crane, coal unloading building and coal processing system, eight revetted oil storage tanks, and a possible water purification system. The boilerhouse is divided into two sections and appears to contain seven boilers. The western section has six sets of dust catcher units and is connected to masonry stacks A and B by six pairs of flues; the eastern boiler section has one dust catcher unit and one set of flues that connect to masonry stack C. There are four visible sets of power cables leading from the generator hall; two sets connect to the control house, one set connects to a transformer, and a fourth set leads to a small building near the sub-station. No new construction was apparent from 1963 through 1965. -15- Approved For ReleaisabOSEGREI CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-R 05161A000700010009-3 TOP SECRET PEIPING HEAT AND THERMAL POWER PLANT TETS LOA I U.LA/ 0) J264 FIGURE 9 1 1 Approved For Release 2003/ 161A000700010009-3 2540 25:4111 ved For Releasrdp0?Ettt IA-RUP (8I 05161A000700010009-3 CIA IMAGERY ANALYSIS DIVISION PEIPING HEAT AND THERMAL POWER PLANT TETS_ CIA/PIR 6515J PHOTO DATA CONSTRUCTION ACTIVITY LEVEL OF PRODUCTION Eastern end of powerhouse is incomplete. It appears that one boiler-generator unit has been finished with others probably to follow. No apparent change. No apparent change. No apparent change. No apparent change. -16- Approved For Re!eat:ROAR:ET: Heavy smoke from stacks A and B. Heavy smokec,from stacks A and. B. Heavy smoke from stacks -A. and B. Heavy smoke from stacks A. and B. Heavy smoke from stacks A. and B. CIA-RDP78T05161A000700010009-3 Approved 1o1 Release 2003/fti5 gegy771A000700010009-3 CIA IMAGERY ANALYSIS DIVISION PEIPING HEAT AND THERMAL POWER PLANT TETS CIA/PIR 65150 PHOTO DATA CONSTRUCTION ACTIVITY 'LEVEL OF PRODUCTION No apparent change. No apparent change. No apparent change. No apparent change. Uprights are visible for second new boiler-generator unit at east end of the plant. These supports were visible on ground photo- graphy of Heavy smoke from stacks A and B. Heavy smoke from stacks A and B. Heavy smoke from stacks A and B. Heavy smoke from stack B. Moderate smoke from stacks A and C. 25X1 251 All three stacks smoking heavily. 25X1 Approved For Release 2003/405MR-B P78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 ved For Releas1eif03SMI9A-RDP7 CIA IMAGERY ANALYSIS DIVISION 8T05161A000700010009-3 CIA/PIR 65150 PEIPING THERMAL POWER PLANT (CHANG-HSIEN-TIEN) Peiping Thermal Power Plant (Chang-hsien-tien) is located in a small industrial complex west of the Peiping Highway Bridge over the Yungting Ho at coordinates 39 48 50N - 116 08 60E. The facility is coal-operated, rail-served and consists of a sub-station with one probable transformer, control house, three spray ponds, coal conveyor and processing equipment, and miscellaneous support/storage buildings. The boilerhouse is equipped with three dust-catcher units and appears to be connected to masonry stack A by three single flues, indicating that three boiler units are installed. Power cables could not be discerned between the generator hall and sub-station on available photography. There has been no new construction during the period from 1963 through 1965. -18- Approved For ReleasTOPOSECRET A-RDP78T05161A000700010009-3 2bX1 Approved For Release 2003/05/05 : CIA-77415161A000700010009-3 TOP SECRE cIA PIR 65txl FIGURE 10 25X1 PEIPING THERMAL POWER PLANT (CHANG-HIEN-TI) TOP SECRET_I Approved For Release 2003/051/05 : CIA-RDPTSTU51611A000700010009-3 225511 Ap proved For Releattnt art-CTAIZI7778T05161A00070001000973 CIA IMAGERY ANALYSIS DIVISION CIA/PIR 65150 PEIPING THERMAL POWER PLANT (CHANG-HSIEN-TIER) PHOTO DATA CONSTRUCTION ACTIVITY LEVEL OF PRODUCTION None None apparent. None None None None -19- No smoke observed. Spray ponds A and C appear empty. Poor quality film precludes analysis. Porbable light smoke from stack A. Sixteen sprinkler units in operation in spray ponds A and B. Light smoke from stack A. Twelve sprinklers in operation in spray ponds A and B. Light smoke from stack A. ? Eleven or twelve spray units in operation in spray ponds A and B. Light smoke from stack A. Eleven sprinkler units in operation in spray ponds A and B. Approved For ReleasVg0?/KAPC IA-RDP78T05161A000700010009-3 Approved ror Release 2003/05: ileali.'78T06-1-64A000700010009-3 CIA IMAGERY ANALYSIS DIVISION PEIPING THERMAL POWER PLANT (CHANG-HSIEN-TI) PIR 65150 2511 25X1 PHOTO DATA CONSTRUCTION ACTIVITY LEVEL OF PRODUCTION None None -20- Approved For Release 2003ia5SEER-ER Moderate smoke from stack A. Thirteen sprinkler units in operation in spray ponds A and Heavy smoke from stack A. Twenty-one sprinkler units in operation in spray ponds A and 78T05161A000700010009-3 B. 1 B. 1 1 25X1 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approv ed For Release irt9p/OSLORM-RDP781-05161A000700010009-3 CIA IMAGERY ANALYSIS DIVISION PEIPING THERMAL POWER PLANT (KAO-CHING) NPIC NUMBER - 50-G1 U1A/Y.Lh 0)1)U The Peiping Thermal Power Plant (Kao-ching), also known as Shih-ching-shan Thermal Power Plant (Kho-ching), is located 5.5 nm northwest of the Ch'ang- hsin-tien Railroad Bridge over the Yung-ting Ho at coordinates 39 56 15N - 116 17 30E. The facility is rail-served, coal-operated, walled and includes a sub-station with control house, six oil storage tanks, coal conveyor system, coal car unloading building, and numerous support/storage buildings. The boilerhouse is equipped with three dust catcher units indicating that three boiler units are installed. A section for a fourth dust catcher exists and is already linked to the stack by a set of flues. Because of consistently poor quality photography, no power cables could be detected. No new construction has occurred during the specified period from 1963 through 1965. -21- Approved For Release "EQB/6fEIERECTI A-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDTT05161A00070001000E TOP SECREll PEIPING THERMAL POWER PLANT (KAO-CHING) -3 CIA/PIR 65150 FIGURE 11 25X Approved For Release 200 TOP SECRE 3/05/05 : Cl T05161A000700010009-3 25X Approved For Release 201..3/Q_5/05 : CIA- OP SECRET 161A000700010009-3 RDP78T05 CIA IMAGERY ANALYSIS DIVISION PEIPING THERMAL POWER PLANT (KAO-CHING) CIA/PIR 65150 PHOTO DATA CONSTRUCTION ACTIVITY LEVEL OF PRODUCTION None. None None None None None -22- Approved For Release 3/l Heavy smoke from stack A. Light smoke from stack A. Very light smoke from stack A. Heavy smoke from stack A. Moderate smoke from stack A. Heavy smoke from stack A. A-RDP78T05161A000700010009-3 25 25 Approved For Release 2003/05/05 : C05161A000700010009-3 TOP SECRET rUNR7 CIA IMAGERY ANALYSIS DIVISION PEIPING THERMAL POWER PLANT (KAO-CHING) CIA/k1. t*I)ki PHOTO DATA CONSTRUCTION ACTIVITY LEVEL OF PRODUCTION None None None -23- Approved For Release ffiakoaro?RETA 15 15 Heavy smoke from stack A. Moderate vapor observed from center of boiler- house in vicinity of dust-catchers. I Moderate smoke from stack A. Heavy smoke from stack A, X1 -RDP78T05161A000700010009-3 1 2i1 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approv A-RDP78? 511 511 ed For ReleasetptEttf I CIA IMAGERY ANALYSIS DIVISION 05161A000700010009-3 PEIPING THERMAL POWER PLANT (SHIH-CHING-SHAN) AY1L AUMBEE - )U-b UlAfFiE 0)1)U The Peiping Thermal Power Plant (Shih-ching-shan) is located 2.9 nm southeast of the Northwest Shih-ching-shan Dam at coordinates 39 55 30N - 116 08 05E. The facility is rail-served, coal-operated and consists of four large cooling basins, large sub-station with control house, bridge crane and several large unidentified shop type buildings. Because of the consistently poor quality photography and the extremely heterogeneous construction of the facility, it was impossible to make a detailed assessment. The plant appears to consist of an old section containing three medium sized stacks (B, C and D), and a newer conventional powerhouse with one large free-standing masonry stack (A). Poor quality photography and the constant smoke and haze over the plant precluded a detailed assess- ment of the number of boiler and generator units. The new section appears large enough for three medium sized (25 mw range) boiler-generator units; the old section could probably accommodate three to five smaller units. No power leads, transformers or other indicators of capacity could be discerned. No new construction is apparent from 1963 through 1965. Approved For For ReleasellEISEZREEI A-RDP78T05161A000700010009-3 2 2 2 ? Approved For Release 2003/05/05 : CI4-PDP7,3T05161A000700010009-3 TOP SECRET PIPING THERMAL POWER PLANT (SHIH-CHING-SHAN) 25X1 CIA/PIR 6515A1 FIGURE 12 25X1 Approved For Release 200 05161A000700010009-3 2.1 2.1 A-RDP78TO 511 ed For Releasertp3/SEtREF CIA IMAGERY ANALYSIS DIVISION 5161A000700010009-3 PEIPING THERMAL POWER PLANT (SHIH-CHINO-SHAN) CIA PIR 15l5O PHOTO DATA CONSTRUCTION ACTIVITY LEVEL OF PRODUCTION None None None None Moderate smoke from stack B. Heavy smoke and poor quality photography precluded analysis. Heavy smoke from stack A and B. Moderate smoke from stack D. Light smoke from stack B. None Moderate smoke from stack B. Light smoke from stack D. -25- -f: Approved For ReleaseTfilbaidiE IA-RDP78T05161A000700010009-3 2 2 2 Approved F orRelease209/N0SEEktrP78T05161A000700010009-3 CIA IMAGERY ANALYSIS 2E111 2E111 DIVISION CIA PIR 65150 PEIPING THERMAL POWER PLANT (SHIH-CHING-SHAN) PHOTO DATA CONSTRUCTION ACTIVITY LEVEL OF PRODUCTION None None None None None None Moderate smoke from stacks A, B, and D. Moderate smoke from stacks A and B. Moderate smoke from stacks A and B. Heavy smoke from stack B. Light smoke from stack D. Light smoke from stacks A, B, and D. Moderate smoke from stacks A. and B. Probable light smoke from stack D. -26- Approved For Release 20013013/131E:CRE DP78T05161A000700010009-3 25X1 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 ved For Releasetp/MEfl A-RDP71T05161A000700010009-3 CIA IMAGERY ANALYSIS DIVISION PING-SHAN HYDRO POWER PLANT CIA/PIR 65150 The Ping-shan Hydro Power Plant is located on a new reservoir which empties into the Hu-tto Ho, 0.9 nm west-northwest of Ping-shan at coordinates 38 18 lON - 114 01 50E. The completed generator hall appears to be linked by a single buried conduit to the water intake facility. A probable water control building sits astride the conduit near the base of the dam. Although a sub-station or control house is not evident, the presence of turbulence in the tailrace on several photographic missions indicates that the plant is operable. There has been no apparent construction during the 1963 through 1965 period. -27- Approved For ReleasTOPONNETC IA-RDP78T05161A000700010009-3 2 2 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 TOP SECRET LJ PING-SHAN HYDRO POWER PLANT UJJ/JJt0)111 FIGURE 13 25X1 211 TOP SECRET Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 511 25X1 250 11- For Release 2105/gitkran-71A000700010009-3 CIA IMAGERY ANALYSIS DIVISION PING-SHAN HYDRO POWER PLANT U1A/YIE b5151 PHOTO DATA CONSTRUCTION ACTIVITY LEVEL OF PRODUCTION None None None None None None -28- Approved For ReleasIKAFRE:TC No turbulence noted. Moderate turbulence from the center outlet of plant with light turbulence at the sides. Slight turbulence observed at northern outlets. Slight turbulence observed at the northern outlets. No turbulence observed. No turbulence observed. 1A-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 ved For Releaerdp0Witt1C IA-RDP CIA IMAGERY ANALYSIS DIVISION 78T05161A000700010009-3 SHIH-CHIA-CHUANG (SHIH-MEN) THERMAL POWER PLANT CIA/PIR 65150 The Shih-chia-chuang (Shih-men) Thermal Power Plant is located 0.2 nm southeast of the Shih-chia-chuang Railroad Yards East at coordinates 38 03 40N - 114 31 20E. The facility is coal-operated, rail-served, and consists of five spray ponds, control house, sub-station, and coal-handling and processing facilities. The boilerhouse is compartmented into three sections and appears to have eight boiler units as indicated by the number and placement of dust- catcher units and flues. The western boiler section contains four dust- catchers and a system of four single flues which connect with stack A. The center section contains three dust-catcher units and is linked to stack B by two pairs of two-duct flues and one three-duct flue. The section served by stack C is still expanding and presently contains one dust-catcher unit and space for a second. Two pairs of two-duct flues connect the section with stack C. It is likely that three or four more units are planned for the eastern section of the plant. The absence of good quality, large scale photography precluded any assessment of the number of generator hall sections or power cable leads. Considerable expansion occurred at the eastern end of the plant from 1963 through 1965. --29- Approved For ReleTOP2CSECORM : CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 TOP SECRET SHIH-CHIA-CHUAffG (SHI-MEN) THERMAL POWER PLANT CIA FIORE 14 25 251 Approved For Release 2003/05 TOP SECRET 1A000700010009-3 25/ 25X Approved For Release 2 8T05161A000700010 SHIH-CHIA-CHUG (SHI-NEN) THERMAL POWER PLANT )09-3 CIA/PIR 65150 FIGURE 15 Approved For Release 2003/09JIiJ SECKTIT05161A000700010009-3 Approved F or Release2001,30/S5E:atiRDP78T05161A000700010009-3 CIA IMAGERY ANALYSIS DIVISION SHIH-CHIA-CHUANG (SHIH-NEN) THERNAL POWER PLANT PHOTO DATA CONSTRUCTION ACTIVITY LEVEL OF PRODUCTION Approved For Release 2ITCOM5arfCR:EIF 211 211 Heavy smoke from stack A. Light smoke from stack B. Six sprinkler units in operation in pond A. Fourteen sprinkler units in operation in pond B Moderate smoke from stacks A and B. Clouds precludes further analysis. Moderate smoke from stack B. Light smoke from stack A. Eight sprinkler units in operation in pond A. Twelve sprinkler units in operation in pond B. Light smoke from stack A. Sixteen sprinklers in operation in pond B. Undeterminable number of sprinkler units in operation in pond A. Heavy smoke from stack A. Moderate smoke from stack B. Sixteen sprinklers in operation in pond B. None in pond A. -RDP78T05161A000700010009-3 1 2511 211 1 pp For Release f/%6ENE51 CIA IMAGERY ANALYSIS DIVISION T05161A000700010009-3 CIA/PIR 65150 SHIH-CHIA-CHDANG (SHIH-MEN) THERMAL POWER PLANT PHOTO DATA CONSTRUCTION ACTIVITY LEVEL OF PRODUCTION Expansion is underway on the eastern end of the powerhouse. Stack C is complete and connected to new boiler-generator section. Uprights for at least one section are visible. Two or possibly three boiler sections have been completed; however, one section is not yet equipped with a dust- catcher. All new sections appear to be connected by flues to stacks (one section to stack B; two sections to stack C). -31- Approved For Release IfiBioSEC5R El Moderate smoke from stacks A and B. Six sprinkler units in operation in pond A. Eighteen sprinkler units in operation in pond B. Moderate smoke from stack A. Light smoke from stack B. -RDP78T05161A000700010009-3 2 2 2 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 11 5X1 ed For ReleastaipMWTTA-RDP7 CIA IMAGERY ANALYSIS DIVISION T05161A000700010009-3 TANG-SHAN THERMAL POWER PLANT AY1U BUE/DOLII - UIR/Yllt 0)1) The Tang-shan Thermal Power Plant is located 0.25 nm east of the southern end of Tang-shan Airfield Northwest at coordinates 39 38 40N - 118 11 50E. The facility includes one natural-draft cooling tower, control house, sub-station, extensive coal handling and storage facilities, and miscellaneous support/storage buildings. The plant possibly consists of two separated powerhouses, although the lack of good, large scale photography made such an analysis uncertain. The main powerhouse is equipped with five probable dust-catchers and five sets of two-duct flues. Two pairs of flues appear to be serviced by masonry stack A, possibly indicating a large (50 mu range) boiler-generator unit. The flue system for the remaining three pairs of flues is unclear, however, they are probably connected to stack B. A smaller possible power- house is located southeast of the main plant. It consists of what appears to be an almost square boiler section with two generator hall wings. Two small roof stacks or vents are apparent. No power cables were discernable on any of the photography of the complex. No new construction was apparent during the period from December 1963 through 1965. -32- Approved For ReleasMISKRE:T IA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : ClA-RDP78TO161A000700010009 TOP SECRET NG-SHAN THERMAL POWER PLANT CIA PIR515i FIGURE 16 Approved For Release 2003/0 161A000700010009-3 25X1 41 Ii ed For Releaserbli3ffeittf A-RDP7 CIA IMAGERY ANALYSIS DIVISION 3T05161A000700010009-3 TANG-SHAN THERMAL POWER PLANT CIA/PIR 65150 PHOTO DATA CONSTRUCTION ACTIVITY LEVEL OF PRODUCTION' None None None None None None -33- Heavy smoke from stacks A and B. Light vapor from cooling tower A. Light smoke from stack B. Moderate vapor from cooling tower A. Heavy smoke from stacks A and B. Light vapor from cooling tower A. Heavy smoke from stacks A and B. Light vapor from cooling tower A. Heavy smoke from stacks A and B. Light vapor from cooling tower A. Heavy smoke from stacks A and B. Moderate vapor from cooling tower A. Approved For ReleaseT2083/SHREIIA-RDP78T05161A000700010009-3 or Release 200116/95sRAERID P78T051 CIA IMAGERY ANALYSIS DIVISION 1 61A000700010009-3 25 TANG-SHAN THERMAL POWER PLANT CIA/PIR b511 PHOTO DATA CONSTRUCTION ACTIVITY LEVEL OF PRODUCTION None None None Heavy smoke from stacks A and B. Heavy vapor from cooling tower A. 251 Heavy smoke from stack A. Moderate smoke from stack B. Light vapor from cooling tower A. Heavy smoke from stacks A and B. Light vapor from cooling tower A. -34- Approved For Release 20Terig? CRIEk DP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 '51 Apprio ved For Release relp/ORTREFA-RDP78T05161A000700010009-3 2 2 CIA IMAGERY ANALYSIS DIVISION CIA/PIR 65150 TIENTSIN THERMAL POWER PLANT NO. 1 5X1 NPIC NUMBER - 67-J The Tientsin Thermal Power Plant No. 1 is located on the north bank of the Pal Ho (River) 1.3 nm southeast of Tientsin Railroad Station and Yards at coordinates 39 06 43N - 117 13 09E. The facility is rail- served, coal-operated, and includes two bridge cranes, coal handling and processing equipment, control house, two sub-stations with four trans- formers visible and numerous support buildings. The boilerhouse has eight dust-catcher units and eight stacks, indicating eight boiler units. The southern section of the generator hall is linked to the nearby sub-station by three or possibly four sets of three-cable power leads. The northern section is not visibly tied in to the adjacent control house. 1965. No significant change has occurred at this plant from 1962 through -35- Approved For ReleaseTRAggq A-RDP78T05161A000700010009-3 2 Approved For Release 2003/0ME:af1-RDP18T05161A000700010009 TIENTSIN THERMAL POWER PLANT NO. 1 - 25X1 211 -3 CIA/PIR 65150 FIGURE 17 25X1 MP SECRET Approved For Release 2003/06/05 : CIA-RDP78T06161A000700010009-3 11 511 511 ved For Releasera)3ffnEr A-RDP78. CIA IMAGERY ANALYSIS DIVISION 105161A0007000100093 2 TIENTSIN THERMAL POWER PLANT NO. 1 C1A/PIR b5151 PHOTO DATA CONSTRUCTION ACTIVITY LEVEL OF PRODUCTION None None None None None -36- Approved For ReleasIGB0SEEMITc Heavy smoke from stacks A, B, D, and E. Moderate smoke from stack H. Heavy smoke from stack A, B, and C. Moderate smoke from stack H. Moderate smoke from stacks A, B, C, and D. Moderate smoke from stacks A7 C7 D/ El and G. Moderate smoke from all eight stacks (A?H) IA-RDP78T05161A000700010009-3 2 P78T0516 Approved F r Release 20030r5sEVREID CIA IMAGERY ANALYSIS DIVISION 1A000700010009-3 TIENTSIN THERNAL POWER PLANT NO. 1 CIA/PIR 65150 PHOTO DATA CONSTRUCTION ACTIVITY LEVEL OF PRODUCTION None None None None Heavy smoke from stacks A and D. Others are partially obscured by smoke and haze; however, stacks B and C are possibly active. 211 211 Heavy smoke from stacks A, B, C2 D2 and E. Light smoke from stacks G and H. Moderate. smoke from stacks A. B C D2 and E. Light smoke from stacks F, G, and H. Heavy smoke from stacks E, F2 and G. Approved For Release 2001 MOSEeKing DP78T05161A000700010009-3 25X1 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 211 ed For Releaseref193WREF IA-RDP787 CIA IMAGERY ANALYSIS DIVISION TING-HSIEN HYDRO POWER PLANT 05161A000700010009-3 uix/rin c371u The Ting-hsien Hydro Power Plant is located 18 nm northwest of Ting-hsien on the T'ang Ho at coordinates 38 45 30N - 114 45 20E. The facility consists of an earth fill dam with buried penstocks, an overflow outlet, probable sub-station under construction, a control house and other unidentified construction. It is difficult to ascertain the number of turbines; however, the size of the generator hall indicates two or three units. Of the missions that covered this plant, was the only mission that showed activity (See Figure 1). There has been no new construction at this plant during the 1963 through 1965 period. -38- Approved For ReleasiT003WERE IA-RDP78T05161A000700010009-3 Approved For Release 2003/W0fEekleMPT8T05161A000700010009 TING-HSIEN HYDRO POWER PLANT 25X1 PIR 6515c2Sf FIGURE 18 25 1 Approved For Release 2001mArN5SERWRID 25E718T05161A000700010009-3 25 111 - Approved For Release 20ra5 SECRET05161A000700010009-3 Approved For Release 200IPP5 : 5AFficgg5161A000700010009-3 Approved For llama CIA_RDpaori 000700010009-3 77. Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved For R4eaO3JO5IO5 : IA 1 09-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 re Approved For pe 3/ 05 : -R % .17i'e/1.47e2 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 ApprovedpR.27T03/0V : 9A-19Peiy(16 0009-3 Otp0 Approved For For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved For CIA, PHOTOLAAP111C. INTELLIGENCE DIVISION 111111111111111111.1 ERRATUM FOR CIA/PIR-67005 0010009-3 August 1965 All pages of the Photographic Intelligence Report, Highway Bridge over the Mekong River, Yun-Ching-Hung, China, the CIA/PIR number should be changed from 67004 to 67005. GROUP I Excluded ham automatic A downgrading and declessificatIon pproved For Release 2003/05/IRECCUIRDP78T05161A000700010009-3 25 25 CENTRAL INTELLIGENCE AGENCY .PHOTOGRAPHIC INTELLIGENCE DIVIS!ON PHOTOGRAPHIC INTELLIGENCE REPORT HIGHWAY BRIDGE OVER THE MEKONG RIVER YUN-CHING-HUNG, CHINA CIA/PIR-67005 JULY 1965 WARNING This document contains information affecting the national defense of the United States, within the meaning of Title 18, sections 793 and 794, of the U.S. Code, as amended. Its transmission or revelation of its contents to or receipt by an unauthorized person is prohibited by law. SECRET Approved For Re ? SECRET X1 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 X1 lease 2003/05/05 : GIA-RDP (8 I Ob 161A000700010009-3 GROUP I Excluded front automatic downgrading and declassification Approved For Release 2003/05/05 :32.?-PDP78T05161A000700010009-3 A/PIR-67004 L. IA, r LALA,KArnit... IN I tLLIUtN(...t HIGHWAY BRIDGE OVER THE MEKONG RIVER YUN-CHING-HUNG, CHINA (22 00N-100 )48E) The Yun-Ching-Hung, China area (22 00N-100 )-i-8E) was studied on latest available aerial photography in order to determine the dimensions of the highway bridge over the Mekong River, to identify significant installations in the general area, and to determine the status of construction activity near the bridge. Since the bridge and its approaches appear to have been completed, the only significant construction activity near this bridge is a possible radar site under construction north of the bridge. (See Annotation 2) The bridge dimensions are All measurements have been made by the NPIC Technical Intelligence Division, and are considered to be accurate to within plus or minus one %. - 1 - Approved For Release 2003/05/05SMOP78T05161A000700010009-3 25 25 25 25 25 Approved For Release 2003/05/CSEeDERDP78T05161A0007 %11921fraxnnin-q--5h3-7004- CIA, PHOTOGRAPHIC INTELLIGENCE DIVISION REFERENCES 25 25 MAPS OR CHARTS AGC-NF 47-12, 1st Edition, 4 December 1962 (UNCLASSIFIED) U.S. Air Target Chart-Series 200, 1st. Edition, May 1960 (SECRET) REWRIEMENT C-RR-82,722 CIA/IAD PROJECT 30867-5 - 2 - Approved For Release 2003/05EDECItEa-RDP78T05161A000700010009-3 25 X1 er Approved For Release 2003/0t/etWfk-RDP78T05161A000700010009-3 CIA/PIR-67004 CIA, PHOTOGRAPHIC IN itu_iumict KEY TO ANNOTATIONS ON FIGURE 1. 1. Bridge 2. Possible radar site under construction. 3. Barracks/Storage Areas (These two areas appear to be non-military and probably have the function of supporting the road construction/maintenance activity and economic development of this barder area of China.) 4. Ferry 5. City of Yun-Ching-Hung 6. Storage Areas (This area is probably used for the storage of agricultural products.) 7. Military Barracks 8. AAA Site (This site consists of nine positions for light AAA or heavy machine guns. Occupancy of the positions cannot be determined from available photography.) Approved For -3 Is -I. 00010009-3 25 X1 YUN-CHING-HUNG, CHINA 22 00N-100 48E POSSIBLE RADAR SITE UNDER CONSTRUCTION X1 25X1 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3 Approved For Release 2003/05/05 : CIA-RDP78T05161A000700010009-3

Source URL: https://www.cia.gov/readingroom/document/cia-rdp78t05161a000700010009-3

Links
[1] https://www.cia.gov/readingroom/document-type/crest
[2] https://www.cia.gov/readingroom/collection/nga-records-formerly-nima
[3] https://www.cia.gov/readingroom/docs/CIA-RDP78T05161A000700010009-3.pdf