MEMORANDUM FOR: Chief,-Resources Division, ORR
THROUGH
25X1A
Chief, Requirements Branch, Reconnaissance Group, CGS
Chief, CIA/PID (NPIC)
Confirmation and Other Data on Trunk Oil Pipe Line
Construction between Penza and Unecha, USSR
1. The above referenced requirement requested confirming data on the
pipe line between Penza (Geog.- coordinates, 53? 13'N - 450. OO'E) and Unecha
(Geog. coordiiates 52? 50!N.- 32?.'4O'E).
.2. A-photo study was conducted to determine the existence and extent
of a pipe line between these two cities, which are approximately'510 statute
miles apart. Because of inadequate photo coverage, there are two breaks
in?the study,?one between Ye'lets and Michurirtsk, the other between Orel
and Bryansk. These two breaks, however; total only 60 miles of the search
.line and'do not represent a serious. obstacle to-the content of this memo.
3. The extent and alignment of the pipe line between Penza and Unecha
is represented by-dotted lines on the overlay to the'map in Figure #1 The
gaps in coverage, and the location of the pumping stations found in the
course of the search are also indicated on the overlay.
Figures 2 and 3 are photos taken in the Unecha Area showing a
pumping-station.under construction, and a pipe line river crossing which
is typical of all such crossings on the route. The location of these
two photos is indicated on the facing map, (Figure !), along with the
alignment of the pipeline in the area.
Figures 5, 7, 9, 11 and 13 show the.other pumping stations observed
during the study. Facing-each photo is an ATC 1:200,,000 map showing the
location of the pictured station and the alignment of the pipe line scar
in the immediate area.
DECLASSIFICATION REVIEW by NIMA/DOD 4/6/00
CCC;2~S'.ii~al0l
us
HANDLE VIA
'TALENT-KEYHOLE
CONTROL SYSTEM ONLY
TQP SECRETS RUFF
' y 1
TCS No . $228/64
Page 2
UBJECT: Confirmation and Other Data on Trunk 'Oil Pipe Line Construction
between Penza and Unecha, USSR
The small scale of photography used in this study did not alloy
he pipes in the line to be seen. It-is therefore impossible to say with
certainty the number of pipes in the line. However, the grading visib7e
in Figure 3 indicates there will be only two pipes crossing the stream:';-
This