Published on CIA FOIA (foia.cia.gov) (https://www.cia.gov/readingroom)


PETROVSKIY SHIPYARD NO 5 LENINGRAD, USSR

Document Type: 
CREST [1]
Collection: 
NGA Records (Formerly NIMA) [2]
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05439A000500370040-6
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
7
Document Creation Date: 
December 28, 2016
Document Release Date: 
September 1, 2000
Sequence Number: 
40
Case Number: 
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T05439A000500370040-6.pdf [3]362.13 KB
Body: 
ILLEGIB Approved For Release 2001/08/21 : CIA-RDP78TO5439A000500370040-6 Approved For Release 2001/08/21 : CIA-RDP78TO5439A000500370040-6 Handle Via TALENT-KEYHOLE Control System Only TOP SECRET CHESS RUFF PETROVSKIY SHIPYARD NO 5, LENINGRAD, USSR 25X1A Petrovskiy Shipyard No 5 (BE designation: is -located in the northwest section of Leningrad, USSR, an the southern shore of Ostrov Petrov- skiy, an island in the mouth of the Neva River, at 59-57-40N 30-15-15E .(Figures 1 and 2). The Petrovskiy Shipyard is a small facility which produces both Osa-class large guided- missile patrol boats (PTFG) and Komar-class small guided-missile patrol boats (PTG). Two construction halls are present at the shipyard (items 13 and 23, Figure 3 and Table 1). The -Railroad, double track -Railroad, single track Road 1 0 doors of both halls open on a long transverser (item 17), which has a length of 1,070 feet and a minimum lateral clearance of 155 feet. The Osa-class boats appear to be built in the narrow construction hall (item 13), placed on the trans- verser, and launched in the small basin (item 7). The Komar-class boats are probably built in the 6-door construction hall (item 23), run onto the transverser, and either lifted into the water by the ship lift in front of the hall (item 22, Figure 3; Figure 4) or launched into the small basin. The length of the con- FIGURE I. LOCATION MAP. - 1 - TOP SECRET CHESS RUFF Handle Via TALENT-KEYHOLE Control System Only Handle Via TALENT-KEYHOLE Control System Only TOP SECRET CHESS RUFF. FIGURE 2. PETROVSKIY SHIPYARD NO 5,_ - - nll I L e~ lift is probably cap- skiy the quay. Shipyard. The ship of lifting the Komar-class boats onto able 25X1 D Figure 5 shows.the probable light machine shops completed in These shops (items 28 and 29, Figure 3) are located in the southeastern part of the ship- yard along the fitting-out_ quay (item 18). struction hall was completely rebuilt during that period, suggesting that the entire building may TOP SECRET CHESS RUFF struction halls suggests that an assembly-line Significant-changes ~t the Petrov- method of construction may be used. . skiy Shipyard include the construction of the In addition to construction, the repair launching basin and the 2 probable light machine and modernization of Osa-and Komar-class shops shown in Figure 5, and modification of boats is probably a function of the Petrov- the 6-door construction hall (item 23, Figure 3; Figure 4). A comparison of aerial photography shows that the roof of the con- Handle Via TALENT-KEYHOLE Control System Only Handle Via TOP SECRET CHESS RUFF TCS-81298/65 TALENT-KEYHOLE Control System Only Description Dimensions (ft) 1 Probable storage bldg 2 Open storage area 3 Possible lumber storage/ processing bldg 4 Possible lumber storage/ processing bldg 5 Probable storage bldg 6 Probable storage bldg 7 Launching basin 8 Probable storage bldg 9 Probable storage bldg 10 Probable workshop 11 Steamplant 12 Open storage area 13 Narrow construction hall 14 Admin bldg. T-shaped 15 - Side launching way '16 Open fitting-out area 17 Transverser uay 18 Fitting-out( 19 Probable light machine shop 20 Probable light machine shop 21 Probable workshop 65 x 30 115x 75 90 x 75 75 x 35 145 x 45 315 x 175 (overall) 70x 45 100 x 50 135 x 65 105 x 95 550 x 130 bar. 195 x 45 stem: 165 x 55 145x100 1,070 (length only) 1,500(length only) 200 x 60 285 x 70 (overall) 100 x 30 Item 22 Description Ship lift 110 x 90 x 60h 23 6-door construction hall A 275 x 260 B 325 x 100 24 Probable pattern shop Irregular 25 Open storage area - 26 Possible winch house 50 x 30 28 Probable light machine shop 100 x 50 29 Probable light machine shop 190 x 50 30 Probable workshop 140 x 35 31 Probable fabrication/heavy machine shop, 240 x 135 L-shaped 175 x 110 32 Probable workshop 75 x 45 33 Probable fabrication/heavy machine shop 315 x 150 34 Probable forge/foundry, 120 x 90 L-shaped 95 x 50 35 Probable forge/foundry 145 x 55 36 Probable storage bldg 145 x 65 37 Probable storage bldg 85 x 70 38 Probable storage bldg 105 x 45 TOP SECRET CHESS RUFF Handle Via TALENT-KEYHOLE -Control System Only Approved For Release 2001/08/21 : CIA-RDP78TO5439A000500370040-6 Approved For Release 2001/08/21 : CIA-RDP78TO5439A000500370040-6 Handle Via TALENT-KEYHOLE Control System Only PHOTOGRAPHY Mission Date Pass Camera Frames Classification TOP SECRET CHESS RUFF CHART ACIC. US Air Target Chart, Series 200, Sheet 0153-IHL, ?d ed, May 63, scale 1:200,000 (SECRET) CIA. C-RR4-S2,050 TOP SECRET CHESS RUFF Handle Via TALENT-KEYHOLE Control System Only icial Us CIA 5395;6, 539559 OfF25X1 D e Only

Source URL: https://www.cia.gov/readingroom/document/cia-rdp78t05439a000500370040-6

Links
[1] https://www.cia.gov/readingroom/document-type/crest
[2] https://www.cia.gov/readingroom/collection/nga-records-formerly-nima
[3] https://www.cia.gov/readingroom/docs/CIA-RDP78T05439A000500370040-6.pdf