Published on CIA FOIA (foia.cia.gov) (https://www.cia.gov/readingroom)


MAJOR ELECTRIC POWER PLANTS KIANGSU PROVINCE, CHINA

Document Type: 
CREST [1]
Collection: 
NGA Records (Formerly NIMA) [2]
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP79T00909A000600010009-8
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
15
Document Creation Date: 
December 28, 2016
Document Release Date: 
June 1, 2001
Sequence Number: 
9
Case Number: 
Publication Date: 
May 1, 1970
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP79T00909A000600010009-8.pdf [3]1.22 MB
Body: 
Approved For Release 2001/08/07 : CIA-RDP79T00909A00063p?gret Industrial Facilities (Non-Military) DIRECTORATE OF INTELLIGENCE Basic Imagery Interpretation Report Major Electric Power Plants Kiangsu Province, China Top Secret Handle via Talent - Keyhole Channels Only RCS 13/0024/70 Declass Review by NIMA / DoD TCS 16762/70 DATE MAY 1970 Approved For Release 2001/08/07 : CIA-RDP79T00909A00060,061 009-8 11 PAGES 12 Approved For Release 2001/08/07 : CIA-RDP79T00909A000600010009-8 WARNING This document contains information affecting the national security of the United States within the meaning of the espionage laws U. S. Code Title 18, Suctions 793, 794. The law prohibits its transmission or the reve- lation of its contents in any manner to an unauthorized person, as well as its use in any manner prejudicial to the safety or interest of the United States or for the benefit of any foreign government to the detriment of the United States. It is to be seen only by personnel especially indoctrinated and authorized to receive information in the designated control channels. Its security must be maintained in accordance with regulations pertaining to TALENT-KEYHOLE Control System. GROUP I ZXC YDID FROM AUTOMAnc Printed by the NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER Approved For Release 2001/08/07 : CIA-RDP79T00909A000600010009-8 Handle Via T-rim ~p RFZTA-RUiF T00909A000i66OTOd6g&/70 Tale nt nt-KEYHOI.[~`pproved For Release RCS - 13/0024/70 Control System Only CENTRAL INTELLIGENCE AGENCY Directorate of Intelligence Imagery Analysis Service 25X1 D 25X1 D This report updates the previous basic reports on the eight major electric power plants in Klancsu Province, eastern China. The latest infor- mation used is dated _______________for seven plants and for the eighth. Construction has been observed at two of the plants since the previous reports. At the Shang-hai Wu-ching plant, the boilerhouse and generator hall addition has been externally completed and a fuel storage tank has been constructed in the coal storage area. At the Shang-hai Yang-shu-pu plant, there has been additional construction on the probable boilerhouse section previously reported under construction. No construction has been observed at the other two Shang-hai plants, the two Nan-ching plants, the Min-hang plant, or the Wu-hsi plant. , On the latest coverage, six of the eight plants were operating. The Shang-hai Wu-ching plant was not operating and the Shang-hai Nan-shih plant did not appear to be operating. - I - Handle Via Approved For ReleasTUD15RR ETI 9T00909A0006000100Tp?D8-KEYHOLE Control System Only Approved For Release 2001/08/07 : CIA-RDP79T00909A000600010009-8 " ~dli~~4rvruN~a,'m ip'4~'ry di ~'+';r 'i w* "~auaiPa ipi ipiaYp~!i~~^ki'~ aPa~~iitta~s~~~a~m'ivar~"ma'~pd ~a~?~i~a'i.?,i; iaa rai ~m a~,w~ia iii tlt ia!r pair 3?F Approved For Release 2001/08/07 : CIA-RDP79T00909A000600010009-8 Handle Via Approved For ReleasLQRO'F, fOE EIA-REP79T00909A000600010009 862/70 Talent-KEYHOLE Control System Only This report discusses the current status of the eight major thermal power plants in Kiangsu Province and describes any changes since the previous reports. The following list of the plants studied is keyed to Figure I. 1. Min-hang Thermal Power Plant 2. Nan-ching Heat and Thermal Power Plant Ta-chang-chen 3. Nan-ching Thermal Power Plant Hsia-kuan 4. Shang-hai Heat and Thermal Power Plant Wu-ching 5. Shang-hai Thermal Power Plant Cha-pei 6. Shang-hai Thermal Power Plant Nan-shih 7. Shang-hai Thermal Power Plant Yang-shu-pu 8. Wu-hsi Thermal Power Plant Wang-ting Requirement COMI REX NOl Support Number 420227 Handle Via t KEYHOLE Approved For Releasr/-L: R AFF9T00909A0006000A , stem Only Handle Via ~~~~E~ ~~ TCS - 16762/70 Tale nt-KEYHOLE Approved For ReleaseT~g1 Ig79T00909A000600010009-8 Control System Only Min-hang Thermal Power Plant 25X1A UTM COORDINATES GEOGRAPHIC COORDINATES 5IRUE454298 30-59-35N 121-22-37E 25X1C MAP REFERENCE _ USATC, Series 200, Sheet M 492-7HL 3rd ed, May 68, Scale 1:200,000 25X1C (SECRET/No Foreign Dissem LATEST IMAGERY USED 14r-um I lull Lim I r- kit lv4ullluu~ 25X1 D NA No chap es have been observed at the Min-hang Thermal Power Plant since 25X1D he date of the latest photography used in the previous report. 25X1D The plant was in operation in A moderate amount of smoke was emanating from the eastern sta . Imagery 25X1A CIA. Min-hang Thermal Power Plant, February 1969, TCS 5 WROP SECRET RUFF) -4- Handle Via Approved For Release /0 f~PrAf1 79T00909A0006000Von stem Only Handle Via { p ~ CS I~162/70 Talent-KEYHOApproved For Release 2101'/0kg7~-!'`EIf4-RU'Ff9T00909A000600J70009-8" Control System Only 25X1 C 25X1 C No changes have been observed at Nan-ching Heat and Thermal Power Plant 25X1D Ta-chang-chen since ate of the latest imagery used in the 25X1D previous report. In he fourth boiler, previously reported under construction, had no een comp eted and it a eared that construction may have 25X1D been suspended. Haze over the plant in precludes a detailed anal- ysis of the plant facilities. 25X1D The plant was in operation in observed emanatinq from the stack. INSTALLATION OR ACTIVITY NAME COUNTRY Nan-ching Heat and Thermal Power Plant Ta-chang-chen I CH MAP REFERENCE USATC, `Series 200, Sheet M0386-22HL 3rd ed. SeD (SECRET/No Foreign Dissem LATEST IMAGERY USED require Imagery 25X1A CIA. Nan-ching Heat and Thermal Power Plant (Ta-chang-chen), September , TCS 10283/68 (TOP SECRET RUFF) -5- Handle Via Approved For Release f /Wk~CIAR~79T00909A0006000100 -KEYHOLE CC 't Control System Only Handle Via ~~~~E~ ~~ TCS - 16762/70 Talent?KE'HOL.EApproved For ReleaseTQg1 Ik79T00909A000600010009-8 Control System Only 25X1A 25X1 C 25X1 C Nan-ching Thermal Power Plant Hsia-kuan UTM COORDINATES 50SPL636520 MAP REFERENCE USATC, Series 200, Sheet (SECRET/No Foreign Dissem -??Hl. 3rd ed. Sep 67, Scale 1:200,000 25X1 D I 25X1 D 25X1 D 25X1 D No changes have been observed at the Nan-ching Thermal Power Plant Hsia-kuan since he date of the latest photography used in the previous report. heavy smoke was emanating on 25X1A Imagery CIA. Nan-ching Thermal Power Plant (Hsia-kuan), October 1968, TCS 10724/68 (TOP SECRET RUFF) -6- Handle Via Approved For Release iU~1/o9R7R& A l 9T00909A00060001~Pbp tstKEYHOLE em Only Handle Via T~~ r~O~E'~ ~I~F~F TCS - 16762/70 Talent-KEYHOLE Approved For Release 1 I P79T00909A000600010009-8 Control System Only Key to Annotations Item Description I Fuel storage tanks 2 Boilerhouse 3 Generator hall Handle Via Approved For Release 200YOP~RE1,A- 9T00909A0006000100d9LI8t-KEYHOLE -To t' I Control System Only Handle Via Tn G~ TCS I 762/70 Talent-KEyHOL~pproved For Release 200 icJ67RIJAK#~79TOO909A000600010009-8 Control System Only 25X1 C 25X1 C Shang-hai Heat and Thermal Power Plant Wu-ching CH UTM COORDINATES GEOGRAPHIC COORDINATES 51RUE539378 31-04-04N 121-27-50E USATC, Series 200, Sheet (SECRET/No Foreign Dissem The previously reported addition to the boi lerhouse and generator hall at Shang-hai Heat and Thermal Power Plant Wu-ching has been externally completed 25X1D since the date of the latest photography used in the previous repor e a i ion is higher than the rest of the boi lerhouse, probably indicating that a boiler has been installed which is larger than the other boilers at the plant. Two fuel storage tanks have been installed at the south end of the coal storage area. One of these tanks was completed by and the other has been constructed since that time. It is not k se tanks are for standby fuel or whether the newly installed boiler will utilize oil as a primary fuel. No changes have been observed in the switching yard. The plant was not operating in as no smoke or steam was observed. Imagery COUNTRY :GATION DATE (it require NA CIA. Shang-hai Heat and Thermal Power Plant (Wu-ching), pri S 18729/69 (TOP SECRET RUFF) -8- Handle Via Approved For Release ff /g /~7 ARTIf79T00909A00060001OOO9A8KEYHOLE Control System Only Handle Via TCS - 16762/70 Talent-KEYHOI-Ppproved For Release 2U9'I/AWR . ~ APR 79T00909A000600010009-8 Control System Only 51RUE594689 MAP REFERENCE USATC, Series 200, Sheet M0492-2HL, 3rd ed, Dec 68, Scale 1:200,000 25X1C (SECRET/No Foreign Di ssem No chap es have been observed at Shang-hai Thermal Power Plant Cha-pei 25X1D since the date of the latest photography used in the previous repor . 25X1D In the northern boilerhouse was operating as indicated by 25X1D smoke emanating from the two stacks, but the southern boilerhouse did not appear to be operating. The plant did not appear to be operating in 25X1D 1as no smoke or steam was observed; however, the small scale of e p o o- grap y may have precluded its observation. Imagery 25X1A CIA. Shang-hai Thermal Power Plant (Cha_pei), December 1968, OP SECRET RUFF) -9- Handle Via Approved For Release -?f1/St9.7D:1f }79T00909A0006000100 i8-KEYHOLE Control System Only Handle Via Si~?E1 TCS - 16762/70 Talent KErHOI EApproved For ReleaseTf]p1 1 -4979T00909A000600010009-8 Control System Only Shang-hai Thermal Power Plant Nan-shih UTM COORDINATES 5IRUE565535 ? MAP REFERENCE 25X1 C ,. . --- ,. , ZDA "' (SECRET/No Foreign Dissem 25X1D No chap es have been observed at the Shang-hai Thermal Power Plant Nan-shih since the date of the latest photography used in the previous report. precluded their observation. GEOGRAPHIC COORDINATES 31-12-06N 121-29-40E the plant was operating as indicated by water turbulence at 07ing water discharge; no smoke or steam was observed. In the plant did not appear to be operating as no smoke or water ur u ence was observed; however, the small scale of the photography may have Imagery 25X1A CIA. Shang-hai Thermal Power Plant (Nan-shih), January 1969, ICS I OP SECRET RUFF) NEGATION DATE (if required) -10- Handle Via Approved For Release,?~Qg1/A$/'atyl fUFr79T00909A0006000100d9o.BKEYHOLE I yr JC rt R Control System Only Handle Via 2r(J~6?IO+8 RETAj~~P79TOO9O9AOOO6OOOibOO9~g762/70 Talent-KErH~t~pproved For Release Control System Only Shanq-hai Thermal Power Plant Yang-shu-pu UTM COORDINATES 5IRUE6226I3 GEOGRAPHIC COORDINATES I-It,-21N 121-33-13E MAP REFERENCE t1SATC, Series 200, Sheet M0 492-2HL, 3rd ed, Dec 68, Scale 1:200,000 (SECRET/No Foreign Dissem since the date of the latest imagery used in the previous report, there has been a i tonal construction on the probable boilerhouse section previously reported under construction at Shang-hai Thermal Power Plant Yang-shu- pu. The small scale of the December photography precludes further analysis of this section. The plant was operating in Light smoke was emanating from he masonry stack, one of the wes ern roc s ac s, and from a roof stack in the center section. Imagery 25X1A IA. Shang-hai Thermal Power Plant (Yang-shu-pu), January 1 , S 11551/68 (TOP SECRET RUFF) -1 1- Handle Via Approved For Release 2QQ~/0 (D A-~J9TOO9O9AOOO6OOO1OO0038t-KEYHOLE t~11' t t 1 t Control System Only Handle Via T ~t~~~E~~UFF TCS - 16762/70 Talent-KEYHOLE Approved For Release 1 I RDP79T00909A000600010009-8 Control System Only 25X1A 25X1C Wu-hsi Thermal Power Plant Wang-ting UTM COORDINATES GEOGRAPHIC COORDINATES 51RTE558827 31-26-39N 120-26-17E MAP REFERENCE ACIC. USATC, Series 200, Sheet 2- HL 4th ed, Ma 67, Scale 1:200,000 (SECRET/No Foreign Dissem No changes have been observed at the Wu-hsi Thermal Power Plant Wang-ting since the date of the latest photography used in the previous repor . The plant was operating in when smoke was emanating from eight of the II stacks. r 25X1A Imagery CIA. ME Wu-hsi Thermal Power Plant (Wang-ting), March 1969, TCS 18563 69 OP SECRET RUFF) -12- Handle Via Talent-KEYHOLE Approved For Release' @I/QA :EIA 9T00909A00060001Q,QQQi?stem only Approved For Release 2001/08/07 : CIA-RDP79T00909A000600010009-8 Top Secret Top Secret Approved For Release 2001/08/07 : CIA-RDP79T00909A000600010009-8

Source URL: https://www.cia.gov/readingroom/document/cia-rdp79t00909a000600010009-8

Links
[1] https://www.cia.gov/readingroom/document-type/crest
[2] https://www.cia.gov/readingroom/collection/nga-records-formerly-nima
[3] https://www.cia.gov/readingroom/docs/CIA-RDP79T00909A000600010009-8.pdf