Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00810A004500220003-8
Body:
Approved For Release 2007/06/01: CIA-RDP80-0081OA004500220003-8
CENTRAL INTELLIGENCE AGENC-V'
INFORMATION REPORT
This Document contains information affecting the Na-
tional Defense of the United States, within the mean-
ing of Title 18, Sections 793 and 794, of the U.S. Code, as
amended. Its transmission or revelation of its contents
to or receipt by an unauthorized person is prohibited
by law. The reproduction of this form is prohibited.
SECRET/CONTROL-U.S.OFFICIA"LS -ONLY
SUBJECT New Power Plant at Komorany
near Most
REPORT I
DATE DISTR.
NO. OF PAGES
28 July 1954
REQUIREMENT NO. RD
REFERENCES
THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE.
THE APPRAISAL OF CONTENT IS TENTATIVE.
(FOR KEY SEE REVERSE)
1. A new power plant is located southwest of the village of Komorany (N51/F12) in
the angle formed by the Komoraxry Most and Komorany Erveniee railway tracks. On
the north and northeast the power plant reaches to the Komorany-Ervenice railway
line. The southeast boundary is marked by the Kom.orany-Chomutov railroad track.
The eastern side begins about 300-400 meters west of the point where these two
tracks meet. Length of the site from west to east is 500 meters; its width from
north to south 300 meters.
2. Construction data: Foundations were laid during the last war and building was
resumed after the war. The first boiler was put into operation in March 1951.
When completed, the power plant should have a total of 5 boilers and by 1954 all
of them are supposed to be operating. The building of the power plant was carried
out by the following firms:
a. Energostav
b. PBS (Prvni brnenska strojirna Klement Gottwald-First Brno Machinery Works)
supplied high-pressure pipes and boilers and assembled them.
c. V.I. Lenin Works, Pilsen (Skoda), assembled generators.
d. Electrical Installation Plant, Prague (Elektromontazni zavody;Praha--EZ),
engaged in fitting power-distribution points of 100 KV and 6 KV capacity and
of other auxiliary distribution points.
e. Electrical Installation Plant, Teplice (Elektromontazni zavody Teplice-EZ)
carried out electrical. installations, fitted lines and cables.
3. Description of the Power Plant: The main building is 350 meters west of the junc-
tion of the two railroad tracks, about 150 meters from the Komorany-Holesice-
Chomutov line. This building is of steel-reinforced concrete, rectangular,
SECRET/CONTROL-U.S.OFFICIALS ONLY
(Not.: Washington Distribution Indicated By "X"; Field Distribution BY
Approved-For,ReIease'1 007/0610 ::: A-RDP80-00810A004500220003-8
Approved For Release 2007/06/01: CIA-RDP80-0081OA004500220003-8
SECRET/CONTROL-U.S.OFFICIALS ONLY
60 x 15 meters, 25 meters high,
burning inferior-quality coal which makes it much cheaper to opera a an
:plants.
'*e plant is guarded by factory guards. During its building numerous acts of
sabotage occurred which ptut it out of operation several times.
The power'-plant is probably the largest in Northern Bohemia. Building is not
yet eleted and it is to be expanded further south. At present it has 5
boilers, brut-more will probably be installed later. The Ervenice Power Plant
which was expanded in 1949 is still unable to cover the needs of this industrial
region. The Komorany and Ervenice plants will probably be connected to save
building new high-tension lines. The Ko oraruy power plant is equipped for
t th older
Legend to Sketch:
1. Main ilding of the power plant.
2. Velin-1O0 XV distribution station.
3. Coal bridge.
4. Coaldunp and coal-crushing machines.
5. Slag bridge.
6. Slag removal.
7. Managerial and administrative offices.
8. Wire fence.
9. Main entrance.
10. Blocks of flats belonging to the SHD. (North
11. Unfinished buildings.
12. Concrete water pool.
13. Dining room and kitchen.
14. First-aid post.
15. Office of Energostav.
16. 100-KV line.
17. Fire house.
Bohemian Lignite Mines).
18. Wooden billets.
19. Second entrance to the power plant.
20. Railroad siding.
21. Flats and offices.
22. Cooling pipes.
23. Water ping station.
24. Cooling towers.
25. Wire fence.
26. Entry to the cooling towers (not marked on the sketch).
SECRET/CONTROL-?U.S.OFFICIALS ONLY
roved For Release 2007/06/01 :CIA-RDP8O-00810A0045500220003-8
SECRET/CONTROL-U.S.OFFTCIAI8 ONLY
Approved For Release 2007X6Y04. : CIA-R180-0081 OA004500220003-8
/CONTROL-U.S.OFFICIALS ONLY
Approved For Release 2007/06/01: CIA-RDP80-0081OA004500220003-8
Approved For Release 2007/06/01: CIA-RDP80-0081OA004500220003-8
SECRET/CON D.S.OFFTCIALS ONLY
98
IN // I
99 Komo3~any
Fort
97--.
Scale 1:254000
SECBET/CQNTROL-.S.OFFICZALs ONLY
Approved Fdr Refe- : CIA-RDP8,0-00810A004500220003-8