Search

Search results

  1. PROJECT AIRCRAFT ASSIGNMENT

    MEMORANDUM FOR: Project Director SUBJECT: Project Aircraft Assignment 1. This memorandum outlines the overall ... Project aircraft situation and contains Operations recommendations for their assignment and utiliza- tion. ... The following figures are based on the assumption that all ten Project retained U-2 aircraft will be equipped ...

  2. SLIPPER TANK INSTALLATION ON U-2 AIRCRAFT

    for THERMOS would cause acme cost increase. U.2 344 is presently equipped with acceptable RAINBOW and will ... need slipper tanks that have been RAINBOW covered prior to shipment. LAC affirms this is feasible ... and practicable and that RAINBOW representative at each detachment is capable of adapting the RAINBOW installation ...

  3. MEETING WITH GENERAL GOODPASTER, 15 JULY 1957

    were the fottowing 1. Kamchatka 4 Plans for Siberian Missions. RAINBOW Program. Recent Crashes at Del Rio. S. ter ... Capability. y/Air Force Views on Developing of a U-Z /5/ RICHARD U. BELL, JR. Project Director RMB:gjg (2 Juty ...

  4. AQUATONE PLANS

    we will be allowed to operate this summer and if so, where ion and termination of this project after next ... to interception will be little higher next. Accordingly, RAINBOW improves the chances for operations this season ...