Search

Search results

  1. POLARIZER TEST EVALUATION (AIRCRAFT)

    or Modification to Operate at Shutter Speeds Compatible with 3404. C. Polarimeter 1. Bore Sighted to Cameras ... LATITUDE_ LONGITUDE AIRCRAFT PILOT TARGET ALTITUDE5000 DATE 10 Sept. 68 WEATHER Clear Vis 60 mi MOUNT ... IDENTIFICATION Albuquerque AIMING POINT LATITUDE TARGET ALTITUDE 5000' DATE 10 Sept. 68 LONGITUDE WEATHER ...

  2. WU-KUNG AIRFIELD(Sanitized)

    and modification programs. 8. The airfield and repair base are served by a network of all-weather roads and a rail ... of' Wu-kung Airfield. The repair base serves as a major maintenance and modification facility ...

  3. FINAL REPORT PREPARATION OF SIMULATIONS OF HIGH- ALTITUDE AERIAL PHOTOGRAPHY

    Some modifications in standard simulation techniques were required to achieve the desired quality in larger scale ... This would not normally be expected, as good weather was reported at acquisition. On the other hand, this anomaly ... has been noted with color acquisitions made the same day, again with clear weather. Since the aircraft probably ...

  4. PING-PA PROPULSION SYSTEM RESEARCH AND DEVELOPMENT CENTER(Sanitized)

    is well dispersed in several small valleys. 4. Applied research and improvements and modifications ... are serviceable, improved dirt roads. These roads connect the center with hard-surfaced, all-weather roads leading ...

  5. (UNTITLED)

    CREST NGA Records (Formerly NIMA) CIA-RDP78T05439A000300130013-4 RIPPUB T 80 December 28, 2016 February 17, 2004 13 REPORT Attachment Size CIA-RDP78T05439A000300130013-4.pdf 3.98 MB ILLEGIB Approved For Release 2004/07/07: CIA-RDP78TO5439A000300130013-4 N ...

  6. LAUNCH COMPLEX B, SARY SHAGAN ANTIMISSILE TEST CENTER, USSR 1960-1965

    the initial coverage of Early reports on this facility indicated possible modification was under way ... is served by an all-weather road from the main base support area, two water pipelines from Lake Balkhash, ...