Search

Search results

  1. LOGNOTE--CHIEF, OPERATIONS GROUP, 14 MARCH 1985

    in the crock of gold at the end of the rainbow if you can swallow that).- We came out pretty well ... to get DDI to provide some funding for the two TV projects. The Nicosia move will be paid out of the SF,T ...

  2. PROPOSED OPERATIONS

    `20~.3i01/24: CIA-RDP62EW844R000200080036-6 25X1 MEMORANDUM TO: Director of Operations, Project AQUATONE ... a few of the problems that would face USAFE, USAF, and Project Headquarters: (1) A minimum of 2J days is rewired ... notification in order or em to make necessary moves to insure facilities are available for Project Aquatone ...

  3. U-2 PROGRESS REPORT

    STATUS,Project airplanes. There are four project airplanes being operated by the Contractor. All four ... modifications incorporated and all of the provisions for Rainbow have been incorporated that are possible ... at this time. The Rainbow provisions are at a complete standstill pending receipt of material. Upon receipt ...

  4. CONTRACT NO. SP-1915 WITH LOCKHEED AIRCRAFT CORPORATION BURBANK CALIFORNIA PROJECT OARFISH-1 (AQUATONE)

    Rainbow requtree ts, hatches and a qL t packages, etc. alas horized by contract val letters sma ... of *2,750,,04X: chearg3.e during Fiscal Year 1957 to Project Aa ac~'....~_._. obligated ...

  5. WEIGHT REDUCTION OF THE U-2

    For Rase 2003/(RA-RDP33-02415A9400380194-1 SAPC-15303 Copy! of 6o MEMORANDUM FOR: Project Director Director ... I believe the main ""fly in the ointment" is the added weight of Rainbow which is still ...

  6. PROJECT 9009, SESSION NUMBER: 2, CRV, VIEWER: 018

    INTELLIGENCE._.SOURCES AND_METHODS_INVOLVED__--------__--r------------------------------------------ PROJECT NUMBER: 9009 ... CIA-RDP96-00789R000900410037-8 STIPPLED NOFORN SPECIAL ACCESS REQUIRED T Project: 900 Date: 90032 Time: 0 13-0937 Viewer: 018 ... of visible light (rainbow), the receiving ship's frequency would be located at light green. Another ...

  7. STATUS OF RAILROAD CONSTRUCTION PROJECTS

    CENTRAL INTELLIGENCE AGENCY Status of R&.iLroad Construction Projects 25X1 0NFOI MA JO.J ORt-. cD ... in 1954. This project includes the construction of connecting curves near Uustermark.2 3. On 1 October,, ... of the westring Berlin was started. This project continued the Nordring, which covers the section between Karow ...

  8. FRANCE BLAMES 2 AIDES IN SHIP RAID

    of the antinuclear protest ship Rainbow Warrior, blamed two for- senior French Government offi- tonight ... by the Minis- ter of Defense about the preparation of this project," Mr. Fabius said. "When the attack ... one tried to sabotage the sabotage?" The Rainbow Warrior was sunk by two explosives attached ...

  9. AQUATONE PLANS

    we will be allowed to operate this summer and if so, where ion and termination of this project after next ... to interception will be little higher next. Accordingly, RAINBOW improves the chances for operations this season ...

  10. CONTINUATIONOF AQUATONE BEYOND 1957

    The Life of the U-2: It appears likely that the RAINBOW develop- ment will sufficiently increase ... questioned, at least in the Air Force. Moreover, it was always contemplated by the Air Force that the Project ... the organization appropriate for a continued AQUA TONE project, and the building of new cover to replace ...

  11. OPERATIONAL PROCEDURES AND COORDINATION WITH HEADQUARTERS USAF AND SAC

    was voiceet by 3AC. This was in regard to cur procedure for; lon missions volving_RAINBOW atr 2)(1 craft, ... that SAC should have a liaison offieerpleyeically located in Project Opera tions to aid in planning. ... that existing procedures for coordination between the Project, Headquarters USAF, and SAC were adequate and, ...

  12. HIGH LEVEL MEETING ON PROJECT AQUATONE

    that the Pkesside Targets. b. The RAINBOW Program. c. Maintenance of a o%-Military Overflight Capability d. Proposed ...

  13. PROJECT MANAGERS CONFERENCE TRICKS OF THE TRADE PROCEEDINGS

    6, 2004 Attachment Size project managers conferen[15205800].pdf 2.9 MB Approved for Release: ... C06465174 APPMC PROFESSIONAL PROJECT MANAGER CERTIFICATION Courses PM101- Introduction to PM and SE (5 days) ... Professional Project Management Certification �7!..L. I FY05 PPMC Curriculum!!' ... ...._.__.._...9..~___.....-_...-.t...-.._-......-._._..-...._..._.2_..(.......,_.,......~_._..__l..._. t = t 1 I____~jA“v__‘___Vj¢_+j__Professional Project Management Certifigatio g j M"'"'"'~j'*"“7”' ... r 1 F"_PM201- Project Integration and Scope Mgmt (4 days). W‘ ~12-15 » " 20-23_ ~ ~_- »-7-10 ', PM202- ... Project Time Management (3 days)_, r_ ' 18-20 *PM203-ProjectCostManagement(3days)- W 25-27. 4-a ...

  14. (UNTITLED)

    danger of this ruse tb eB mention Cr the'Hammond project NOW hest- JX sMOr. n[GMlttra1 temgence, nt. ... participating project. ^""'-"" Ardaft entitled "'19te Ooaaalty Aatwad- ... tide Taaapa (Pi..-, Qfibutae qL JasUary?10. Lions for the project to $189,821,000.,er Oft. K about 25 ...

  15. ICELAND: TALKING POINTS FOR THE DCI

    Hallgrimsson has paved the way for government approval of many defense modernization;projects ... of these projects. At the same time, the financial problems have made the government and the public more aware ... relations with the US. In 1984 an American transatlantic shipping company-- Rainbow Navigation, Inc.-- began ...

  16. THIRD/FOURTH US-BASED FMLN/FDR SUPPORT

    FOR FMLN PROJECTS IN FPL AREAS OF INFLUENCE IN CHALATENANGO PROVINCE. END SUMMARY. 2. MAES: MEDICAL AID ... UNDERWAY. NEW EL SALVADOR TODAY (NEST) HAS BEGUN A FUNDRAISING DRIVE FOR PROJECTS IN FPL-INFLUENCED AREAS ... OF THE UNTS CONFERENCE AND AS A FORMER MEMBER OF THE RAINBOW COALITION AND SANE, IS ALSO IDENTIFIED BY NEST ...

  17. NOTE BY THE SECRETARIES TO THE JOINT INTELLEGENCE GROP ON STANDING OPERATING PROCEDURE JOINT INTELLIGENCE GROUP, THE JOINT STAFF

    and Security Section is organized into teams, designated as the-RED, WHITE, BLUE, RAINBOW, and GREEN Teams, ... Director, the senior Assistant Underlining used for emphasis only; After a project has been initiated, ... by the Deputy Director for Intelligence or the Assistant Directors. (2) RAINBOW Team. The Rainbow Team shall: ...

  18. PROJECT NUMBER: 9009, SESSION NUMBER: 2, CRV, VIEWER: 018

    NOTICE: INTELLIGENCE SOURCES AND METHODS INVOLVED PROJECT NUMBER: 9009 SESSION NUMBER: DATE OF SESSION: ... STIPPLED NOFORN SPECIAL ACCESS REQUIRED Project: 9009 Date: 90032- Time: 0913-0937 Viewer: 018 Session: 02 ... the HF spectrum over a spectrum of visible light (rainbow), the receiving ship's frequency ...

  19. THE REAL WORLD OF INTELLIGENCE

    to write a few lines for The Rainbow. A year or so ago it would not have seemed appropriate ... and information from the military intellience services- C, RAINBOW Approved For Release 2004/11/01: ... X/Aok, 29 September 1976 Mr. David N. Keller Editor The Rainbow of Delta Tau Delta 4740 Kingsway Drive ...

  20. COMMUNICATION PILOT PROJECT

    COIIlIf1UIIICATI0II PILOT PROJECT (U) 5 JRIIUA:R' 1993 NOFORN SECRET ~S STAR GATE Approved For Release ... SECRET COMMUNICATION PILOT PROJECT SHORT TITLE: DTI-S-1053-SL Date of Publication 5 January 1993 ... CIA-RDP96-00789R003300260001-7 SECRET (S/NF/SG/LIMDIS) This project is part of on-going proficiency enhancement activity ...

Pages