Search

Search results

  1. PROGRAM PROGRESS REPORT

    Director, CIA Reconnaissance Programs SUBJECT: Program Progress Report (5 Forwarded herewith are Program ... Connecticut, by OEL and 25X1A PSD for a quarterly review or progress on the 25X1D 25X1D program which OEL ... This modification includes a mummy-type sleeping bag suitable for survival in NVN and a personnel lowering device ...

  2. RESUME AND CRITIQUE OF MISSION C229C

    Security Staff, Communications Division, Avionics Division, Weather Division, Office of ELINT, Office ... of the mission: exe- Mission preparation and- Forecast and actual weather.- Materiel and. Avionics- Communications ... Reserve at HiCone 175 Gallons 3. Weather; The weather forecast was for Category II with light haze except ...

  3. PROPOSED OPERATION OF U-2 AIRCRAFT FROM AIRCRAFT CARRIER

    and tracker film. Original negatives can be produced and PI'd on board with only a small modification ... weather, wind, and visibility, a feature not enjoyed by a fixed land base. B. Disadvantages of Carrier ... modification. It may be that this penalty will eventually be larger than that conservative figure, ...

  4. PROJECT CORONA

    up and carrying through covertly of a program already undertaken together with technical modifications therein ... Provision for the development of both of these configura- tions represents a technical change in the program ... that this procedure is desirable and will constitute a well balanced program. Development of the first configuration ...

  5. HEADQUARTERS LANGLEY, VIRGINIA

    would be requixed~ as would modification z~7ork to the leased space. A "checkerboard" program ... would be required to effect the necessary moves, as would funds for leasing and modification of the outside space.? ... c. Langley is easily accessible by public and private transportation via all weather highways. d. ...

  6. HEADQUARTERS LANGLEY, VIRGINIA

    to the existing building would be required, as would modification work to the leased space. ... A "checkerboard" program would be required to effect the necessary moves, as would funds for leasing ... and modification of the outside space. 3. Considerations: a. Depending upon final site selection, it will".:be ...

  7. PROGRAM PROGRESS REPORT

    Director, CIA Reconnaissance Programs SUBJECT: Program Progress Report Forwarded herewith are Program ... no major life support development activities occurred. Modification kits for each pilot's pressure ... in the past. Included in the modifications are pressure relief valves for protection against inadvertent ...

  8. PROGRAM PROGRESS REPORT

    was flown on 31 January 1973. Weather again precluded coverage of all programmed targets; however, 16 ... MEMORANDUM FOR: Director, CIA Reconnaissance Programs SUBJECT: Program Progress Report Forwarded herewith ... are three copies of the IDEALIST Program Progress Report for the period 1 January 1973- 31 March 1973, ...

  9. PROJECT IDEALIST CONCEPT OF OPERATIONS

    to Lockheed Aircraft for complete IRAN and modifications. Provisions have been made in Detachment B hangar ... development programs for new equipment and tactics and training new and replacement personnel. Detachment ... be accomplished by Headquarters. c. Reconnaissance operations will be programmed to cover targets of interest ...

  10. PROJECT OXCART- SECURITY (FOREIGN OBJECT DAMAGE TO ENGINES (Sanitized)(Sanitized))

    in some degree to laxity in the physical management of the flight test program 25X1A 25X1A I particularly ... resulting from such a program are somewhat prohibitive?25X1A On 2 May, Mr. C. L. Johnson discussed ... after some modification of the nacelle. The latter characteristic was proven by the history of Aircraft 121; ...

  11. OFFICE OF LOGISTICS SIGNIFICANT ACCOMPLISHMENTS FY 1967

    Contributions to the Agency a. Support Planning Team, Revolutionary Development Program, Vietnam Chief, Supply ... with the Vietnam Station, this team developed support programs and related management controls for FY 1967 and FY ... 1968 to measure the resources required to these carry out the Revolutionary Development Program ...

  12. ACTIVITIES REPORT FOR OPERATIONS BRANCH 27 NOVEMBER- 3 DECEMBER 1960

    OPS/P1ans, (3) Subject: GREEN EYES Date: Dependent on Weather CONTROL CENTER: a. Negative report ... Tests equested: 12 August spense: I April ctionee: OPS/RS and DB Su bject: Modification and IRAN (Cargo ... in this program, and will call on Operations for whatever assistance to required. Approved For Release 2002/10/31: ...

  13. REPORT ON THE NATIONAL COMMUNICATIONS SYSTEM

    of the NCS is to be placed on meeting the needs for com- munications in the national security programs ... the most critical needs of survival in any national emergency, and b) Developing plans, programs, procedures, ... June 1961, a projection of FY-?64 programs was required. Although NSAM-252 "conceived that the NCS ...

  14. TRIP REPORT OF (Sanitized) AUGUST 7 TO AUGUST 29, 1959

    were occurring when they were flown in weather hatches. In these hatches the cameras run under conditions ... record has shown considerable improvement. The weather hatch trouble was not in evidence at Detachment ... was brought to my attention. The programer was not being used because its minimum slit width cam ...

  15. LETTER TO MAJOR LESLIE J. GREENWOOD FROM LYNN L.BOLLINGER

    tYpevienione. Among the substantial modifications now available for military *Prlioatiam, for example, ... capacity for six.,:iso avail- able is an internal opening door and Other modifications to facilitate low ... We were advised that the L-28 was several tines pulled off its test program in order to substitute on missile base ...

  16. THE NORTHERN SEA ROUTE

    must depend on the extensive Soviet icebreaking and weather forecasting services, foreign use ... is controlled by the Ministry of the River Fleet. Weather and ice forecasting, as well as Arctic scientific ... weather- and ice-forecasting facilities, and developed staging, dispatching, and controlling procedures ...

  17. SUMMARY OF OSA ACTIVITIES FOR WEEK ENDING 7 AUGUST 1963

    a supplier with a lower price for spec fuel. 3. Several modifications are being made at this time ... to the KC-135's used in support of our OXCART and IDEALIST programs. A strobe light was installed in one plane ... program problems and spent the 25X1 A next day at 0 for on-site meetings. An agreement was reached ...

  18. ACTIVITIES REPORT FOR OPERATIONS BRANCH 20- 26 NOVEMBER 1960

    they would accomplish the IIRB test flights without re rte rursement. 25X1 ci. I I completed modification and test ... I April 1961 Actionee: OPS/RS and DB (3) Subject: Modification and IRAN (Cargo Version) Requested: 15 ... IRAN and retrofit program in accordance with new timetable. (25) Monitor the Development Branchproject. ...

  19. JOURNAL- OFFICE OF LEGISLATIVE COUNSEL

    staff, who asked if the Agency could provide the Committee with a brief survey of weather modification ... Pell's short press release over the weekend concerning alleged weather modification of American forces ... since we did not keep track of US weapons programs. However, on the instructions of the Director, ...

  20. AGREEMENT FOR REORGANIZATION OF THE NATIONAL RECONNAISSANCE PROGRAM

    OF THE NATIONAL RECONNAISSANCE PROGRAM Set forth below are certain basic assumptions which determine ... the organization appropriate for the administration and direction of the National Reconnaissance Program (NRP). A. ... of technical capabilities and fiscal limitations. 2. Approve or modify the consolidated NR program ...

Pages