Search

Search results

  1. MISSION 1103 PHOTOGRAPHIC EVALUATION INTERIM REPORT

    AND FOCUS. THIS MISSION WAS SEVERELY AFFECTED BY HAZE, BUT IT. CANNOT BE POSITIVELY STATED THAT WEATHER ... PORTIONS IS NOT EVIDENCED LATER IN THE MISSION, EVEN WHEN FAVORABLE WEATHER CONDITIONS EXISTED. ... MODIFICATION IS BEING CONSIDERED FOR THE THREE CAMERAS WHICH DO NOT HAVE F/6.3 LENSES. 6. DISIC ANOMALIES A. ...

  2. MISSION 1028 PHOTOGRAPHIC EVALUATION INTERIM REPORT (PEIR)

    SINCE THERE WAS ONLY ONE TARGET COMPLEX IMAGED UNDER GOOD WEATHER CONDITIONS THROUGH THE ENTIRE MISSION, ... MISSION PROGRAMMING IN THE EVENT OF INSTRUMENT ANOMALIES. (3) INVESTIGATE POSSIBLE MODIFICATION ... EFFEf D SY POOR WEATHER CONDITIONS. D. THE FOLLOWING AREAS WILL BE INVESTIGATED IN AN EFFORT TO EITHER ...

  3. MISSION 1034 PHOTOGRAPHIC EVALUATION INTERIM REPORT

    WITH THAT OF MISSION 1033. C. WEATHER IS ALWAYS A DEGRADING FACTOR IN SATELLITE PHOTOGRAPHY AND, STATISTICALLY, SUMMER ... SLIGHTLY IN A FEW INTANCES. ACTION: MODIFICATIONS TO MAIN CAMERA LIGHT SEALS HAVE BEEN MADE EFFECTIVE ...

  4. SSU-PING CHEMICAL PLANT SSU-PING, CHINA

    which measures about 4,400 by 3,400 feet and contains 345 acres. It is served by a good all-weather road system ... there have been only minor additions and modifications to the plant. The possible vinylon plant was first seen in operation ...

  5. MISSION 1105 PHOTOGRAPHIC EVALUATION INTERIM REPORT (PEIR)

    THE INTERACTION OF THE UTB WITH THE CR-5 SYSTEM (SEE NEXT SECTION) MODIFICATIONS WERE MADE TO' CR-5 T.O' ... THE MISSION EXPERIENCED GENERALLY CLEAR. WEATHER OVER DENIED AREAS.. FURTHER, THERE. WAS A LARGE PERCEJTAGE ... ACTION: EFFECTIVE ON CR-S MODIFICATIONS WHICH LENGTHEN THE AIR TWISTS ARE EXPECTED TO REDUCE THIS EFFECT. ...

  6. THIRD OF FOUR OAK REPORTS FOR MISSION 4031

    THE A$HTUBINSK/VLADIMIROVKA AIRFIELD. AT THE TYURATAN MISSILE TEST CENTER LAUNCH COMPLEX G. MODIFICATION AND CONSTRUCTION ... PARTIALLY COVERED "Y WEATHER SHEDS, AND 1 POSSIBLE VESSEL UNDER WEATHER SHEDS ON WAY NEAREST LAUNCHING ... RA~"P. NUMEROUS WEATHER SHEDS ARE SCATTERED THROUGHOUT THE BUILDING AREA. A SHORT 3-RAIL TRANSVEPSER ...

  7. MISSION 1104 PHOTOGRAPHIC EVALUATION INTERIM REPORT (PEIR)

    CAPABILITY OF TYPE SO-180 FILM COMPARED TO 3404). WHEN THE WEATHER CONDITIONS WERE FAVORABLE, ... THE 12-22 MICORN REGION IS NOT THE NORMAL IDLING PRESSURE FOR 3404 AND HENCE A MODIFICATION WAS MADE ...