CKD SHIPYARDS, PRAGUE AND USTI NAD LABEM
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
02936430
Release Decision:
RIPPUB
Original Classification:
U
Document Page Count:
1
Document Creation Date:
March 8, 2023
Document Release Date:
October 4, 2019
Sequence Number:
Case Number:
F-2018-01373
Publication Date:
August 7, 1953
File:
Attachment | Size |
---|---|
![]() | 61.28 KB |
Body:
Approved for Release: 2019/07/30 CO2936430
CENTRAL INTELLIGENCE AGENCY
INFORMATION REPORT
This Document manillas information affect' as the Na-
tional Defense of the Vatted States, witisin the mean-
ing of Title IL Sections 703 and 794, of this Us. Code, as
amended. Ito transmission or revelation Ofts contents
to or receipt by an unauthorized Person is Prohibited
by law. The reproduction of this form is prohibited.
ST/CONTROL - U. S. OFFICIALS ONLY
SECURITY INFORMATION
COUNTRY
SUBJECT
Czechoslovakia
CKD Shipyards, Prague and Usti
nad Labem
REPORT NO.
DATE DISTR.
NO. OF PAGES
1
REQUIREMENT NO. RD
REFERENCES
APINNOMPP-Millimir
(b)(1)
(b)(3)
7 Aogubt 1953
(b)(1)
(b)(3)
(b)(1)
(b)(3)
THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE.
THE APPRAISAL OF CONTENT IS 'TENTATIVE.
(FOR KEY SEE REVERSE)
(b)(1)
(b)(3)
CKD Shipyard. Praeue
1. The last four barges for the Czechoslovak Elbe-Oder Navigation ComparAy-
(CSPLO) are being completed at the CKD Shipyard at Prague, and production
is being switched to the manufacture of dredges for the USSR. Work began
on the dredges in January 1953.
2. Originally the Soviet order was for dredges 14 meters wide, but it WWII
learned that they would not be able to pass through the locks on the way
to Szczecin (Stettin), so the width had to be reduced to 9 meters. The
engines are supplied by Skoda. All parts for the dredges are required
to be marked in the Russian language.
3. In order to fulfil the Soviet orders the shipyards have started an in-
tensive recruitment drive for workers. In Prague there are notices in
trolley cars appealing to workers to volunteer for the shipyards. Pay
and working conditions are believed to be quite good.
CKD Shipyard. gpti mad Labem
4. At the beginning of March 1953 a group of military experts were seen at
the CKD Shipyard, Usti nad Labem, taking over approximately 50 completed
pontoons which were painted red. Further pontoons were also observed to
be under construction. The pontoons consist of three parts and have a
total length of eight to nine meters each. The center part is about two-
and-one-half meters long and is airtight. The parts of the pontoons are
welded together, not riveted.
/CONTROL - U. S. OFFICIALS ONLY
STATE x
ARMY
NAVY
x IAIR
FBI
AEC
1 1 1
Notes Washington Distribution indicated By "X", Field Distribution By "*".)
Approved for Release: 2019/07/30 CO2936430